IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Spirit Lake Fish Hatchery | Date: 9/20/2018 | Project No. |
Discharge Line Replacement | County: | DICKINSON | Time: 3:00 p.m. | 19-01-30-02 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $84,000.00 | Contractor: | Cory Juergens Construction LLC | Valley Contracting, Inc. | ||||||||||
Funding Source: 75% Cash Donation, 25% REAP Land Management, | 219 W 2 St S | 1850 Hwy 4 | |||||||||||
Estherville IA 51334 | Estherville IA 51334 | ||||||||||||
Plan Sets Requested: 0 | Quantities | 7123800184 | 17123624969 | ||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Mobilization | 1 | L.S. | $5,000.00 | $5,000.00 | $1,900.00 | $1,900.00 | $0.00 | |||||
2 | Clear & Grub Trees & Vegetation | 1 | L.S. | $2,000.00 | $2,000.00 | $3,050.00 | $3,050.00 | $0.00 | |||||
3 | Saw Cut Pavement | 120 | L.F. | $4.00 | $480.00 | $7.00 | $840.00 | $0.00 | |||||
4 | Pavement Removal | 172 | S.Y. | $8.00 | $1,376.00 | $10.00 | $1,720.00 | $0.00 | |||||
5 | 6" PCC Paving | 130 | S.Y. | $47.00 | $6,110.00 | $52.00 | $6,760.00 | $0.00 | |||||
6 | Granular Sub Base for PCC | 50 | Tons | $14.00 | $700.00 | $20.00 | $1,000.00 | $0.00 | |||||
7 | Replace Pipe with 8" SDR 35 C900 PVC Pipe | 1 | L.S. | $2,800.00 | $2,800.00 | $3,000.00 | $3,000.00 | $0.00 | |||||
8 | Connect 8" PVC Pipe to Hatchery Building & Existing Pipe | 4 | Each | $500.00 | $2,000.00 | $750.00 | $3,000.00 | $0.00 | |||||
9 | Connect 12 PVC Pipe to Existing Manhole | 1 | Each | $1,500.00 | $1,500.00 | $1,100.00 | $1,100.00 | $0.00 | |||||
10 | 4000 PSI 6" PCC with #4 Bar 18" c-c | 42 | S.Y. | $75.00 | $3,150.00 | $60.00 | $2,520.00 | $0.00 | |||||
11 | Replace 12" VCP Pipe with DR 25 C900 PVC Discharge Pipe | 471 | L.F. | $26.00 | $12,246.00 | $52.00 | $24,492.00 | $0.00 | |||||
12 | Granular Pipe Bedding | 52 | Tons | $22.00 | $1,144.00 | $32.00 | $1,664.00 | $0.00 | |||||
13 | 12" Direct Bury Gate Valve | 2 | Each | $3,000.00 | $6,000.00 | $2,350.00 | $4,700.00 | $0.00 | |||||
14 | Remove Existing Piping & PCC Structures | 1 | L.S. | $2,500.00 | $2,500.00 | $3,000.00 | $3,000.00 | $0.00 | |||||
15 | Bar Guard for End of Pipe | 1 | Each | $750.00 | $750.00 | $250.00 | $250.00 | $0.00 | |||||
16 | Reshape/Repair Dike (Imported Fill) | 100 | C.Y. | $40.00 | $4,000.00 | $30.00 | $3,000.00 | $0.00 | |||||
17 | DOT Class D Revetment Stone | 270 | Tons | $65.00 | $17,550.00 | $47.00 | $12,690.00 | $0.00 | |||||
18 | 9" to 18" Fieldstone for Pipe Outlet & Shoreline | 15 | Tons | $50.00 | $750.00 | $40.00 | $600.00 | $0.00 | |||||
19 | Replace Existing Pipe with 18" CMP Pipe (between ponds) | 25 | L.F. | $26.00 | $650.00 | $44.00 | $1,100.00 | $0.00 | |||||
20 | Erosion Control | 1 | L.S. | $2,000.00 | $2,000.00 | $600.00 | $600.00 | $0.00 | |||||
21 | Dewatering (for trench) | 1 | L.S. | $1,000.00 | $1,000.00 | $1,600.00 | $1,600.00 | $0.00 | |||||
22 | Site Restoration/Seeding | 1 | L.S. | $4,000.00 | $4,000.00 | $2,100.00 | $2,100.00 | $0.00 | |||||
$77,706.00 | $80,686.00 | $0.00 | |||||||||||