IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Lake Macbride State Park | Date: 7/22/2021 | Project No. |
PCC Road Reconstruction | County: | JOHNSON | Time: 11:00 a.m. | 21-06-52-01 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $650,000.00 | Contractor: | All American Concrete, Inc. | Streb Construction Co. Inc. | BWC Excavating, LC | |||||||||
Funding Source: 100% Park & Institutional Road Fund, | 1489 Hwy 6 | 3191 Charbon Rose | 1303 Hickory Hollow Rd | ||||||||||
West Liberty IA 52776 | Iowa City IA 52246 | Solon IA 52333 | |||||||||||
Plan Sets Requested: 9 | Quantities | 3196272226 | 3193383498 | 3198487513 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | CLEARING AND GRUBBING - TREES | 4 | Each | $580.00 | $2,320.00 | $550.00 | $2,200.00 | $750.00 | $3,000.00 | ||||
2 | CLEARING AND GRUBBING - STUMPS | 10 | Each | $430.00 | $4,300.00 | $405.00 | $4,050.00 | $250.00 | $2,500.00 | ||||
3 | EXCAVATION, CLASS 10, ROADWAY AND BORROW | 2514 | C.Y. | $8.00 | $20,112.00 | $7.75 | $19,483.50 | $17.75 | $44,623.50 | ||||
4 | SPECIAL COMPACTION OF SUBGRADE | 22.73 | STA. | $500.00 | $11,365.00 | $450.00 | $10,228.50 | $116.00 | $2,636.68 | ||||
5 | MODIFIED SUBBASE | 2160 | Tons | $17.75 | $38,340.00 | $16.75 | $36,180.00 | $20.50 | $44,280.00 | ||||
6 | STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3, 7 IN. | 5694 | S.Y. | $33.50 | $190,749.00 | $37.50 | $213,525.00 | $42.00 | $239,148.00 | ||||
7 | SURFACING, DRIVEWAY, CLASS A CRUSHED STONE | 152 | Tons | $21.00 | $3,192.00 | $19.75 | $3,002.00 | $23.75 | $3,610.00 | ||||
8 | APRONS, CONCRETE, 18 IN. DIA. | 7 | Each | $1,500.00 | $10,500.00 | $1,450.00 | $10,150.00 | $1,975.00 | $13,825.00 | ||||
9 | INTAKE, SW-512, 30 IN. | 3 | Each | $4,200.00 | $12,600.00 | $3,950.00 | $11,850.00 | $2,350.00 | $7,050.00 | ||||
10 | SUBDRAIN, PVC, STANDARD, PERFORATED, 6 IN. | 2250 | L.F. | $13.00 | $29,250.00 | $12.50 | $28,125.00 | $10.00 | $22,500.00 | ||||
11 | SUBDRAIN RISER, 6 IN., AS PER PLAN | 3 | Each | $700.00 | $2,100.00 | $650.00 | $1,950.00 | $800.00 | $2,400.00 | ||||
12 | SUBDRAIN OUTLET, DR-305 | 3 | Each | $230.00 | $690.00 | $220.00 | $660.00 | $500.00 | $1,500.00 | ||||
13 | SUBDRAIN OUTLET, DR-306 | 3 | Each | $530.00 | $1,590.00 | $500.00 | $1,500.00 | $500.00 | $1,500.00 | ||||
14 | REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. | 184 | L.F. | $16.00 | $2,944.00 | $14.75 | $2,714.00 | $8.00 | $1,472.00 | ||||
15 | STORM SEWER GRAVITY MAIN, TRENCHED, REINFORCED CONCRETE PIPE (RCP), 3000D (CLASS IV), 18 IN. | 309 | L.F. | $110.00 | $33,990.00 | $105.00 | $32,445.00 | $85.00 | $26,265.00 | ||||
16 | REVETMENT, CLASS E | 448 | Tons | $55.00 | $24,640.00 | $51.75 | $23,184.00 | $47.75 | $21,392.00 | ||||
17 | EROSION STONE | 168 | Tons | $45.00 | $7,560.00 | $42.00 | $7,056.00 | $65.00 | $10,920.00 | ||||
18 | REMOVAL OF PAVEMENT | 4295 | S.Y. | $5.00 | $21,475.00 | $4.75 | $20,401.25 | $3.25 | $13,958.75 | ||||
19 | CURB AND GUTTER, P.C. CONCRETE, 2.5 FT. | 300 | L.F. | $28.50 | $8,550.00 | $29.00 | $8,700.00 | $30.00 | $9,000.00 | ||||
20 | WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN. X 4 IN. | 9 | Each | $525.00 | $4,725.00 | $185.00 | $1,665.00 | $115.00 | $1,035.00 | ||||
21 | TYPE A SIGNS, SHEET ALUMINUM | 18.25 | S.F. | $30.00 | $547.50 | $75.00 | $1,368.75 | $60.00 | $1,095.00 | ||||
22 | CONSTRUCTION SURVEY | 1 | L.S. | $10,000.00 | $10,000.00 | $10,000.00 | $10,000.00 | $11,500.00 | $11,500.00 | ||||
23 | PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT-BASED | 4.6 | STA. | $600.00 | $2,760.00 | $640.00 | $2,944.00 | $220.00 | $1,012.00 | ||||
24 | PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASED | 10 | Each | $100.00 | $1,000.00 | $100.00 | $1,000.00 | $110.00 | $1,100.00 | ||||
25 | TRAFFIC CONTROL | 1 | L.S. | $1,600.00 | $1,600.00 | $4,000.00 | $4,000.00 | $1,500.00 | $1,500.00 | ||||
26 | MOBILIZATION | 1 | L.S. | $50,000.00 | $50,000.00 | $50,000.00 | $50,000.00 | $21,000.00 | $21,000.00 | ||||
27 | SEEDING, FERTILIZING AND MULCHING (RURAL) | 0.8 | Acres | $2,000.00 | $1,600.00 | $3,000.00 | $2,400.00 | $2,075.00 | $1,660.00 | ||||
28 | STABILIZING CROP - SEEDING AND FERTILIZING | 0.8 | Acres | $1,000.00 | $800.00 | $1,500.00 | $1,200.00 | $975.00 | $780.00 | ||||
29 | SILT FENCE | 2085 | L.F. | $1.60 | $3,336.00 | $2.00 | $4,170.00 | $2.00 | $4,170.00 | ||||
30 | PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 9 IN. DIA. | 100 | L.F. | $1.60 | $160.00 | $4.00 | $400.00 | $2.00 | $200.00 | ||||
31 | SWPPP | 1 | L.S. | $3,700.00 | $3,700.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | ||||
$506,495.50 | $520,552.00 | $520,632.93 | |||||||||||
4 | 5 | 6 | |||||||||||
Estimated Cost: $650,000.00 | Contractor: | Midwest Concrete Inc. | Boomerang Corp | Eastern Iowa Excavating & Concrete, LLC | |||||||||
Funding Source: 100% Park & Institutional Road Fund, | 9835 Cottingham Rd | 13225 Circle Dr, Ste A PO Box 227 | 121 Nixon St SE PO Box 189 | ||||||||||
Peosta IA 52068 | Anamosa IA 52205 | Cascade IA 52033 | |||||||||||
Plan Sets Requested: 9 | Quantities | 5638450947 | 3194624435 | 5638525120 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | CLEARING AND GRUBBING - TREES | 4 | Each | $500.00 | $2,000.00 | $1,000.00 | $4,000.00 | $765.00 | $3,060.00 | ||||
2 | CLEARING AND GRUBBING - STUMPS | 10 | Each | $500.00 | $5,000.00 | $350.00 | $3,500.00 | $275.00 | $2,750.00 | ||||
3 | EXCAVATION, CLASS 10, ROADWAY AND BORROW | 2514 | C.Y. | $25.00 | $62,850.00 | $39.00 | $98,046.00 | $20.75 | $52,165.50 | ||||
4 | SPECIAL COMPACTION OF SUBGRADE | 22.73 | STA. | $450.00 | $10,228.50 | $300.00 | $6,819.00 | $140.00 | $3,182.20 | ||||
5 | MODIFIED SUBBASE | 2160 | Tons | $15.75 | $34,020.00 | $32.00 | $69,120.00 | $20.00 | $43,200.00 | ||||
6 | STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3, 7 IN. | 5694 | S.Y. | $37.00 | $210,678.00 | $33.00 | $187,902.00 | $34.50 | $196,443.00 | ||||
7 | SURFACING, DRIVEWAY, CLASS A CRUSHED STONE | 152 | Tons | $17.50 | $2,660.00 | $25.00 | $3,800.00 | $22.75 | $3,458.00 | ||||
8 | APRONS, CONCRETE, 18 IN. DIA. | 7 | Each | $1,850.00 | $12,950.00 | $2,000.00 | $14,000.00 | $1,825.00 | $12,775.00 | ||||
9 | INTAKE, SW-512, 30 IN. | 3 | Each | $2,750.00 | $8,250.00 | $3,000.00 | $9,000.00 | $2,275.00 | $6,825.00 | ||||
10 | SUBDRAIN, PVC, STANDARD, PERFORATED, 6 IN. | 2250 | L.F. | $11.50 | $25,875.00 | $17.00 | $38,250.00 | $16.65 | $37,462.50 | ||||
11 | SUBDRAIN RISER, 6 IN., AS PER PLAN | 3 | Each | $1,250.00 | $3,750.00 | $500.00 | $1,500.00 | $525.00 | $1,575.00 | ||||
12 | SUBDRAIN OUTLET, DR-305 | 3 | Each | $1,250.00 | $3,750.00 | $550.00 | $1,650.00 | $500.00 | $1,500.00 | ||||
13 | SUBDRAIN OUTLET, DR-306 | 3 | Each | $1,550.00 | $4,650.00 | $300.00 | $900.00 | $500.00 | $1,500.00 | ||||
14 | REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. | 184 | L.F. | $20.00 | $3,680.00 | $12.00 | $2,208.00 | $16.50 | $3,036.00 | ||||
15 | STORM SEWER GRAVITY MAIN, TRENCHED, REINFORCED CONCRETE PIPE (RCP), 3000D (CLASS IV), 18 IN. | 309 | L.F. | $100.00 | $30,900.00 | $75.00 | $23,175.00 | $115.75 | $35,766.75 | ||||
16 | REVETMENT, CLASS E | 448 | Tons | $36.00 | $16,128.00 | $56.00 | $25,088.00 | $50.25 | $22,512.00 | ||||
17 | EROSION STONE | 168 | Tons | $30.00 | $5,040.00 | $47.00 | $7,896.00 | $50.25 | $8,442.00 | ||||
18 | REMOVAL OF PAVEMENT | 4295 | S.Y. | $10.00 | $42,950.00 | $4.00 | $17,180.00 | $6.55 | $28,132.25 | ||||
19 | CURB AND GUTTER, P.C. CONCRETE, 2.5 FT. | 300 | L.F. | $25.00 | $7,500.00 | $32.00 | $9,600.00 | $26.50 | $7,950.00 | ||||
20 | WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN. X 4 IN. | 9 | Each | $515.00 | $4,635.00 | $500.00 | $4,500.00 | $48.00 | $432.00 | ||||
21 | TYPE A SIGNS, SHEET ALUMINUM | 18.25 | S.F. | $26.00 | $474.50 | $25.00 | $456.25 | $53.00 | $967.25 | ||||
22 | CONSTRUCTION SURVEY | 1 | L.S. | $10,300.00 | $10,300.00 | $7,000.00 | $7,000.00 | $7,500.00 | $7,500.00 | ||||
23 | PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT-BASED | 4.6 | STA. | $567.00 | $2,608.20 | $250.00 | $1,150.00 | $210.00 | $966.00 | ||||
24 | PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASED | 10 | Each | $103.00 | $1,030.00 | $130.00 | $1,300.00 | $110.00 | $1,100.00 | ||||
25 | TRAFFIC CONTROL | 1 | L.S. | $1,545.00 | $1,545.00 | $1,500.00 | $1,500.00 | $11,000.00 | $11,000.00 | ||||
26 | MOBILIZATION | 1 | L.S. | $25,000.00 | $25,000.00 | $4,000.00 | $4,000.00 | $35,000.00 | $35,000.00 | ||||
27 | SEEDING, FERTILIZING AND MULCHING (RURAL) | 0.8 | Acres | $1,932.00 | $1,545.60 | $5,000.00 | $4,000.00 | $17,000.00 | $13,600.00 | ||||
28 | STABILIZING CROP - SEEDING AND FERTILIZING | 0.8 | Acres | $902.00 | $721.60 | $4,000.00 | $3,200.00 | $7,100.00 | $5,680.00 | ||||
29 | SILT FENCE | 2085 | L.F. | $1.75 | $3,648.75 | $2.50 | $5,212.50 | $3.50 | $7,297.50 | ||||
30 | PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 9 IN. DIA. | 100 | L.F. | $1.75 | $175.00 | $2.50 | $250.00 | $6.25 | $625.00 | ||||
31 | SWPPP | 1 | L.S. | $3,605.00 | $3,605.00 | $1,000.00 | $1,000.00 | $1,500.00 | $1,500.00 | ||||
$548,148.15 | $557,202.75 | $557,402.95 | |||||||||||
7 | 8 | 9 | |||||||||||
Estimated Cost: $650,000.00 | Contractor: | Pirc-Tobin Construction, Inc. | |||||||||||
Funding Source: 100% Park & Institutional Road Fund, | 2650 Old Quaas Rd PO Box 160 | ||||||||||||
Alburnett IA 52202 | |||||||||||||
Plan Sets Requested: 9 | Quantities | 3198422130 | |||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | CLEARING AND GRUBBING - TREES | 4 | Each | $3,000.00 | $12,000.00 | $0.00 | $0.00 | ||||||
2 | CLEARING AND GRUBBING - STUMPS | 10 | Each | $850.00 | $8,500.00 | $0.00 | $0.00 | ||||||
3 | EXCAVATION, CLASS 10, ROADWAY AND BORROW | 2514 | C.Y. | $20.00 | $50,280.00 | $0.00 | $0.00 | ||||||
4 | SPECIAL COMPACTION OF SUBGRADE | 22.73 | STA. | $400.00 | $9,092.00 | $0.00 | $0.00 | ||||||
5 | MODIFIED SUBBASE | 2160 | Tons | $22.50 | $48,600.00 | $0.00 | $0.00 | ||||||
6 | STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3, 7 IN. | 5694 | S.Y. | $36.50 | $207,831.00 | $0.00 | $0.00 | ||||||
7 | SURFACING, DRIVEWAY, CLASS A CRUSHED STONE | 152 | Tons | $32.50 | $4,940.00 | $0.00 | $0.00 | ||||||
8 | APRONS, CONCRETE, 18 IN. DIA. | 7 | Each | $2,000.00 | $14,000.00 | $0.00 | $0.00 | ||||||
9 | INTAKE, SW-512, 30 IN. | 3 | Each | $3,000.00 | $9,000.00 | $0.00 | $0.00 | ||||||
10 | SUBDRAIN, PVC, STANDARD, PERFORATED, 6 IN. | 2250 | L.F. | $16.50 | $37,125.00 | $0.00 | $0.00 | ||||||
11 | SUBDRAIN RISER, 6 IN., AS PER PLAN | 3 | Each | $1,000.00 | $3,000.00 | $0.00 | $0.00 | ||||||
12 | SUBDRAIN OUTLET, DR-305 | 3 | Each | $425.00 | $1,275.00 | $0.00 | $0.00 | ||||||
13 | SUBDRAIN OUTLET, DR-306 | 3 | Each | $1,000.00 | $3,000.00 | $0.00 | $0.00 | ||||||
14 | REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. | 184 | L.F. | $25.00 | $4,600.00 | $0.00 | $0.00 | ||||||
15 | STORM SEWER GRAVITY MAIN, TRENCHED, REINFORCED CONCRETE PIPE (RCP), 3000D (CLASS IV), 18 IN. | 309 | L.F. | $100.00 | $30,900.00 | $0.00 | $0.00 | ||||||
16 | REVETMENT, CLASS E | 448 | Tons | $65.00 | $29,120.00 | $0.00 | $0.00 | ||||||
17 | EROSION STONE | 168 | Tons | $80.00 | $13,440.00 | $0.00 | $0.00 | ||||||
18 | REMOVAL OF PAVEMENT | 4295 | S.Y. | $5.00 | $21,475.00 | $0.00 | $0.00 | ||||||
19 | CURB AND GUTTER, P.C. CONCRETE, 2.5 FT. | 300 | L.F. | $30.00 | $9,000.00 | $0.00 | $0.00 | ||||||
20 | WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN. X 4 IN. | 9 | Each | $550.00 | $4,950.00 | $0.00 | $0.00 | ||||||
21 | TYPE A SIGNS, SHEET ALUMINUM | 18.25 | S.F. | $26.50 | $483.625 | $0.00 | $0.00 | ||||||
22 | CONSTRUCTION SURVEY | 1 | L.S. | $7,500.00 | $7,500.00 | $0.00 | $0.00 | ||||||
23 | PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT-BASED | 4.6 | STA. | $220.00 | $1,012.00 | $0.00 | $0.00 | ||||||
24 | PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASED | 10 | Each | $110.00 | $1,100.00 | $0.00 | $0.00 | ||||||
25 | TRAFFIC CONTROL | 1 | L.S. | $5,000.00 | $5,000.00 | $0.00 | $0.00 | ||||||
26 | MOBILIZATION | 1 | L.S. | $65,000.00 | $65,000.00 | $0.00 | $0.00 | ||||||
27 | SEEDING, FERTILIZING AND MULCHING (RURAL) | 0.8 | Acres | $3,500.00 | $2,800.00 | $0.00 | $0.00 | ||||||
28 | STABILIZING CROP - SEEDING AND FERTILIZING | 0.8 | Acres | $1,500.00 | $1,200.00 | $0.00 | $0.00 | ||||||
29 | SILT FENCE | 2085 | L.F. | $2.25 | $4,691.25 | $0.00 | $0.00 | ||||||
30 | PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 9 IN. DIA. | 100 | L.F. | $5.00 | $500.00 | $0.00 | $0.00 | ||||||
31 | SWPPP | 1 | L.S. | $3,000.00 | $3,000.00 | $0.00 | $0.00 | ||||||
$614,414.875 | $0.00 | $0.00 | |||||||||||
3/28/2024