Bids For: | Location: | West Lake Okoboji | Date: 7/18/2019 | Project No. |
Seawall Repair | County: | DICKINSON | Time: 11:00 a.m. | 19-01-30-05 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $410,000.00 | Contractor: | Graves Construction Co., Inc. | Steffes Companies | Dixon Construction Co. | |||||||||
Funding Source: 100% Marine Fuel Tax, | 1810 340th St | 907 Okoboji Ave | 409 Driftwood St | ||||||||||
Spencer IA 51301 | Milford IA 51351 | Correctionville IA 51016 | |||||||||||
Plan Sets Requested: 9 | Quantities | 7122622403 | 7123386400 | 7123724224 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Excavation, Class 13, Waste | 507 | C.Y. | $24.00 | $12,168.00 | $33.24 | $16,852.68 | $25.00 | $12,675.00 | ||||
2 | Granular Backfill | 51.7 | Tons | $40.00 | $2,068.00 | $19.62 | $1,014.354 | $50.00 | $2,585.00 | ||||
3 | Structural Concrete (Miscellaneous) | 18.63 | C.Y. | $935.00 | $17,419.05 | $265.97 | $4,955.021 | $750.00 | $13,972.50 | ||||
4 | Reinforcing Steel, Epoxy Coated | 2994 | LB. | $1.80 | $5,389.20 | $1.64 | $4,910.16 | $1.75 | $5,239.50 | ||||
5 | Apron, Low Clearance Concrete, Equivalent Diameter 36 In. | 1 | Each | $1,206.00 | $1,206.00 | $1,280.90 | $1,280.90 | $2,500.00 | $2,500.00 | ||||
6 | Manhole, Storm Sewer, SW-401, 60 In. | 1 | Each | $5,600.00 | $5,600.00 | $3,959.15 | $3,959.15 | $5,000.00 | $5,000.00 | ||||
7 | Manhole, Storm Sewer, SW-402 | 1 | Each | $8,000.00 | $8,000.00 | $3,609.81 | $3,609.81 | $7,000.00 | $7,000.00 | ||||
8 | Storm Sewer Gravity Main, Trenched, High Density Polyethylene Pipe (HDPE), 24 In. | 251 | L.F. | $65.00 | $16,315.00 | $52.40 | $13,152.40 | $87.00 | $21,837.00 | ||||
9 | Storm Sewer Gravity Main, Trenched, 2000D Low Clearance Concrete Pipe, Equivalent Diameter 36 In. | 2.5 | L.F. | $782.00 | $1,955.00 | $262.00 | $655.00 | $525.00 | $1,312.50 | ||||
10 | Remove Storm Sewer Pipe Less Than or Equal to 36 In. | 45 | L.F. | $45.00 | $2,025.00 | $34.93 | $1,571.85 | $35.00 | $1,575.00 | ||||
11 | Engineering Fabric | 1351 | S.Y. | $5.00 | $6,755.00 | $2.94 | $3,971.94 | $7.00 | $9,457.00 | ||||
12 | Removal of Sidewalk | 637 | S.Y. | $13.00 | $8,281.00 | $23.18 | $14,765.66 | $21.00 | $13,377.00 | ||||
13 | Sidewalk, Reinforced P.C. Concrete, 6 In. | 637 | S.Y. | $33.00 | $21,021.00 | $75.98 | $48,399.26 | $100.00 | $63,700.00 | ||||
14 | Construction Survey | 1 | L.S. | $4,000.00 | $4,000.00 | $3,705.09 | $3,705.09 | $5,000.00 | $5,000.00 | ||||
15 | Mobilization | 1 | L.S. | $68,000.00 | $68,000.00 | $32,658.76 | $32,658.76 | $87,000.00 | $87,000.00 | ||||
16 | ('Cubic Yards' Item) Permeable Low Density Cellular Concrete | 492 | C.Y. | $265.00 | $130,380.00 | $153.50 | $75,522.00 | $250.00 | $123,000.00 | ||||
17 | ('Pounds' Item) Steel Sheet Piling | 72879.4 | LB. | $2.05 | $149,402.77 | $3.53 | $257,264.282 | $2.50 | $182,198.50 | ||||
$459,985.02 | $488,248.317 | $557,429.00 | |||||||||||
Steffes Companies, Milford, IA