 Bids For:  Location:   Central Park Lake  Date: 4/20/2017  Project No.  
  Mechanical Dredging & Shoreline Armoring  County:   JONES  Time: 11:00 a.m.  16-06-53-01

 

 
1
2
3
Estimated Cost: $1,600,000.00
Contractor: 
Peterson Contractors, Inc.B & J Hauling and Excavation Inc.Leffler Dirtworks, LLC
Funding Source: 75% Funding Source 1, 25% Funding Source 2, 104 Black Hawk St

PO Box 226
2272 320th St
Reinbeck IA  50669Monticello IA  52310Oskaloosa IA  52577
Plan Sets Requested: 0
Quantities
319-345-2713319-480-1218641-226-2231
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$30,000.00$30,000.00 $45,000.00$45,000.00 $13,500.00$13,500.00 
2Stabilizing Crop Seeding and Fertilizing18Acres$700.00$12,600.00 $400.00$7,200.00 $500.00$9,000.00 
3Seeding and Fertilizing18Acres$1,350.00$24,300.00 $1,800.00$32,400.00 $1,500.00$27,000.00 
4Tile Investigation80L.F.$6.00$480.00 $7.00$560.00 $5.00$400.00 
58" Perf HDPE Tile2999L.F.$6.00$17,994.00 $2.68$8,037.32 $2.70$8,097.30 
68" Tile Intake11Each$200.00$2,200.00 $217.10$2,388.10 $125.00$1,375.00 
7Tile Outlet5Each$480.00$2,400.00 $100.00$500.00 $500.00$2,500.00 
86" Triple Wall HDPE86L.F.$11.75$1,010.50 $12.00$1,032.00 $10.00$860.00 
9Traffic Control1L.S.$3,500.00$3,500.00 $200.00$200.00 $1,000.00$1,000.00 
10Revetment, Class E10931.5Tons$24.50$267,821.75 $27.00$295,150.50 $35.00$382,602.50 
11Shot Rock2535Tons$17.25$43,728.75 $18.00$45,630.00 $25.00$63,375.00 
12Porous Backfill11Tons$35.75$393.25 $34.00$374.00 $30.00$330.00 
13Porous Backfill (Pea Gravel)560Tons$27.50$15,400.00 $26.00$14,560.00 $30.00$16,800.00 
14Fine Drainfill (Sand)612Tons$20.00$12,240.00 $20.00$12,240.00 $25.00$15,300.00 
15Granular Backfill159Tons$16.00$2,544.00 $17.00$2,703.00 $25.00$3,975.00 
16Engineering Fabric16652S.Y.$1.50$24,978.00 $1.50$24,978.00 $2.75$45,793.00 
177" PCC391S.Y.$49.25$19,256.75 $59.00$23,069.00 $44.00$17,204.00 
18Structural Concrete76S.Y.$68.60$5,213.60 $69.00$5,244.00 $55.00$4,180.00 
19Earth Shoulder320L.F.$3.00$960.00 $3.00$960.00 $10.00$3,200.00 
20Pavement Removal467S.Y.$3.00$1,401.00 $4.75$2,218.25 $12.00$5,604.00 
21Excavation, Class 10 (Main Lake)98000C.F.$3.25$318,500.00 $5.05$494,900.00 $5.00$490,000.00 
22Excavation, Class 10 (Upper End)5000C.F.$3.50$17,500.00 $3.25$16,250.00 $5.00$25,000.00 
23Earthfill (Habitat Mounds)2180C.Y.$4.50$9,810.00 $5.25$11,445.00 $1.50$3,270.00 
24Earthfill (Spillway Replacement)2300C.F.$10.25$23,575.00 $3.00$6,900.00 $2.00$4,600.00 
25Narrow Base Terrace2740L.F.$3.75$10,275.00 $2.25$6,165.00 $3.00$8,220.00 
2636" Dia Smooth Steel Pipe (SSP)173L.F.$109.00$18,857.00 $143.27$24,785.71 $75.00$12,975.00 
2712" RCP, 2000D60L.F.$40.25$2,415.00 $54.00$3,240.00 $100.00$6,000.00 
28SSP Footing1Each$1,500.00$1,500.00 $1,800.00$1,800.00 $5,000.00$5,000.00 
2972" Dia Sanitary Sewer Manhole1Each$7,700.00$7,700.00 $10,075.00$10,075.00 $14,000.00$14,000.00 
3072" Dia Trash Rack1Each$2,700.00$2,700.00 $3,000.00$3,000.00 $4,000.00$4,000.00 
3112" x 12" Sluice Gate1Each$9,300.00$9,300.00 $6,478.00$6,478.00 $4,000.00$4,000.00 
3236" Dia CMP56L.F.$60.00$3,360.00 $35.65$1,996.40 $75.00$4,200.00 
3336" Dia CMP Aprons2Each$615.00$1,230.00 $500.00$1,000.00 $500.00$1,000.00 
34Silt Fence4151L.F.$1.50$6,226.50 $1.50$6,226.50 $4.00$16,604.00 
35Misc. Excavator Work24HR.$235.00$5,640.00 $175.00$4,200.00 $165.00$3,960.00 
36Debris Removal30C.Y.$75.00$2,250.00 $20.00$600.00 $7.00$210.00 
      $929,260.10  $1,123,505.78  $1,225,134.80 
Alternate        
37Excavation, Class 1022000C.Y.$3.25$71,500.00 $5.05$111,100.00 $7.00$154,000.00 
Alternate        
38Excavation, Class 1010000C.Y.$3.50$35,000.00 $6.05$60,500.00 $7.00$70,000.00 
Alternate        
39Excavation, Class 1015000C.Y.$3.50$52,500.00 $6.05$90,750.00 $0.00$0.00 
      $1,088,260.10  $1,385,855.78  $1,449,134.80 
 
4
5
6
Estimated Cost: $1,600,000.00
Contractor: 
JB Holland Construction, LNCConnolly Construction Inc.Ricklefs Excavating, Ltd.
Funding Source: 75% Funding Source 1, 25% Funding Source 2, 2092 Hwy 9 W
18409 N Cascade Rd
12536 Buffalo Rd
Decorah IA  52101Peosta IA  52068Anamosa IA  52205
Plan Sets Requested: 0
Quantities
563-382-2901563-876-3225319-462-4435
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$15,000.00$15,000.00 $146,081.16$146,081.16 $75,000.00$75,000.00 
2Stabilizing Crop Seeding and Fertilizing18Acres$406.00$7,308.00 $470.89$8,476.02 $500.00$9,000.00 
3Seeding and Fertilizing18Acres$1,830.00$32,940.00 $2,118.98$38,141.64 $1,500.00$27,000.00 
4Tile Investigation80L.F.$11.20$896.00 $13.07$1,045.60 $15.00$1,200.00 
58" Perf HDPE Tile2999L.F.$10.75$32,239.25 $3.51$10,526.49 $7.50$22,492.50 
68" Tile Intake11Each$260.00$2,860.00 $180.54$1,985.94 $285.00$3,135.00 
7Tile Outlet5Each$176.00$880.00 $160.60$803.00 $210.00$1,050.00 
86" Triple Wall HDPE86L.F.$10.00$860.00 $16.19$1,392.34 $20.00$1,720.00 
9Traffic Control1L.S.$1,050.00$1,050.00 $202.35$202.35 $100.00$100.00 
10Revetment, Class E10931.5Tons$28.50$311,547.75 $35.70$390,254.55 $22.00$240,493.00 
11Shot Rock2535Tons$22.00$55,770.00 $26.92$68,242.20 $15.00$38,025.00 
12Porous Backfill11Tons$21.00$231.00 $33.06$363.66 $25.00$275.00 
13Porous Backfill (Pea Gravel)560Tons$24.00$13,440.00 $33.85$18,956.00 $30.00$16,800.00 
14Fine Drainfill (Sand)612Tons$15.00$9,180.00 $28.32$17,331.84 $30.00$18,360.00 
15Granular Backfill159Tons$15.50$2,464.50 $20.90$3,323.10 $25.00$3,975.00 
16Engineering Fabric16652S.Y.$1.75$29,141.00 $2.51$41,796.52 $1.50$24,978.00 
177" PCC391S.Y.$71.00$27,761.00 $59.20$23,147.20 $45.00$17,595.00 
18Structural Concrete76S.Y.$71.00$5,396.00 $79.21$6,019.96 $65.00$4,940.00 
19Earth Shoulder320L.F.$1.90$608.00 $6.10$1,952.00 $2.50$800.00 
20Pavement Removal467S.Y.$4.00$1,868.00 $5.14$2,400.38 $5.00$2,335.00 
21Excavation, Class 10 (Main Lake)98000C.F.$7.38$723,240.00 $6.78$664,440.00 $9.00$882,000.00 
22Excavation, Class 10 (Upper End)5000C.F.$11.62$58,100.00 $6.24$31,200.00 $8.00$40,000.00 
23Earthfill (Habitat Mounds)2180C.Y.$4.15$9,047.00 $5.93$12,927.40 $3.50$7,630.00 
24Earthfill (Spillway Replacement)2300C.F.$4.70$10,810.00 $9.51$21,873.00 $4.50$10,350.00 
25Narrow Base Terrace2740L.F.$1.45$3,973.00 $5.08$13,919.20 $1.50$4,110.00 
2636" Dia Smooth Steel Pipe (SSP)173L.F.$105.00$18,165.00 $150.93$26,110.89 $200.00$34,600.00 
2712" RCP, 2000D60L.F.$38.00$2,280.00 $46.58$2,794.80 $60.00$3,600.00 
28SSP Footing1Each$1,350.00$1,350.00 $4,063.22$4,063.22 $1,650.00$1,650.00 
2972" Dia Sanitary Sewer Manhole1Each$9,990.00$9,990.00 $10,794.03$10,794.03 $22,000.00$22,000.00 
3072" Dia Trash Rack1Each$2,405.00$2,405.00 $2,715.37$2,715.37 $3,000.00$3,000.00 
3112" x 12" Sluice Gate1Each$4,566.00$4,566.00 $8,626.41$8,626.41 $5,000.00$5,000.00 
3236" Dia CMP56L.F.$56.00$3,136.00 $44.42$2,487.52 $50.00$2,800.00 
3336" Dia CMP Aprons2Each$846.00$1,692.00 $534.78$1,069.56 $500.00$1,000.00 
34Silt Fence4151L.F.$1.50$6,226.50 $1.77$7,347.27 $1.65$6,849.15 
35Misc. Excavator Work24HR.$185.00$4,440.00 $210.00$5,040.00 $150.00$3,600.00 
36Debris Removal30C.Y.$50.00$1,500.00 $13.85$415.50 $20.00$600.00 
Alternate        
37Excavation, Class 1022000C.Y.$5.85$128,700.00 $6.78$149,160.00 $9.00$198,000.00 
Alternate        
38Excavation, Class 1010000C.Y.$5.78$57,800.00 $8.22$82,200.00 $9.00$90,000.00 
Alternate        
39Excavation, Class 1015000C.Y.$5.95$89,250.00 $8.22$123,300.00 $9.00$135,000.00 
      $1,688,111.00  $1,952,926.12  $1,961,062.65 
 
7
8
9
Estimated Cost: $1,600,000.00
Contractor: 
Miller Trucking & ExcavatingSunflower Enterprises, Inc.
Funding Source: 75% Funding Source 1, 25% Funding Source 2, 3303 John Deere Rd
5 Jones St

Silvis IL  61282Dubuque IA  52001  
Plan Sets Requested: 0
Quantities
309-755-7644563-583-0556
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$25,000.00$25,000.00 $239,010.00$239,010.00 $0.00 
2Stabilizing Crop Seeding and Fertilizing18Acres$527.00$9,486.00 $1,000.00$18,000.00 $0.00 
3Seeding and Fertilizing18Acres$2,250.00$40,500.00 $2,000.00$36,000.00 $0.00 
4Tile Investigation80L.F.$28.00$2,240.00 $50.00$4,000.00 $0.00 
58" Perf HDPE Tile2999L.F.$28.00$83,972.00 $15.00$44,985.00 $0.00 
68" Tile Intake11Each$906.00$9,966.00 $250.00$2,750.00 $0.00 
7Tile Outlet5Each$1,590.00$7,950.00 $250.00$1,250.00 $0.00 
86" Triple Wall HDPE86L.F.$50.00$4,300.00 $50.00$4,300.00 $0.00 
9Traffic Control1L.S.$390.00$390.00 $2,000.00$2,000.00 $0.00 
10Revetment, Class E10931.5Tons$30.00$327,945.00 $39.00$426,328.50 $0.00 
11Shot Rock2535Tons$19.00$48,165.00 $49.00$124,215.00 $0.00 
12Porous Backfill11Tons$41.00$451.00 $85.65$942.15 $0.00 
13Porous Backfill (Pea Gravel)560Tons$51.00$28,560.00 $60.00$33,600.00 $0.00 
14Fine Drainfill (Sand)612Tons$43.00$26,316.00 $37.45$22,919.40 $0.00 
15Granular Backfill159Tons$17.00$2,703.00 $38.00$6,042.00 $0.00 
16Engineering Fabric16652S.Y.$1.00$16,652.00 $3.00$49,956.00 $0.00 
177" PCC391S.Y.$9.00$3,519.00 $50.00$19,550.00 $0.00 
18Structural Concrete76S.Y.$75.00$5,700.00 $200.00$15,200.00 $0.00 
19Earth Shoulder320L.F.$10.00$3,200.00 $40.00$12,800.00 $0.00 
20Pavement Removal467S.Y.$4.00$1,868.00 $5.00$2,335.00 $0.00 
21Excavation, Class 10 (Main Lake)98000C.F.$9.00$882,000.00 $9.95$975,100.00 $0.00 
22Excavation, Class 10 (Upper End)5000C.F.$12.00$60,000.00 $9.95$49,750.00 $0.00 
23Earthfill (Habitat Mounds)2180C.Y.$17.00$37,060.00 $12.00$26,160.00 $0.00 
24Earthfill (Spillway Replacement)2300C.F.$19.00$43,700.00 $12.00$27,600.00 $0.00 
25Narrow Base Terrace2740L.F.$7.00$19,180.00 $5.00$13,700.00 $0.00 
2636" Dia Smooth Steel Pipe (SSP)173L.F.$210.00$36,330.00 $150.00$25,950.00 $0.00 
2712" RCP, 2000D60L.F.$122.00$7,320.00 $100.00$6,000.00 $0.00 
28SSP Footing1Each$3,295.00$3,295.00 $3,000.00$3,000.00 $0.00 
2972" Dia Sanitary Sewer Manhole1Each$25,000.00$25,000.00 $9,000.00$9,000.00 $0.00 
3072" Dia Trash Rack1Each$3,150.00$3,150.00 $2,000.00$2,000.00 $0.00 
3112" x 12" Sluice Gate1Each$5,353.00$5,353.00 $2,500.00$2,500.00 $0.00 
3236" Dia CMP56L.F.$106.00$5,936.00 $110.00$6,160.00 $0.00 
3336" Dia CMP Aprons2Each$1,494.00$2,988.00 $750.00$1,500.00 $0.00 
34Silt Fence4151L.F.$2.00$8,302.00 $2.50$10,377.50 $0.00 
35Misc. Excavator Work24HR.$386.00$9,264.00 $200.00$4,800.00 $0.00 
36Debris Removal30C.Y.$157.00$4,710.00 $200.00$6,000.00 $0.00 
Alternate        
37Excavation, Class 1022000C.Y.$9.00$198,000.00 $7.00$154,000.00 $0.00 
Alternate        
38Excavation, Class 1010000C.Y.$9.00$90,000.00 $7.00$70,000.00 $0.00 
Alternate        
39Excavation, Class 1015000C.Y.$9.00$135,000.00 $7.00$105,000.00 $0.00 
      $2,225,471.00  $2,564,780.55  $0.00 
 



 