IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Other  Date: 7/25/2019  Project No.  
  Pond structure at Kellerton  County:   RINGGOLD  Time: 3:00 p.m.  18-04-80-03

 

 
1
2
3
Estimated Cost: $22,000.00
Contractor: 
Jeff Sickels Dozing LLCSchaefer Excavating, Inc.Jason Roberts LLC
Funding Source: 100% REAP OS Acquisition & Development, 2047 220th St
1864 215th St
817 Stuart St
PO Box 304
Mt Ayr IA  50854Mount Ayr IA  50854Adair IA  50002
Plan Sets Requested: 0
Quantities
515250214864134468736417401411
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$500.00$500.00 $200.00$200.00 $1,000.00$1,000.00 
2Core Trench Excavation892C.Y.$1.80$1,605.60 $1.85$1,650.20 $2.00$1,784.00 
3Earth Fill (In Place)7253C.Y.$1.75$12,692.75 $1.85$13,418.05 $1.92$13,925.76 
46" Smooth Metal Pipe w/Canopy Inlet84L.F.$12.00$1,008.00 $14.90$1,251.60 $45.23$3,799.32 
560"x60"x1/4" Metal Antiseep Collar2Each$150.00$300.00 $100.00$200.00 $100.00$200.00 
6Trash rack Assembly1Each$200.00$200.00 $100.00$100.00 $200.00$200.00 
7Livestock Watering System1L.S.$900.00$900.00 $750.00$750.00 $700.00$700.00 
8Fert, Seeding & Mulching1L.S.$1,000.00$1,000.00 $1,000.00$1,000.00 $950.00$950.00 
      $18,206.35  $18,569.85  $22,559.08 
 
 
4
5
6
Estimated Cost: $22,000.00
Contractor: 
JNC Construction, LLC
Funding Source: 100% REAP OS Acquisition & Development, 609 3rd St


Clearfield IA  50840    
Plan Sets Requested: 0
Quantities
6413444119
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$1,750.00$1,750.00 $0.00 $0.00 
2Core Trench Excavation892C.Y.$3.00$2,676.00 $0.00 $0.00 
3Earth Fill (In Place)7253C.Y.$2.50$18,132.50 $0.00 $0.00 
46" Smooth Metal Pipe w/Canopy Inlet84L.F.$20.00$1,680.00 $0.00 $0.00 
560"x60"x1/4" Metal Antiseep Collar2Each$300.00$600.00 $0.00 $0.00 
6Trash rack Assembly1Each$100.00$100.00 $0.00 $0.00 
7Livestock Watering System1L.S.$1,000.00$1,000.00 $0.00 $0.00 
8Fert, Seeding & Mulching1L.S.$2,000.00$2,000.00 $0.00 $0.00 
      $27,938.50  $0.00  $0.00 
 



 

4/7/2026