IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Otter Creek  Date: 10/21/2021  Project No.  
  Lake Restoration - Phase 3  County:   TAMA  Time: 11:00 AM  21-05-86-02

 

 
1
2
3
Estimated Cost: $3,328,481.00
Contractor: 
Rachel Contracting, LLCCJ Moyna & Sons, LLCLegacy Corporation of IL
Funding Source: 100% Lake Restoration, 4180 Napier Ct NE
24412 Hwy 13
16322 Barstow Rd
St Michael MN  55376Elkader IA  52043East Moline IL  61244
Plan Sets Requested: 2
Quantities
763424150056324514423092031094
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$470,000.00$470,000.00 $330,000.00$330,000.00 $109,700.00$109,700.00 
2CLEARING AND GRUBBING1L.S.$269,000.00$269,000.00 $45,000.00$45,000.00 $25,000.00$25,000.00 
3EROSION CONTROL (SWPPP)1L.S.$85,000.00$85,000.00 $45,000.00$45,000.00 $37,375.00$37,375.00 
4SURVEY1L.S.$45,000.00$45,000.00 $50,000.00$50,000.00 $55,000.00$55,000.00 
5SEEDING - GRASS SEED MIX14Acres$1,200.00$16,800.00 $1,500.00$21,000.00 $2,875.00$40,250.00 
6BMP 5 - HANDLING OF WATER1L.S.$7,500.00$7,500.00 $35,000.00$35,000.00 $27,350.00$27,350.00 
7BMP 5 - DREDGE19000C.Y.$5.70$108,300.00 $12.00$228,000.00 $10.20$193,800.00 
8BMP 5 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL66C.Y.$12.00$792.00 $30.00$1,980.00 $32.00$2,112.00 
9BMP 5 - TRENCH EXCAVATION, STOCKPILE AND BACKFILL182C.Y.$12.00$2,184.00 $7.50$1,365.00 $46.00$8,372.00 
10BMP 5 - REMOVE AND DISPOSE EXISTING 72" CMP257L.F.$7.50$1,927.50 $25.00$6,425.00 $50.20$12,901.40 
11BMP 5 - NON-SHRINK GROUT FOR PIPE PLUGS7C.Y.$800.00$5,600.00 $700.00$4,900.00 $781.00$5,467.00 
12BMP 5 - CLASS "B" ROCK RIPRAP30Tons$63.00$1,890.00 $110.00$3,300.00 $51.00$1,530.00 
13BMP 5 - GRAVEL FOR ROAD REPLACEMENT7C.Y.$50.00$350.00 $180.00$1,260.00 $36.00$252.00 
14BMP 5 - SEEDING - GRASS SEED MIX0.2Acres$1,200.00$240.00 $1,500.00$300.00 $9,200.00$1,840.00 
15BMP 5 - EROSION CONTROL MATTING105S.Y.$1.15$120.75 $1.75$183.75 $5.70$598.50 
16BMP 15 - HANDLING OF WATER1L.S.$12,500.00$12,500.00 $35,000.00$35,000.00 $83,600.00$83,600.00 
17BMP 15 - REMOVE AND DISPOSE OF EXISTING RISER1Each$3,500.00$3,500.00 $400.00$400.00 $750.00$750.00 
18BMP 15 - REMOVAL OF EXISTING PIPE125L.F.$14.00$1,750.00 $25.00$3,125.00 $55.00$6,875.00 
19BMP 15 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL1826C.Y.$12.00$21,912.00 $12.00$21,912.00 $11.80$21,546.80 
20BMP 15 - OVEREXCAVATE AND HAUL TO SPOIL SITE3066C.Y.$5.70$17,476.20 $16.00$49,056.00 $9.70$29,740.20 
21BMP 15 - EARTH EMBANKMENT15832C.Y.$10.00$158,320.00 $11.00$174,152.00 $14.30$226,397.60 
22BMP 15 - 12" KNIFE GATE VALVE1Each$12,500.00$12,500.00 $32,000.00$32,000.00 $23,062.50$23,062.50 
23BMP 15 - 12" PVC DRAWDOWN PIPE18L.F.$105.00$1,890.00 $128.00$2,304.00 $85.20$1,533.60 
24BMP 15 - 30" HDPE PIPE96L.F.$175.00$16,800.00 $150.00$14,400.00 $110.60$10,617.60 
25BMP 15 - 36" CMP20L.F.$130.00$2,600.00 $135.00$2,700.00 $217.10$4,342.00 
26BMP 15 - CONCRETE COLLAR AND FOOTING1Each$17,500.00$17,500.00 $2,000.00$2,000.00 $6,500.00$6,500.00 
27BMP 15 - 12" PVC PIPE TRASH RACK1Each$350.00$350.00 $1,350.00$1,350.00 $2,625.00$2,625.00 
28BMP 15 - RISER FORMED CONCRETE16C.Y.$3,720.00$59,520.00 $2,000.00$32,000.00 $1,725.00$27,600.00 
29BMP 15 - RISER STEEL REINFORCEMENT2666LB.$2.00$5,332.00 $6.00$15,996.00 $2.30$6,131.80 
30BMP 15 - RISER METAL FABRICATION1L.S.$12,000.00$12,000.00 $14,500.00$14,500.00 $4,500.00$4,500.00 
31BMP 15 - RISER STEPS10Each$200.00$2,000.00 $300.00$3,000.00 $370.00$3,700.00 
32"BMP 15 - MJXFL DIP WITH WALL COLLAR AND MJ GLAND AND GASKET"1L.S.$2,000.00$2,000.00 $2,650.00$2,650.00 $3,125.00$3,125.00 
33BMP 15 - CLASS "B" ROCK RIPRAP88Tons$63.00$5,544.00 $80.00$7,040.00 $55.00$4,840.00 
34BMP 15 - CLASS "E" ROCK RIPRAP24Tons$56.25$1,350.00 $90.00$2,160.00 $55.00$1,320.00 
35BMP 15 - ROCK RUBBLE12Tons$53.00$636.00 $150.00$1,800.00 $37.70$452.40 
36BMP 15 - SEEPAGE FILTER SAND FOR DIAPHRAGM FILTER11C.Y.$110.00$1,210.00 $110.00$1,210.00 $69.90$768.90 
37BMP 15 - 8" SOLID WALL PVC DRAIN PIPE55L.F.$39.00$2,145.00 $160.00$8,800.00 $23.60$1,298.00 
38BMP 15 - 8" SLOTTED WALL PVC10L.F.$39.00$390.00 $160.00$1,600.00 $29.80$298.00 
39BMP 15 - REMOVE AND SALVAGE EXISTING CULVERT1Each$350.00$350.00 $7,500.00$7,500.00 $650.00$650.00 
40BMP 15 - PLACE SALVAGED CULVERT1Each$500.00$500.00 $7,500.00$7,500.00 $850.00$850.00 
41BMP 15 - CULVERT CROSSING CLASS "E" ROCK RIPRAP40Tons$56.25$2,250.00 $120.00$4,800.00 $55.00$2,200.00 
42BMP 15 - CULVERT CROSSING CLASS "B" ROCK RIPRAP6Tons$63.00$378.00 $250.00$1,500.00 $55.00$330.00 
43BMP 15 - CULVERT CROSSING EARTH EMBANKMENT412C.Y.$11.25$4,635.00 $30.00$12,360.00 $15.30$6,303.60 
44BMP 15 - TRAIL REALIGNMENT EMBANKMENT210C.Y.$45.00$9,450.00 $40.00$8,400.00 $15.30$3,213.00 
45BMP 15 - SEEDING - GRASS SEED MIX6Acres$1,200.00$7,200.00 $1,500.00$9,000.00 $2,875.00$17,250.00 
46BMP 15 - EROSION CONTROL MATTING5477S.Y.$1.15$6,298.55 $1.75$9,584.75 $2.30$12,597.10 
47CAMPGROUND IMPROVEMENTS - EARTH EMBANKMENT430C.Y.$30.00$12,900.00 $28.00$12,040.00 $15.30$6,579.00 
48CAMPGROUND IMPROVEMENTS - ELECTRIC BOX RAISE1Each$2,000.00$2,000.00 $2,500.00$2,500.00 $10,500.00$10,500.00 
49CAMPGROUND IMPROVEMENTS - WATER HYDRANT RAISE2Each$1,265.00$2,530.00 $4,000.00$8,000.00 $6,500.00$13,000.00 
50CAMPGROUND IMPROVEMENTS - TREE TRANSPLANT3Each$500.00$1,500.00 $1,500.00$4,500.00 $250.00$750.00 
51CAMPGROUND IMPROVEMENTS - EROSION CONTROL MATTING3829S.Y.$1.15$4,403.35 $1.75$6,700.75 $2.30$8,806.70 
52CAMPGROUND IMPROVEMENTS - SEEDING - GRASS SEED MIX1.2Acres$1,200.00$1,440.00 $1,500.00$1,800.00 $4,025.00$4,830.00 
53DREDGE133064C.Y.$5.70$758,464.80 $10.00$1,330,640.00 $9.70$1,290,720.80 
54SHORELINE - OPEN-CELLED GEOGRID EROSION PROTECTION465L.F.$80.00$37,200.00 $25.00$11,625.00 $130.00$60,450.00 
55"SHORELINE - SHALLOW EROSION PROTECTION WITH GRAVEL BED"759L.F.$102.00$77,418.00 $46.00$34,914.00 $99.70$75,672.30 
56SHORELINE - MEDIUM EROSION PROTECTION1359L.F.$86.75$117,893.25 $30.00$40,770.00 $68.80$93,499.20 
57SHORELINE - DEEP EROSION PROTECTION1347L.F.$145.00$195,315.00 $58.00$78,126.00 $115.30$155,309.10 
58JETTY - EMBANKMENT8504C.Y.$3.35$28,488.40 $14.00$119,056.00 $15.30$130,111.20 
59JETTY - DREDGE1124C.Y.$5.70$6,406.80 $15.00$16,860.00 $17.10$19,220.40 
60JETTY - CLASS "E" ROCK RIPRAP1677Tons$56.25$94,331.25 $62.00$103,974.00 $110.00$184,470.00 
61JETTY - GRASS SEED MIX0.2Acres$1,200.00$240.00 $1,500.00$300.00 $6,325.00$1,265.00 
62SPOILS SITE - EARTH EMBANKMENT7718C.Y.$8.50$65,603.00 $12.00$92,616.00 $14.70$113,454.60 
63SPOILS SITE - 15" SOLID WALL PVC & APPURTENANCES74L.F.$90.00$6,660.00 $125.00$9,250.00 $72.30$5,350.20 
64SPOILS SITE - 15" PERFORATED PVC RISER W/ SOCK1Each$1,800.00$1,800.00 $2,000.00$2,000.00 $3,130.50$3,130.50 
65SPOILS SITE - 12" SOLID WALL PVC & APPURTENANCES87L.F.$64.50$5,611.50 $120.00$10,440.00 $48.10$4,184.70 
66SPOILS SITE - 12" PERFORATED PVC RISER W/ SOCK1Each$1,285.00$1,285.00 $1,600.00$1,600.00 $1,590.00$1,590.00 
67SPOILS SITE - CLASS "E" ROCK RIPRAP4Tons$56.25$225.00 $300.00$1,200.00 $66.70$266.80 
68SPOILS SITE - SEEDING - COVER CROP14.4Acres$800.00$11,520.00 $1,000.00$14,400.00 $4,025.00$57,960.00 
69SPOILS SITE - REMOVAL OF ELECTRICAL BOX1Each$500.00$500.00 $600.00$600.00 $1,500.00$1,500.00 
70SPOILS SITE - ABANDON ELECTRICAL UTILITY LINE240L.F.$2.00$480.00 $15.00$3,600.00 $8.00$1,920.00 
71SPOILS SITE - GAS LINE PROTECTION1L.S.$1,500.00$1,500.00 $8,500.00$8,500.00 $2,500.00$2,500.00 
72FISH HABITAT - ROCK STAR11Each$1,850.00$20,350.00 $3,500.00$38,500.00 $550.00$6,050.00 
73FISH HABITAT - UNDERWATER SHOAL9Each$1,800.00$16,200.00 $2,000.00$18,000.00 $2,499.00$22,491.00 
74FISH HABITAT - TREE PILE25Each$675.00$16,875.00 $1,500.00$37,500.00 $375.00$9,375.00 
75FISH HABITAT - SHOT ROCK450Tons$52.00$23,400.00 $50.00$22,500.00 $37.70$16,965.00 
76FISH HABITAT - MISC. EXCAVATOR WORK54HR.$225.00$12,150.00 $320.00$17,280.00 $205.00$11,070.00 
77STREAM MITIGATION - CLASS "E" ROCK RIPRAP538Tons$56.25$30,262.50 $72.00$38,736.00 $55.00$29,590.00 
78STREAM MITIGATION - EXCAVATION298C.Y.$4.00$1,192.00 $24.00$7,152.00 $32.00$9,536.00 
79STREAM MITIGATION - SEEDING - FLOODPLAIN SEED MIX0.7Acres$1,200.00$840.00 $3,000.00$2,100.00 $6,325.00$4,427.50 
80STREAM MITIGATION - SEEDING - GRASS SEED MIX2.6Acres$1,200.00$3,120.00 $1,500.00$3,900.00 $2,875.00$7,475.00 
81STREAM MITIGATION - EROSION CONTROL MATTING1000S.Y.$1.15$1,150.00 $1.75$1,750.00 $2.30$2,300.00 
82STEP POOL - EXCAVATION225C.Y.$6.50$1,462.50 $30.00$6,750.00 $32.00$7,200.00 
83STEP POOL - FILTER FABRIC49S.Y.$26.50$1,298.50 $12.00$588.00 $6.00$294.00 
84STEP POOL - STEP POOL BOULDERS39Tons$170.00$6,630.00 $280.00$10,920.00 $175.00$6,825.00 
85STEP POOL - SCOUR POOL STONE MIX63.7Tons$200.00$12,740.00 $250.00$15,925.00 $31.10$1,981.07 
86STEP POOL - SEEDING - FLOODPLAIN SEED MIX0.1Acres$1,200.00$120.00 $3,000.00$300.00 $11,500.00$1,150.00 
87STEP POOL - EROSION CONTROL MATTING520S.Y.$1.15$598.00 $1.75$910.00 $2.30$1,196.00 
88STEP POOL - REMOVE 18" DIA CMP20L.F.$7.50$150.00 $25.00$500.00 $35.00$700.00 
89"PARKING LOT AND PLAYGROUND - STRIP, STOCKPILE AND REPLACE 9"" TOPSOIL"2458C.Y.$11.50$28,267.00 $8.00$19,664.00 $13.10$32,199.80 
90PARKING LOT AND PLAYGROUND - EMBANKMENT14116C.Y.$4.25$59,993.00 $12.00$169,392.00 $14.90$210,328.40 
91PARKING LOT AND PLAYGROUND - GRAVEL SURFACING571C.Y.$50.00$28,550.00 $60.00$34,260.00 $55.90$31,918.90 
92PARKING LOT AND PLAYGROUND - LIMESTONE CHIP SURFACING37C.Y.$50.00$1,850.00 $120.00$4,440.00 $65.30$2,416.10 
93PARKING LOT AND PLAYGROUND - PCC SURFACING82C.Y.$650.00$53,300.00 $800.00$65,600.00 $557.70$45,731.40 
94PARKING LOT AND PLAYGROUND - SEEDING - GRASS SEED MIX1.6Acres$900.00$1,440.00 $1,500.00$2,400.00 $2,875.00$4,600.00 
95PARKING LOT AND PLAYGROUND - EROSION CONTROL MATTING7550S.Y.$1.15$8,682.50 $1.75$13,212.50 $2.30$17,365.00 
96PARKING LOT AND PLAYGROUND - SIGNAGE AND MARKINGS1L.S.$1,500.00$1,500.00 $8,000.00$8,000.00 $5,000.00$5,000.00 
97PARKING LOT AND PLAYGROUND - WOOD POSTS17Each$435.00$7,395.00 $500.00$8,500.00 $175.00$2,975.00 
98"PARKING LOT AND PLAYGROUND - REMOVE AND REPLACE ELECTRIC LINE"1L.S.$5,000.00$5,000.00 $12,500.00$12,500.00 $15,750.00$15,750.00 
99"PARKING LOT AND PLAYGROUND - RELOCATE WATER LINE AND WATER HYDRANT"1L.S.$1,750.00$1,750.00 $13,500.00$13,500.00 $20,000.00$20,000.00 
100CLASS "E" ROCK RIPRAP214C.Y.$53.00$11,342.00 $80.00$17,120.00 $63.60$13,610.40 
      $3,198,314.35  $3,771,424.75  $3,824,127.07 
Alternate        
101DREDGE17871C.Y.$7.50$134,032.50 $10.00$178,710.00 $9.70$173,348.70 
Alternate        
102SHORELINE - OPEN-CELLED GEOGRID EROSION PROTECTION260L.F.$80.00$20,800.00 $25.00$6,500.00 $130.00$33,800.00 
Alternate        
103"SHORELINE - SHALLOW EROSION PROTECTION WITH GRAVEL BED"299L.F.$102.00$30,498.00 $46.00$13,754.00 $99.70$29,810.30 
Alternate        
104SHORELINE - MEDIUM EROSION PROTECTION481L.F.$86.75$41,726.75 $30.00$14,430.00 $68.80$33,092.80 
      $3,425,371.60  $3,984,818.75  $4,094,178.87 
 
4
5
6
Estimated Cost: $3,328,481.00
Contractor: 
Veit & Company, Inc.
Funding Source: 100% Lake Restoration, 14000 Veit Place


Rogers MN  55374    
Plan Sets Requested: 2
Quantities
7634282242
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$243,780.00$243,780.00 $0.00 $0.00 
2CLEARING AND GRUBBING1L.S.$53,650.00$53,650.00 $0.00 $0.00 
3EROSION CONTROL (SWPPP)1L.S.$35,310.00$35,310.00 $0.00 $0.00 
4SURVEY1L.S.$27,830.00$27,830.00 $0.00 $0.00 
5SEEDING - GRASS SEED MIX14Acres$2,150.00$30,100.00 $0.00 $0.00 
6BMP 5 - HANDLING OF WATER1L.S.$20,990.00$20,990.00 $0.00 $0.00 
7BMP 5 - DREDGE19000C.Y.$7.70$146,300.00 $0.00 $0.00 
8BMP 5 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL66C.Y.$7.50$495.00 $0.00 $0.00 
9BMP 5 - TRENCH EXCAVATION, STOCKPILE AND BACKFILL182C.Y.$34.50$6,279.00 $0.00 $0.00 
10BMP 5 - REMOVE AND DISPOSE EXISTING 72" CMP257L.F.$42.50$10,922.50 $0.00 $0.00 
11BMP 5 - NON-SHRINK GROUT FOR PIPE PLUGS7C.Y.$1,090.00$7,630.00 $0.00 $0.00 
12BMP 5 - CLASS "B" ROCK RIPRAP30Tons$105.00$3,150.00 $0.00 $0.00 
13BMP 5 - GRAVEL FOR ROAD REPLACEMENT7C.Y.$194.00$1,358.00 $0.00 $0.00 
14BMP 5 - SEEDING - GRASS SEED MIX0.2Acres$2,810.00$562.00 $0.00 $0.00 
15BMP 5 - EROSION CONTROL MATTING105S.Y.$3.90$409.50 $0.00 $0.00 
16BMP 15 - HANDLING OF WATER1L.S.$20,990.00$20,990.00 $0.00 $0.00 
17BMP 15 - REMOVE AND DISPOSE OF EXISTING RISER1Each$1,560.00$1,560.00 $0.00 $0.00 
18BMP 15 - REMOVAL OF EXISTING PIPE125L.F.$51.50$6,437.50 $0.00 $0.00 
19BMP 15 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL1826C.Y.$4.10$7,486.60 $0.00 $0.00 
20BMP 15 - OVEREXCAVATE AND HAUL TO SPOIL SITE3066C.Y.$8.90$27,287.40 $0.00 $0.00 
21BMP 15 - EARTH EMBANKMENT15832C.Y.$10.00$158,320.00 $0.00 $0.00 
22BMP 15 - 12" KNIFE GATE VALVE1Each$21,350.00$21,350.00 $0.00 $0.00 
23BMP 15 - 12" PVC DRAWDOWN PIPE18L.F.$364.00$6,552.00 $0.00 $0.00 
24BMP 15 - 30" HDPE PIPE96L.F.$532.00$51,072.00 $0.00 $0.00 
25BMP 15 - 36" CMP20L.F.$335.00$6,700.00 $0.00 $0.00 
26BMP 15 - CONCRETE COLLAR AND FOOTING1Each$7,810.00$7,810.00 $0.00 $0.00 
27BMP 15 - 12" PVC PIPE TRASH RACK1Each$1,960.00$1,960.00 $0.00 $0.00 
28BMP 15 - RISER FORMED CONCRETE16C.Y.$913.00$14,608.00 $0.00 $0.00 
29BMP 15 - RISER STEEL REINFORCEMENT2666LB.$13.00$34,658.00 $0.00 $0.00 
30BMP 15 - RISER METAL FABRICATION1L.S.$23,480.00$23,480.00 $0.00 $0.00 
31BMP 15 - RISER STEPS10Each$512.00$5,120.00 $0.00 $0.00 
32"BMP 15 - MJXFL DIP WITH WALL COLLAR AND MJ GLAND AND GASKET"1L.S.$3,080.00$3,080.00 $0.00 $0.00 
33BMP 15 - CLASS "B" ROCK RIPRAP88Tons$105.00$9,240.00 $0.00 $0.00 
34BMP 15 - CLASS "E" ROCK RIPRAP24Tons$107.00$2,568.00 $0.00 $0.00 
35BMP 15 - ROCK RUBBLE12Tons$345.00$4,140.00 $0.00 $0.00 
36BMP 15 - SEEPAGE FILTER SAND FOR DIAPHRAGM FILTER11C.Y.$535.00$5,885.00 $0.00 $0.00 
37BMP 15 - 8" SOLID WALL PVC DRAIN PIPE55L.F.$126.00$6,930.00 $0.00 $0.00 
38BMP 15 - 8" SLOTTED WALL PVC10L.F.$381.00$3,810.00 $0.00 $0.00 
39BMP 15 - REMOVE AND SALVAGE EXISTING CULVERT1Each$3,080.00$3,080.00 $0.00 $0.00 
40BMP 15 - PLACE SALVAGED CULVERT1Each$3,080.00$3,080.00 $0.00 $0.00 
41BMP 15 - CULVERT CROSSING CLASS "E" ROCK RIPRAP40Tons$77.00$3,080.00 $0.00 $0.00 
42BMP 15 - CULVERT CROSSING CLASS "B" ROCK RIPRAP6Tons$513.00$3,078.00 $0.00 $0.00 
43BMP 15 - CULVERT CROSSING EARTH EMBANKMENT412C.Y.$7.50$3,090.00 $0.00 $0.00 
44BMP 15 - TRAIL REALIGNMENT EMBANKMENT210C.Y.$26.00$5,460.00 $0.00 $0.00 
45BMP 15 - SEEDING - GRASS SEED MIX6Acres$2,550.00$15,300.00 $0.00 $0.00 
46BMP 15 - EROSION CONTROL MATTING5477S.Y.$2.90$15,883.30 $0.00 $0.00 
47CAMPGROUND IMPROVEMENTS - EARTH EMBANKMENT430C.Y.$7.20$3,096.00 $0.00 $0.00 
48CAMPGROUND IMPROVEMENTS - ELECTRIC BOX RAISE1Each$3,080.00$3,080.00 $0.00 $0.00 
49CAMPGROUND IMPROVEMENTS - WATER HYDRANT RAISE2Each$1,540.00$3,080.00 $0.00 $0.00 
50CAMPGROUND IMPROVEMENTS - TREE TRANSPLANT3Each$1,660.00$4,980.00 $0.00 $0.00 
51CAMPGROUND IMPROVEMENTS - EROSION CONTROL MATTING3829S.Y.$3.20$12,252.80 $0.00 $0.00 
52CAMPGROUND IMPROVEMENTS - SEEDING - GRASS SEED MIX1.2Acres$2,680.00$3,216.00 $0.00 $0.00 
53DREDGE133064C.Y.$7.30$971,367.20 $0.00 $0.00 
54SHORELINE - OPEN-CELLED GEOGRID EROSION PROTECTION465L.F.$26.25$12,206.25 $0.00 $0.00 
55"SHORELINE - SHALLOW EROSION PROTECTION WITH GRAVEL BED"759L.F.$26.25$19,923.75 $0.00 $0.00 
56SHORELINE - MEDIUM EROSION PROTECTION1359L.F.$26.00$35,334.00 $0.00 $0.00 
57SHORELINE - DEEP EROSION PROTECTION1347L.F.$26.25$35,358.75 $0.00 $0.00 
58JETTY - EMBANKMENT8504C.Y.$26.00$221,104.00 $0.00 $0.00 
59JETTY - DREDGE1124C.Y.$6.90$7,755.60 $0.00 $0.00 
60JETTY - CLASS "E" ROCK RIPRAP1677Tons$87.00$145,899.00 $0.00 $0.00 
61JETTY - GRASS SEED MIX0.2Acres$2,040.00$408.00 $0.00 $0.00 
62SPOILS SITE - EARTH EMBANKMENT7718C.Y.$26.50$204,527.00 $0.00 $0.00 
63SPOILS SITE - 15" SOLID WALL PVC & APPURTENANCES74L.F.$143.00$10,582.00 $0.00 $0.00 
64SPOILS SITE - 15" PERFORATED PVC RISER W/ SOCK1Each$8,460.00$8,460.00 $0.00 $0.00 
65SPOILS SITE - 12" SOLID WALL PVC & APPURTENANCES87L.F.$116.00$10,092.00 $0.00 $0.00 
66SPOILS SITE - 12" PERFORATED PVC RISER W/ SOCK1Each$8,890.00$8,890.00 $0.00 $0.00 
67SPOILS SITE - CLASS "E" ROCK RIPRAP4Tons$1,340.00$5,360.00 $0.00 $0.00 
68SPOILS SITE - SEEDING - COVER CROP14.4Acres$2,250.00$32,400.00 $0.00 $0.00 
69SPOILS SITE - REMOVAL OF ELECTRICAL BOX1Each$3,080.00$3,080.00 $0.00 $0.00 
70SPOILS SITE - ABANDON ELECTRICAL UTILITY LINE240L.F.$12.75$3,060.00 $0.00 $0.00 
71SPOILS SITE - GAS LINE PROTECTION1L.S.$3,080.00$3,080.00 $0.00 $0.00 
72FISH HABITAT - ROCK STAR11Each$10,680.00$117,480.00 $0.00 $0.00 
73FISH HABITAT - UNDERWATER SHOAL9Each$4,000.00$36,000.00 $0.00 $0.00 
74FISH HABITAT - TREE PILE25Each$5,620.00$140,500.00 $0.00 $0.00 
75FISH HABITAT - SHOT ROCK450Tons$74.50$33,525.00 $0.00 $0.00 
76FISH HABITAT - MISC. EXCAVATOR WORK54HR.$971.00$52,434.00 $0.00 $0.00 
77STREAM MITIGATION - CLASS "E" ROCK RIPRAP538Tons$87.50$47,075.00 $0.00 $0.00 
78STREAM MITIGATION - EXCAVATION298C.Y.$36.50$10,877.00 $0.00 $0.00 
79STREAM MITIGATION - SEEDING - FLOODPLAIN SEED MIX0.7Acres$8,480.00$5,936.00 $0.00 $0.00 
80STREAM MITIGATION - SEEDING - GRASS SEED MIX2.6Acres$3,220.00$8,372.00 $0.00 $0.00 
81STREAM MITIGATION - EROSION CONTROL MATTING1000S.Y.$5.50$5,500.00 $0.00 $0.00 
82STEP POOL - EXCAVATION225C.Y.$26.25$5,906.25 $0.00 $0.00 
83STEP POOL - FILTER FABRIC49S.Y.$82.50$4,042.50 $0.00 $0.00 
84STEP POOL - STEP POOL BOULDERS39Tons$745.00$29,055.00 $0.00 $0.00 
85STEP POOL - SCOUR POOL STONE MIX63.7Tons$579.00$36,882.30 $0.00 $0.00 
86STEP POOL - SEEDING - FLOODPLAIN SEED MIX0.1Acres$34,850.00$3,485.00 $0.00 $0.00 
87STEP POOL - EROSION CONTROL MATTING520S.Y.$8.30$4,316.00 $0.00 $0.00 
88STEP POOL - REMOVE 18" DIA CMP20L.F.$26.00$520.00 $0.00 $0.00 
89"PARKING LOT AND PLAYGROUND - STRIP, STOCKPILE AND REPLACE 9"" TOPSOIL"2458C.Y.$5.30$13,027.40 $0.00 $0.00 
90PARKING LOT AND PLAYGROUND - EMBANKMENT14116C.Y.$9.30$131,278.80 $0.00 $0.00 
91PARKING LOT AND PLAYGROUND - GRAVEL SURFACING571C.Y.$118.00$67,378.00 $0.00 $0.00 
92PARKING LOT AND PLAYGROUND - LIMESTONE CHIP SURFACING37C.Y.$410.00$15,170.00 $0.00 $0.00 
93PARKING LOT AND PLAYGROUND - PCC SURFACING82C.Y.$417.00$34,194.00 $0.00 $0.00 
94PARKING LOT AND PLAYGROUND - SEEDING - GRASS SEED MIX1.6Acres$3,960.00$6,336.00 $0.00 $0.00 
95PARKING LOT AND PLAYGROUND - EROSION CONTROL MATTING7550S.Y.$2.80$21,140.00 $0.00 $0.00 
96PARKING LOT AND PLAYGROUND - SIGNAGE AND MARKINGS1L.S.$3,080.00$3,080.00 $0.00 $0.00 
97PARKING LOT AND PLAYGROUND - WOOD POSTS17Each$181.00$3,077.00 $0.00 $0.00 
98"PARKING LOT AND PLAYGROUND - REMOVE AND REPLACE ELECTRIC LINE"1L.S.$3,080.00$3,080.00 $0.00 $0.00 
99"PARKING LOT AND PLAYGROUND - RELOCATE WATER LINE AND WATER HYDRANT"1L.S.$3,080.00$3,080.00 $0.00 $0.00 
100CLASS "E" ROCK RIPRAP214C.Y.$76.00$16,264.00 $0.00 $0.00 
Alternate        
101DREDGE17871C.Y.$17,811.00$318,300,381.00 $0.00 $0.00 
Alternate        
102SHORELINE - OPEN-CELLED GEOGRID EROSION PROTECTION260L.F.$61.50$15,990.00 $0.00 $0.00 
Alternate        
103"SHORELINE - SHALLOW EROSION PROTECTION WITH GRAVEL BED"299L.F.$61.50$18,388.50 $0.00 $0.00 
Alternate        
104SHORELINE - MEDIUM EROSION PROTECTION481L.F.$70.00$33,670.00 $0.00 $0.00 
      $322,067,894.90  $0.00  $0.00 
 



 

9/27/2024