IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Green Valley State Park | Date: 11/15/2018 | Project No. |
Pavement Repair Rebid | County: | UNION | Time: 11:00 AM | 17-04-88-06 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $110,000.00 | Contractor: | Ten Point Construction | Henriksen Contracting, LLC | ||||||||||
Funding Source: 100% Park & Institutional Road Fund, | 2212 Hwy 59 | 4154 SE Capitol Cir | |||||||||||
Denison IA 51442 | Grimes IA 50111 | ||||||||||||
Plan Sets Requested: 2 | Quantities | 712-263-5181 | (515) 986-4343 | ||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | 2102 - SPECIAL BACKFILL | 28 | Tons | $47.00 | $1,316.00 | $150.00 | $4,200.00 | $0.00 | |||||
2 | 2102 - EXCAVATION, CLASS 10, ROADWAY AND BORROW | 15 | C.Y. | $42.00 | $630.00 | $150.00 | $2,250.00 | $0.00 | |||||
3 | 2306 - ASPHALT EMULSION FOR FOG SEAL (PAVEMENT) | 901 | GAL. | $9.00 | $8,109.00 | $5.00 | $4,505.00 | $0.00 | |||||
4 | 2518 - SAFETY CLOSURE | 12 | Each | $150.00 | $1,800.00 | $150.00 | $1,800.00 | $0.00 | |||||
5 | 2528 - TRAFFIC CONTROL | 1 | L.S. | $1,500.00 | $1,500.00 | $5,000.00 | $5,000.00 | $0.00 | |||||
6 | 2529 - PATCHES, FULL-DEPTH FINISH, BY AREA. 6-INCH HMA | 208 | S.Y. | $102.00 | $21,216.00 | $350.00 | $72,800.00 | $0.00 | |||||
7 | 2529 - PATCHES, FULL-DEPTH FINISH, 6-INCH., BY COUNT, HMA | 3 | Each | $200.00 | $600.00 | $1,000.00 | $3,000.00 | $0.00 | |||||
8 | 2533 - MOBILIZATION | 1 | L.S. | $13,500.00 | $13,500.00 | $100.00 | $100.00 | $0.00 | |||||
9 | 2541 - CRACK AND JOINT CLEANING AND SEALING (HMA SURFACES) | 2.3 | MI. | $3,540.00 | $8,142.00 | $500.00 | $1,150.00 | $0.00 | |||||
10 | 2541 - SEALER MATERIAL (HMA SURFACES) | 805 | LB. | $1.60 | $1,288.00 | $13,000.00 | $10,465,000.00 | $0.00 | |||||
11 | 2543 - TRANSVERSE JOINT REPAIR | 86 | Tons | $351.00 | $30,186.00 | $10,500.00 | $903,000.00 | $0.00 | |||||
12 | 2113 - SUBGRADE STABILIZATION MATERIAL, POLYMER GRID | 208 | S.Y. | $6.00 | $1,248.00 | $200.00 | $41,600.00 | $0.00 | |||||
13 | 2530 - HOT MIX ASPHALT (PARTIAL DEPTH PATCH MATERIAL) | 11 | Tons | $210.00 | $2,310.00 | $340.00 | $3,740.00 | $0.00 | |||||
14 | 2530 - REGULAR PARTIAL DEPTH HOT MIX ASPHALT FINISH PATCHES, BY AREA | 40 | S.Y. | $116.00 | $4,640.00 | $0.00 | $0.00 | $0.00 | |||||
$96,485.00 | $11,508,145.00 | $0.00 | |||||||||||
Henriksen Contracting, LLC, Grimes, IA
4/25/2024