IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Spring Run Wildlife Management Area (WMA)  Date: 2/10/2022  Project No.  
  McDowell Wetland Restoration  County:   DICKINSON  Time: 3:00 p.m.  21-01-30-03

 

 
1
2
3
Estimated Cost: $54,000.00
Contractor: 
Mitchell & Huss ExcavationL. Thies LLC dba Empire ExcavationHealy Excavating
Funding Source: 100% Federal-NAWCA, 200 Lacour St
219 Lawndale St
3483 Perkins Ave
George IA  51237Odebolt IA  51458Lake View IA  51450
Plan Sets Requested: 0
Quantities
712475671171266081377128309179
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$3,500.00$3,500.00 $3,000.00$3,000.00 $2,000.00$2,000.00 
2Tile Investigation1350L.F.$2.00$2,700.00 $1.00$1,350.00 $1.50$2,025.00 
3Tile Break3Each$250.00$750.00 $100.00$300.00 $150.00$450.00 
4Earthwork (Dike Fill)7276C.Y.$3.00$21,828.00 $3.25$23,647.00 $3.25$23,647.00 
5Excavation (Dike Spillway)138C.Y.$3.00$414.00 $3.00$414.00 $3.50$483.00 
66" Dia. Dual Wall HDPE (Non Perf)145L.F.$8.26$1,197.70 $15.00$2,175.00 $17.00$2,465.00 
710" Dia. Dual Wall HDPE (Non Perf)65L.F.$12.67$823.55 $25.00$1,625.00 $22.50$1,462.50 
86" Dia. Dual Wall HDPE Riser (Non Perf)8L.F.$25.00$200.00 $20.00$160.00 $20.00$160.00 
98" Dia. Dual Wall HDPE Riser (Non Perf)9L.F.$31.00$279.00 $20.00$180.00 $22.00$198.00 
10HDPE Tee Connections4Each$75.00$300.00 $50.00$200.00 $25.00$100.00 
115" Perf Tile (Install Only)570L.F.$4.00$2,280.00 $2.00$1,140.00 $4.00$2,280.00 
128" Perf Tile (Install Only)90L.F.$4.00$360.00 $2.00$180.00 $4.00$360.00 
136" Dia. Heavy Duty Bar Guard2Each$60.00$120.00 $80.00$160.00 $55.00$110.00 
148" Dia. Heavy Duty Bar Guard2Each$75.00$150.00 $100.00$200.00 $62.00$124.00 
1510" Dia. Heavy Duty Bar Guard1Each$85.00$85.00 $125.00$125.00 $78.00$78.00 
16Agri-drain Inline Water Control Structure 10" Dia. x 6' Tall1Each$1,500.00$1,500.00 $2,100.00$2,100.00 $1,900.00$1,900.00 
172'x2' Antiseep Collar3Each$150.00$450.00 $300.00$900.00 $150.00$450.00 
18Water Control Structure Fire Proof Cover1Each$1,600.00$1,600.00 $1,600.00$1,600.00 $1,900.00$1,900.00 
19Pipe Anchor1Each$150.00$150.00 $300.00$300.00 $500.00$500.00 
20Concrete Collar3Each$400.00$1,200.00 $250.00$750.00 $150.00$450.00 
21Erosion Stone10Tons$45.00$450.00 $55.00$550.00 $55.00$550.00 
22Silt Fence800L.F.$3.00$2,400.00 $3.00$2,400.00 $2.75$2,200.00 
      $42,737.25  $43,456.00  $43,892.50 
 
4
5
6
Estimated Cost: $54,000.00
Contractor: 
M&S DirtworkValley Contracting IncBLAC Construction LLC
Funding Source: 100% Federal-NAWCA, 10742 Ivy Ave
1850 Hwy 4
1281 Miller Rd
Breda IA  51436Estherville IA  51334Sherburn MN  56171
Plan Sets Requested: 0
Quantities
712790232471236249695072360128
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$5,000.00$5,000.00 $1,200.00$1,200.00 $600.00$600.00 
2Tile Investigation1350L.F.$2.00$2,700.00 $2.40$3,240.00 $2.00$2,700.00 
3Tile Break3Each$250.00$750.00 $200.00$600.00 $225.00$675.00 
4Earthwork (Dike Fill)7276C.Y.$3.00$21,828.00 $3.00$21,828.00 $3.49$25,393.24 
5Excavation (Dike Spillway)138C.Y.$3.00$414.00 $5.00$690.00 $5.00$690.00 
66" Dia. Dual Wall HDPE (Non Perf)145L.F.$7.00$1,015.00 $16.00$2,320.00 $18.23$2,643.35 
710" Dia. Dual Wall HDPE (Non Perf)65L.F.$12.00$780.00 $29.00$1,885.00 $28.92$1,879.80 
86" Dia. Dual Wall HDPE Riser (Non Perf)8L.F.$17.00$136.00 $14.00$112.00 $114.10$912.80 
98" Dia. Dual Wall HDPE Riser (Non Perf)9L.F.$20.00$180.00 $20.00$180.00 $133.89$1,205.01 
10HDPE Tee Connections4Each$40.00$160.00 $100.00$400.00 $97.50$390.00 
115" Perf Tile (Install Only)570L.F.$4.50$2,565.00 $7.00$3,990.00 $7.94$4,525.80 
128" Perf Tile (Install Only)90L.F.$6.00$540.00 $10.00$900.00 $11.02$991.80 
136" Dia. Heavy Duty Bar Guard2Each$75.00$150.00 $60.00$120.00 $55.00$110.00 
148" Dia. Heavy Duty Bar Guard2Each$75.00$150.00 $75.00$150.00 $75.00$150.00 
1510" Dia. Heavy Duty Bar Guard1Each$100.00$100.00 $85.00$85.00 $100.00$100.00 
16Agri-drain Inline Water Control Structure 10" Dia. x 6' Tall1Each$2,000.00$2,000.00 $1,800.00$1,800.00 $1,460.00$1,460.00 
172'x2' Antiseep Collar3Each$300.00$900.00 $150.00$450.00 $75.00$225.00 
18Water Control Structure Fire Proof Cover1Each$1,500.00$1,500.00 $2,457.00$2,457.00 $1,565.00$1,565.00 
19Pipe Anchor1Each$200.00$200.00 $250.00$250.00 $295.00$295.00 
20Concrete Collar3Each$100.00$300.00 $250.00$750.00 $150.00$450.00 
21Erosion Stone10Tons$100.00$1,000.00 $36.00$360.00 $98.00$980.00 
22Silt Fence800L.F.$3.00$2,400.00 $4.00$3,200.00 $2.50$2,000.00 
      $44,768.00  $46,967.00  $49,941.80 
 
7
8
9
Estimated Cost: $54,000.00
Contractor: 
Diamond Concrete and Construction, IncMega Inc.MLS Landscape & Design, Inc.
Funding Source: 100% Federal-NAWCA, 2360 15th St
1521 Taft Ave
722 Broad St
Spirit Lake IA  51360Ocheyedan IA  51354Granville IA  51022
Plan Sets Requested: 0
Quantities
712336906271246113497127273800
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$2,500.00$2,500.00 $2,500.00$2,500.00 $8,000.00$8,000.00 
2Tile Investigation1350L.F.$2.30$3,105.00 $1.40$1,890.00 $1.00$1,350.00 
3Tile Break3Each$245.00$735.00 $125.00$375.00 $400.00$1,200.00 
4Earthwork (Dike Fill)7276C.Y.$3.50$25,466.00 $5.75$41,837.00 $3.00$21,828.00 
5Excavation (Dike Spillway)138C.Y.$5.75$793.50 $1.75$241.50 $3.00$414.00 
66" Dia. Dual Wall HDPE (Non Perf)145L.F.$24.04$3,485.80 $6.22$901.90 $15.00$2,175.00 
710" Dia. Dual Wall HDPE (Non Perf)65L.F.$39.79$2,586.35 $14.12$917.80 $33.00$2,145.00 
86" Dia. Dual Wall HDPE Riser (Non Perf)8L.F.$27.54$220.32 $6.22$49.76 $200.00$1,600.00 
98" Dia. Dual Wall HDPE Riser (Non Perf)9L.F.$25.22$226.98 $10.20$91.80 $225.00$2,025.00 
10HDPE Tee Connections4Each$69.50$278.00 $143.00$572.00 $500.00$2,000.00 
115" Perf Tile (Install Only)570L.F.$6.48$3,693.60 $1.05$598.50 $7.50$4,275.00 
128" Perf Tile (Install Only)90L.F.$6.48$583.20 $2.10$189.00 $10.00$900.00 
136" Dia. Heavy Duty Bar Guard2Each$138.00$276.00 $45.00$90.00 $250.00$500.00 
148" Dia. Heavy Duty Bar Guard2Each$148.00$296.00 $56.00$112.00 $300.00$600.00 
1510" Dia. Heavy Duty Bar Guard1Each$158.00$158.00 $70.00$70.00 $750.00$750.00 
16Agri-drain Inline Water Control Structure 10" Dia. x 6' Tall1Each$1,335.00$1,335.00 $1,500.00$1,500.00 $3,000.00$3,000.00 
172'x2' Antiseep Collar3Each$463.00$1,389.00 $100.00$300.00 $500.00$1,500.00 
18Water Control Structure Fire Proof Cover1Each$2,222.00$2,222.00 $2,000.00$2,000.00 $3,000.00$3,000.00 
19Pipe Anchor1Each$150.00$150.00 $150.00$150.00 $250.00$250.00 
20Concrete Collar3Each$150.00$450.00 $116.00$348.00 $400.00$1,200.00 
21Erosion Stone10Tons$85.92$859.20 $15.74$157.40 $100.00$1,000.00 
22Silt Fence800L.F.$4.75$3,800.00 $3.00$2,400.00 $3.00$2,400.00 
      $54,608.95  $57,291.66  $62,112.00 
 
10
11
12
Estimated Cost: $54,000.00
Contractor: 
Abel Drainage & Excavating, Inc.
Funding Source: 100% Federal-NAWCA, 2380 440th St


Greenville IA  51343    
Plan Sets Requested: 0
Quantities
7122629008
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$3,000.00$3,000.00 $0.00 $0.00 
2Tile Investigation1350L.F.$3.00$4,050.00 $0.00 $0.00 
3Tile Break3Each$400.00$1,200.00 $0.00 $0.00 
4Earthwork (Dike Fill)7276C.Y.$4.50$32,742.00 $0.00 $0.00 
5Excavation (Dike Spillway)138C.Y.$6.50$897.00 $0.00 $0.00 
66" Dia. Dual Wall HDPE (Non Perf)145L.F.$10.70$1,551.50 $0.00 $0.00 
710" Dia. Dual Wall HDPE (Non Perf)65L.F.$32.31$2,100.15 $0.00 $0.00 
86" Dia. Dual Wall HDPE Riser (Non Perf)8L.F.$35.00$280.00 $0.00 $0.00 
98" Dia. Dual Wall HDPE Riser (Non Perf)9L.F.$35.00$315.00 $0.00 $0.00 
10HDPE Tee Connections4Each$150.00$600.00 $0.00 $0.00 
115" Perf Tile (Install Only)570L.F.$7.50$4,275.00 $0.00 $0.00 
128" Perf Tile (Install Only)90L.F.$10.00$900.00 $0.00 $0.00 
136" Dia. Heavy Duty Bar Guard2Each$100.00$200.00 $0.00 $0.00 
148" Dia. Heavy Duty Bar Guard2Each$120.00$240.00 $0.00 $0.00 
1510" Dia. Heavy Duty Bar Guard1Each$130.00$130.00 $0.00 $0.00 
16Agri-drain Inline Water Control Structure 10" Dia. x 6' Tall1Each$3,000.00$3,000.00 $0.00 $0.00 
172'x2' Antiseep Collar3Each$350.00$1,050.00 $0.00 $0.00 
18Water Control Structure Fire Proof Cover1Each$2,500.00$2,500.00 $0.00 $0.00 
19Pipe Anchor1Each$200.00$200.00 $0.00 $0.00 
20Concrete Collar3Each$500.00$1,500.00 $0.00 $0.00 
21Erosion Stone10Tons$65.00$650.00 $0.00 $0.00 
22Silt Fence800L.F.$4.00$3,200.00 $0.00 $0.00 
      $64,580.65  $0.00  $0.00 
 



 

7/27/2024