 Bids For:  Location:   Pleasant Creek SRA  Date: 5/23/2019  Project No.  
  Phase 1 - PCC Parking Lot Paving  County:   LINN  Time: 11:00 a.m.  19-06-57-04

 

 
1
2
3
Estimated Cost: $940,000.00
Contractor: 
Eastern Iowa Excavating & Concrete, LLCRathje Construction Co.Wicks Construction Inc
Funding Source: 100% Federal-EPA, 121 Nixon St SE
PO Box 189
305 44th St
2201 State Hwy 9
Cascade IA  52033Marion IA  52302Decorah IA  52101
Plan Sets Requested: 7
Quantities
563852512031937731795633822325
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$28,000.00$28,000.00 $32,500.00$32,500.00 $22,500.00$22,500.00 
2Construction Staking1L.S.$6,500.00$6,500.00 $6,000.00$6,000.00 $3,500.00$3,500.00 
3Site Restoration1L.S.$13,250.00$13,250.00 $15,000.00$15,000.00 $15,000.00$15,000.00 
4Pavement Removal13271S.Y.$1.50$19,906.50 $2.00$26,542.00 $3.50$46,448.50 
5Excavation, Class 10 Core Out4171C.Y.$17.50$72,992.50 $8.50$35,453.50 $8.00$33,368.00 
65" PCC96S.Y.$58.85$5,649.60 $54.00$5,184.00 $76.00$7,296.00 
76" PCC12949S.Y.$28.75$372,283.75 $32.00$414,368.00 $35.00$453,215.00 
8Special Backfill4413Tons$18.00$79,434.00 $20.00$88,260.00 $17.50$77,227.50 
924" Dia RCP149L.F.$68.50$10,206.50 $110.00$16,390.00 $65.00$9,685.00 
1024" Dia RCP Aprons5Each$1,285.00$6,425.00 $600.00$3,000.00 $950.00$4,750.00 
11RCP Apron Footing1Each$650.00$650.00 $1,000.00$1,000.00 $1,500.00$1,500.00 
12Signed - ADA6Each$500.00$3,000.00 $600.00$3,600.00 $185.00$1,110.00 
13Signs - Rigging Lane7Each$235.00$1,645.00 $600.00$4,200.00 $185.00$1,295.00 
14Signs - No Parking3Each$285.00$855.00 $600.00$1,800.00 $185.00$555.00 
15Signs - Do Not Enter3Each$240.00$720.00 $600.00$1,800.00 $185.00$555.00 
16Striping4368L.F.$0.50$2,184.00 $2.00$8,736.00 $0.92$4,018.56 
17Painted Handicap Pavement Markings5Each$320.00$1,600.00 $300.00$1,500.00 $65.00$325.00 
18Modified Soil Matrix157C.Y.$47.65$7,481.05 $65.00$10,205.00 $125.00$19,625.00 
19SW-512 Intake1Each$1,165.00$1,165.00 $1,500.00$1,500.00 $1,800.00$1,800.00 
20SW-513 Intake1Each$2,450.00$2,450.00 $1,700.00$1,700.00 $5,000.00$5,000.00 
21Macadam254Tons$23.00$5,842.00 $31.00$7,874.00 $21.50$5,461.00 
22Engineering Fabric755S.Y.$1.90$1,434.50 $2.00$1,510.00 $2.00$1,510.00 
238" HDPE Tile308L.F.$7.00$2,156.00 $18.00$5,544.00 $10.50$3,234.00 
24Native Seeding0.4Acres$1,950.00$780.00 $3,400.00$1,360.00 $7,500.00$3,000.00 
25Silt Fence424L.F.$2.00$848.00 $2.25$954.00 $6.50$2,756.00 
2610" CMP10L.F.$54.50$545.00 $60.00$600.00 $30.00$300.00 
27NPDES General Permit #2 & SWPPP1L.S.$1,750.00$1,750.00 $2,750.00$2,750.00 $2,500.00$2,500.00 
      $649,753.40  $699,330.50  $727,534.56 
Alternate        
28Clearing and Grubbing1L.S.$14,500.00$14,500.00 $7,500.00$7,500.00 $18,600.00$18,600.00 
Alternate        
29Pavement Removal78S.Y.$6.35$495.30 $20.00$1,560.00 $3.50$273.00 
Alternate        
30Boat Slip Repair1L.S.$7,450.00$7,450.00 $15,400.00$15,400.00 $16,500.00$16,500.00 
Alternate        
31Special Backfill54Tons$18.00$972.00 $20.00$1,080.00 $18.00$972.00 
Alternate        
32PCC Sidewalk, 6" Thick Reinforced82S.Y.$74.75$6,129.50 $60.00$4,920.00 $59.00$4,838.00 
      $679,300.20  $729,790.50  $768,717.56 
 
4
5
6
Estimated Cost: $940,000.00
Contractor: 
Boomerang CorpPeterson Contractors, Inc.Top Grade Excavating,Inc
Funding Source: 100% Federal-EPA, 12536 Buffalo Rd
104 Black Hawk St
971 9th Ave NW
Anamosa IA  52205Reinbeck IA  50669-0155Farley IA  52046
Plan Sets Requested: 7
Quantities
319462443531934527135637443416
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$62,000.00$62,000.00 $30,000.00$30,000.00 $38,000.00$38,000.00 
2Construction Staking1L.S.$4,000.00$4,000.00 $7,000.00$7,000.00 $1,600.00$1,600.00 
3Site Restoration1L.S.$5,000.00$5,000.00 $10,000.00$10,000.00 $18,000.00$18,000.00 
4Pavement Removal13271S.Y.$3.00$39,813.00 $3.50$46,448.50 $2.20$29,196.20 
5Excavation, Class 10 Core Out4171C.Y.$15.00$62,565.00 $8.00$33,368.00 $15.80$65,901.80 
65" PCC96S.Y.$55.00$5,280.00 $81.00$7,776.00 $45.00$4,320.00 
76" PCC12949S.Y.$33.00$427,317.00 $35.50$459,689.50 $36.50$472,638.50 
8Special Backfill4413Tons$20.00$88,260.00 $17.50$77,227.50 $9.00$39,717.00 
924" Dia RCP149L.F.$70.00$10,430.00 $65.00$9,685.00 $80.00$11,920.00 
1024" Dia RCP Aprons5Each$1,500.00$7,500.00 $950.00$4,750.00 $900.00$4,500.00 
11RCP Apron Footing1Each$800.00$800.00 $1,500.00$1,500.00 $600.00$600.00 
12Signed - ADA6Each$300.00$1,800.00 $305.00$1,830.00 $460.00$2,760.00 
13Signs - Rigging Lane7Each$350.00$2,450.00 $305.00$2,135.00 $220.00$1,540.00 
14Signs - No Parking3Each$300.00$900.00 $305.00$915.00 $270.00$810.00 
15Signs - Do Not Enter3Each$300.00$900.00 $305.00$915.00 $350.00$1,050.00 
16Striping4368L.F.$0.70$3,057.60 $0.40$1,747.20 $0.50$2,184.00 
17Painted Handicap Pavement Markings5Each$100.00$500.00 $40.00$200.00 $150.00$750.00 
18Modified Soil Matrix157C.Y.$35.00$5,495.00 $125.00$19,625.00 $100.00$15,700.00 
19SW-512 Intake1Each$2,000.00$2,000.00 $1,800.00$1,800.00 $2,600.00$2,600.00 
20SW-513 Intake1Each$5,000.00$5,000.00 $5,000.00$5,000.00 $2,800.00$2,800.00 
21Macadam254Tons$21.00$5,334.00 $21.50$5,461.00 $29.00$7,366.00 
22Engineering Fabric755S.Y.$2.00$1,510.00 $2.00$1,510.00 $3.00$2,265.00 
238" HDPE Tile308L.F.$21.00$6,468.00 $10.50$3,234.00 $33.00$10,164.00 
24Native Seeding0.4Acres$5,000.00$2,000.00 $8,000.00$3,200.00 $10,000.00$4,000.00 
25Silt Fence424L.F.$2.00$848.00 $3.00$1,272.00 $4.00$1,696.00 
2610" CMP10L.F.$35.00$350.00 $30.00$300.00 $76.00$760.00 
27NPDES General Permit #2 & SWPPP1L.S.$1,000.00$1,000.00 $5,500.00$5,500.00 $2,500.00$2,500.00 
Alternate        
28Clearing and Grubbing1L.S.$6,000.00$6,000.00 $18,600.00$18,600.00 $15,000.00$15,000.00 
Alternate        
29Pavement Removal78S.Y.$28.00$2,184.00 $3.50$273.00 $4.00$312.00 
Alternate        
30Boat Slip Repair1L.S.$10,000.00$10,000.00 $16,500.00$16,500.00 $21,000.00$21,000.00 
Alternate        
31Special Backfill54Tons$27.00$1,458.00 $18.00$972.00 $9.00$486.00 
Alternate        
32PCC Sidewalk, 6" Thick Reinforced82S.Y.$70.00$5,740.00 $61.00$5,002.00 $54.00$4,428.00 
      $777,959.60  $783,435.70  $786,564.50 
 
7
8
9
Estimated Cost: $940,000.00
Contractor: 
Horsfield Construction, Inc.Dave Schmitt Construction Company Inc.Absolute Concrete Construction, Inc.
Funding Source: 100% Federal-EPA, 505 East Main St
250 50th Ave SW
505 1st Ave N
Epworth IA  52045Cedar Rapids IA  52404Slater IA  50244
Plan Sets Requested: 7
Quantities
563876333531936586695154976141
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$45,000.00$45,000.00 $102,000.00$102,000.00 $85,000.00$85,000.00 
2Construction Staking1L.S.$5,500.00$5,500.00 $5,495.00$5,495.00 $5,495.00$5,495.00 
3Site Restoration1L.S.$8,000.00$8,000.00 $14,693.00$14,693.00 $30,000.00$30,000.00 
4Pavement Removal13271S.Y.$3.50$46,448.50 $2.55$33,841.05 $2.55$33,841.05 
5Excavation, Class 10 Core Out4171C.Y.$8.00$33,368.00 $11.60$48,383.60 $11.60$48,383.60 
65" PCC96S.Y.$85.00$8,160.00 $64.85$6,225.60 $105.00$10,080.00 
76" PCC12949S.Y.$35.00$453,215.00 $32.00$414,368.00 $36.00$466,164.00 
8Special Backfill4413Tons$17.50$77,227.50 $20.50$90,466.50 $20.50$90,466.50 
924" Dia RCP149L.F.$65.00$9,685.00 $51.85$7,725.65 $52.00$7,748.00 
1024" Dia RCP Aprons5Each$950.00$4,750.00 $1,299.00$6,495.00 $1,300.00$6,500.00 
11RCP Apron Footing1Each$1,500.00$1,500.00 $542.50$542.50 $542.50$542.50 
12Signed - ADA6Each$600.00$3,600.00 $295.00$1,770.00 $325.00$1,950.00 
13Signs - Rigging Lane7Each$600.00$4,200.00 $295.00$2,065.00 $350.00$2,450.00 
14Signs - No Parking3Each$600.00$1,800.00 $295.00$885.00 $325.00$975.00 
15Signs - Do Not Enter3Each$600.00$1,800.00 $295.00$885.00 $350.00$1,050.00 
16Striping4368L.F.$2.00$8,736.00 $0.35$1,528.80 $0.70$3,057.60 
17Painted Handicap Pavement Markings5Each$300.00$1,500.00 $35.00$175.00 $100.00$500.00 
18Modified Soil Matrix157C.Y.$125.00$19,625.00 $43.30$6,798.10 $43.50$6,829.50 
19SW-512 Intake1Each$1,800.00$1,800.00 $1,450.00$1,450.00 $1,450.00$1,450.00 
20SW-513 Intake1Each$5,000.00$5,000.00 $3,947.00$3,947.00 $3,950.00$3,950.00 
21Macadam254Tons$21.50$5,461.00 $26.30$6,680.20 $26.30$6,680.20 
22Engineering Fabric755S.Y.$2.00$1,510.00 $1.20$906.00 $1.20$906.00 
238" HDPE Tile308L.F.$10.50$3,234.00 $12.70$3,911.60 $12.70$3,911.60 
24Native Seeding0.4Acres$8,000.00$3,200.00 $4,500.00$1,800.00 $6,500.00$2,600.00 
25Silt Fence424L.F.$3.00$1,272.00 $2.00$848.00 $3.00$1,272.00 
2610" CMP10L.F.$30.00$300.00 $23.30$233.00 $23.30$233.00 
27NPDES General Permit #2 & SWPPP1L.S.$5,500.00$5,500.00 $4,900.00$4,900.00 $6,500.00$6,500.00 
Alternate        
28Clearing and Grubbing1L.S.$19,000.00$19,000.00 $22,030.00$22,030.00 $22,030.00$22,030.00 
Alternate        
29Pavement Removal78S.Y.$3.50$273.00 $11.40$889.20 $11.40$889.20 
Alternate        
30Boat Slip Repair1L.S.$17,000.00$17,000.00 $24,500.00$24,500.00 $28,000.00$28,000.00 
Alternate        
31Special Backfill54Tons$18.00$972.00 $34.80$1,879.20 $34.80$1,879.20 
Alternate        
32PCC Sidewalk, 6" Thick Reinforced82S.Y.$88.00$7,216.00 $60.00$4,920.00 $200.00$16,400.00 
      $805,853.00  $823,237.00  $897,733.95 
 
10
11
12
Estimated Cost: $940,000.00
Contractor: 
BWC Excavating, LC
Funding Source: 100% Federal-EPA, 1303 Hickory Hollow Rd


Solon IA  52333    
Plan Sets Requested: 7
Quantities
3198487513
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$70,000.00$70,000.00 $0.00 $0.00 
2Construction Staking1L.S.$15,000.00$15,000.00 $0.00 $0.00 
3Site Restoration1L.S.$10,000.00$10,000.00 $0.00 $0.00 
4Pavement Removal13271S.Y.$4.00$53,084.00 $0.00 $0.00 
5Excavation, Class 10 Core Out4171C.Y.$10.00$41,710.00 $0.00 $0.00 
65" PCC96S.Y.$54.25$5,208.00 $0.00 $0.00 
76" PCC12949S.Y.$37.50$485,587.50 $0.00 $0.00 
8Special Backfill4413Tons$25.00$110,325.00 $0.00 $0.00 
924" Dia RCP149L.F.$68.00$10,132.00 $0.00 $0.00 
1024" Dia RCP Aprons5Each$985.00$4,925.00 $0.00 $0.00 
11RCP Apron Footing1Each$900.00$900.00 $0.00 $0.00 
12Signed - ADA6Each$650.00$3,900.00 $0.00 $0.00 
13Signs - Rigging Lane7Each$650.00$4,550.00 $0.00 $0.00 
14Signs - No Parking3Each$650.00$1,950.00 $0.00 $0.00 
15Signs - Do Not Enter3Each$650.00$1,950.00 $0.00 $0.00 
16Striping4368L.F.$2.50$10,920.00 $0.00 $0.00 
17Painted Handicap Pavement Markings5Each$325.00$1,625.00 $0.00 $0.00 
18Modified Soil Matrix157C.Y.$55.00$8,635.00 $0.00 $0.00 
19SW-512 Intake1Each$1,650.00$1,650.00 $0.00 $0.00 
20SW-513 Intake1Each$3,350.00$3,350.00 $0.00 $0.00 
21Macadam254Tons$27.00$6,858.00 $0.00 $0.00 
22Engineering Fabric755S.Y.$3.00$2,265.00 $0.00 $0.00 
238" HDPE Tile308L.F.$8.00$2,464.00 $0.00 $0.00 
24Native Seeding0.4Acres$3,920.00$1,568.00 $0.00 $0.00 
25Silt Fence424L.F.$2.50$1,060.00 $0.00 $0.00 
2610" CMP10L.F.$85.00$850.00 $0.00 $0.00 
27NPDES General Permit #2 & SWPPP1L.S.$12,500.00$12,500.00 $0.00 $0.00 
Alternate        
28Clearing and Grubbing1L.S.$12,500.00$12,500.00 $0.00 $0.00 
Alternate        
29Pavement Removal78S.Y.$5.00$390.00 $0.00 $0.00 
Alternate        
30Boat Slip Repair1L.S.$10,000.00$10,000.00 $0.00 $0.00 
Alternate        
31Special Backfill54Tons$25.00$1,350.00 $0.00 $0.00 
Alternate        
32PCC Sidewalk, 6" Thick Reinforced82S.Y.$64.00$5,248.00 $0.00 $0.00 
      $902,454.50  $0.00  $0.00 
 



 

4/25/2024