IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Central Park Lake  Date: 7/20/2017  Project No.  
  Boat Ramp, Fishing Access, and Beach Construction -Supplemental Contract  County:   JONES  Time: 11:00 AM  16-06-53-03

 

 
1
2
3
Estimated Cost: $1,000,000.00
Contractor: 
Triple B Construction
Funding Source: 75% Lake Restoration, 25% Other, 2272 Spicer Ave


Wilton IA  52778    
Plan Sets Requested: 0
Quantities
563-299-2399
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
11" Curb Stop0Each$0.00$0.00 $0.00 $0.00 
218" Dual Wall HDPE0L.F.$0.00$0.00 $0.00 $0.00 
342" RCP0L.F.$0.00$0.00 $0.00 $0.00 
442" RCP Apron0Each$0.00$0.00 $0.00 $0.00 
536" CMP0L.F.$0.00$0.00 $0.00 $0.00 
636" CMP Apron0Each$0.00$0.00 $0.00 $0.00 
75" PCC0S.Y.$0.00$0.00 $0.00 $0.00 
86' Tree0Each$0.00$0.00 $0.00 $0.00 
96" PCC0S.Y.$0.00$0.00 $0.00 $0.00 
106" PCC Curb0L.F.$0.00$0.00 $0.00 $0.00 
116" Perf. Tile0L.F.$0.00$0.00 $0.00 $0.00 
12Beach Sand0Tons$0.00$0.00 $0.00 $0.00 
13Bench, Backless0Each$0.00$0.00 $0.00 $0.00 
14Bench, Standard0Each$0.00$0.00 $0.00 $0.00 
15Bioswale0L.S.$0.00$0.00 $0.00 $0.00 
16Class 10 Excavation0C.Y.$0.00$0.00 $0.00 $0.00 
17Control Structure0Each$0.00$0.00 $0.00 $0.00 
18Drain Down Pit0Each$0.00$0.00 $0.00 $0.00 
19Drinking Fountain0Each$0.00$0.00 $0.00 $0.00 
20Electrical, Boat Ramp0L.S.$0.00$0.00 $0.00 $0.00 
21Electrical, Fishing Access0L.S.$0.00$0.00 $0.00 $0.00 
22Fishing Bumpout0Each$0.00$0.00 $0.00 $0.00 
23Fishing Pier0Each$0.00$0.00 $0.00 $0.00 
24Granular Shoulders0Tons$0.00$0.00 $0.00 $0.00 
25Grill0Each$0.00$0.00 $0.00 $0.00 
26Handicap Sign0Each$0.00$0.00 $0.00 $0.00 
27HMA Patch0Tons$0.00$0.00 $0.00 $0.00 
28Inline Drain0Each$0.00$0.00 $0.00 $0.00 
29Jug Filler0Each$0.00$0.00 $0.00 $0.00 
30Kiosk, Install Only0L.S.$0.00$0.00 $0.00 $0.00 
31Light, Install And Foundation Only0Each$0.00$0.00 $0.00 $0.00 
32Light, Complete0Each$0.00$0.00 $0.00 $0.00 
33Mobilization0L.S.$0.00$0.00 $0.00 $0.00 
34Mulch Sock0L.F.$0.00$0.00 $0.00 $0.00 
35Native Grass0Acres$0.00$0.00 $0.00 $0.00 
36Pavement Removal0S.Y.$0.00$0.00 $0.00 $0.00 
37Pavement Sawcut0L.F.$0.00$0.00 $0.00 $0.00 
38Pavement Striping0L.F.$0.00$0.00 $0.00 $0.00 
39Retaining Wall0L.F.$0.00$0.00 $0.00 $0.00 
40Seeding, Fertilizing, Mulching0Acres$0.00$0.00 $0.00 $0.00 
41Shelter, Complete0Each$0.00$0.00 $0.00 $0.00 
42Special Backfill0Tons$0.00$0.00 $0.00 $0.00 
43Stairs, 5-step0Each$0.00$0.00 $0.00 $0.00 
44Stairs, 6-step0Each$0.00$0.00 $0.00 $0.00 
45Stairs, Fishing Access0Each$0.00$0.00 $0.00 $0.00 
46Structural Concrete (Boat Ramp)0S.Y.$0.00$0.00 $0.00 $0.00 
47Subdrain Outlet0Each$0.00$0.00 $0.00 $0.00 
48SW-501 Manhole0Each$0.00$0.00 $0.00 $0.00 
49SW-603 Intake0Each$0.00$0.00 $0.00 $0.00 
50Tree Clearing, As Necessary0L.S.$0.00$0.00 $0.00 $0.00 
51Trench Drain0L.F.$0.00$0.00 $0.00 $0.00 
52Construction Staking0L.S.$0.00$0.00 $0.00 $0.00 
53Sidewalk Footing0Each$0.00$0.00 $0.00 $0.00 
54RCP Apron Section Footing0Each$0.00$0.00 $0.00 $0.00 
5512" RCP0L.F.$0.00$0.00 $0.00 $0.00 
5612" RCP Apron0Each$0.00$0.00 $0.00 $0.00 
5712" Dual Wall HDPE0L.F.$0.00$0.00 $0.00 $0.00 
5815" Inline Drain0Each$0.00$0.00 $0.00 $0.00 
      $0.00  $0.00  $0.00 
 



 