IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Maquoketa Wildlife Unit  Date: 6/28/2018  Project No.  
  Takes Wetland Restoration  County:   DELAWARE  Time: 3:00 p.m.  18-06-28-02

 

 
1
2
3
Estimated Cost: $35,000.00
Contractor: 
Dan Oberbreckling Concrete & ExcavatingLaGrange, Inc.VonBehren Excavating Inc.
Funding Source: 40% Federal-NAWCA, 50% Funding Source 1, 10% Other, 2780 Coggon Rd
2857 120th St
7688 140th Ave
Coggon IA  52218Amana IA  52203Olin IA  52320
Plan Sets Requested: 0
Quantities
(563) 920-0970(319) 227-3013(319) 540-3969
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilizatoin1L.S.$500.00$500.00 $4,000.00$4,000.00 $2,000.00$2,000.00 
2Berm Excavation1L.S.$14,000.00$14,000.00 $16,000.00$16,000.00 $19,250.00$19,250.00 
3Overflow Structure1L.S.$11,000.00$11,000.00 $10,000.00$10,000.00 $11,671.05$11,671.05 
4Tile, 8" PVC (Dual Wall)40L.F.$2.00$80.00 $12.50$500.00 $4.95$198.00 
5Water Level Control Structure1Each$1,500.00$1,500.00 $500.00$500.00 $700.00$700.00 
6Seed and Mulch1L.S.$1,000.00$1,000.00 $2,340.00$2,340.00 $1,500.00$1,500.00 
      $28,080.00  $33,340.00  $35,319.05 
 
 
4
5
6
Estimated Cost: $35,000.00
Contractor: 
Donlon Brothers Construction LLCBurr Oak SpringsCrane Construction
Funding Source: 40% Federal-NAWCA, 50% Funding Source 1, 10% Other, 4061 Dove Rd
2113 Co Rd W14
1833 120th Ave
Elgin IA  52141Ridgeway IA  52165Manchester IA  52057
Plan Sets Requested: 0
Quantities
(563) 581-5036(563) 737-2510(563) 920-1250
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilizatoin1L.S.$3,000.00$3,000.00 $5,000.00$5,000.00 $900.00$900.00 
2Berm Excavation1L.S.$14,000.00$14,000.00 $21,000.00$21,000.00 $17,000.00$17,000.00 
3Overflow Structure1L.S.$15,000.00$15,000.00 $14,000.00$14,000.00 $10,700.00$10,700.00 
4Tile, 8" PVC (Dual Wall)40L.F.$20.00$800.00 $250.00$10,000.00 $800.00$32,000.00 
5Water Level Control Structure1Each$2,500.00$2,500.00 $1,000.00$1,000.00 $1,200.00$1,200.00 
6Seed and Mulch1L.S.$4,000.00$4,000.00 $1,000.00$1,000.00 $2,400.00$2,400.00 
      $39,300.00  $52,000.00  $64,200.00 
 
7
8
9
Estimated Cost: $35,000.00
Contractor: 
B & J Hauling and Excavation Inc.Pirc-Tobin Construction, Inc.F.L. Krapfl Inc.
Funding Source: 40% Federal-NAWCA, 50% Funding Source 1, 10% Other,
PO Box 226

PO Box 160
3295 Vine Rd
PO Box 303
Monticello IA  52310Alburnett IA  52202Dyersville IA  52040
Plan Sets Requested: 0
Quantities
(319) 480-1218(319) 842-2130(563) 875-8938
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilizatoin1L.S.$4,000.00$4,000.00 $9,500.00$9,500.00 $7,000.00$7,000.00 
2Berm Excavation1L.S.$31,500.00$31,500.00 $47,850.00$47,850.00 $58,380.00$58,380.00 
3Overflow Structure1L.S.$14,409.50$14,409.50 $17,500.00$17,500.00 $22,978.00$22,978.00 
4Tile, 8" PVC (Dual Wall)40L.F.$15.00$600.00 $20.00$800.00 $17.00$680.00 
5Water Level Control Structure1Each$1,500.00$1,500.00 $980.00$980.00 $1,345.00$1,345.00 
6Seed and Mulch1L.S.$16,700.00$16,700.00 $10,000.00$10,000.00 $6,673.00$6,673.00 
      $68,709.50  $86,630.00  $97,056.00 
 



 

3/28/2024