IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Hickory Grove Lake  Date: 11/15/2018  Project No.  
  Mechanical Dredging & Shoreline Armoring  County:   STORY  Time: 11:00 AM  16-02-85-05

 

 
1
2
3
Estimated Cost: $3,400,000.00
Contractor: 
RW Excavating Solutions LCPeterson Contractors, Inc.Hendrickson Transportation, LLC
Funding Source: 75% Lake Restoration, 25% Other, 13293 S 88th Ave W
104 Black Hawk St
2762 310th St
Prairie City IA  50228Reinbeck IA  50669-0155Hamburg IA  51640
Plan Sets Requested: 9
Quantities
5159942648(319) 788-47317123821505
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
124" Dia CMP418L.F.$28.88$12,071.84 $42.50$17,765.00 $75.00$31,350.00 
23/8" Minus Crushed Stone6Tons$40.00$240.00 $80.00$480.00 $45.00$270.00 
330" Dia CMP45L.F.$45.60$2,052.00 $61.00$2,745.00 $85.00$3,825.00 
436" Dia. CMP76L.F.$54.72$4,158.72 $70.00$5,320.00 $115.00$8,740.00 
55" PCC84S.Y.$55.00$4,620.00 $54.00$4,536.00 $50.00$4,200.00 
66" PCC4530S.Y.$60.00$271,800.00 $41.00$185,730.00 $50.00$226,500.00 
78" Dia CMP53L.F.$14.00$742.00 $30.00$1,590.00 $30.00$1,590.00 
8942 Draw Down2Each$80,000.00$160,000.00 $360,000.00$720,000.00 $100,000.00$200,000.00 
9Class 10 Excavation (Embankment)73279C.Y.$5.17$378,852.43 $4.65$340,747.35 $6.00$439,674.00 
10Class 10 Excavation (Waste)22586C.Y.$5.50$124,223.00 $4.00$90,344.00 $9.00$203,274.00 
11Class A Crushed Stone84Tons$28.80$2,419.20 $29.15$2,448.60 $35.00$2,940.00 
12Class D Revetment266Tons$44.80$11,916.80 $60.00$15,960.00 $55.00$14,630.00 
13Class D Revetment - Linear Mounds - Labor Only1300Tons$32.00$41,600.00 $24.75$32,175.00 $32.00$41,600.00 
14Class D Revetment - Salvaged Rock - Labor Only660Tons$32.00$21,120.00 $18.50$12,210.00 $25.00$16,500.00 
15Class E Revetment13688.6Tons$44.80$613,249.28 $48.75$667,319.25 $55.00$752,873.00 
16Clearing and Grubbing3.38Acres$4,500.00$15,210.00 $4,000.00$13,520.00 $2,500.00$8,450.00 
17Compaction with Moisture and Density Control29109C.Y.$1.00$29,109.00 $3.00$87,327.00 $1.00$29,109.00 
18Concrete Testing1L.S.$5,000.00$5,000.00 $10,000.00$10,000.00 $10,000.00$10,000.00 
19Construction Staking1L.S.$12,000.00$12,000.00 $40,000.00$40,000.00 $30,000.00$30,000.00 
20Dewatering1L.S.$15,000.00$15,000.00 $68,800.00$68,800.00 $200,000.00$200,000.00 
21Dock Abutment4Each$1,000.00$4,000.00 $2,400.00$9,600.00 $2,000.00$8,000.00 
22Engineering Fabric1900S.Y.$1.50$2,850.00 $3.00$5,700.00 $4.00$7,600.00 
23Flexamat962L.F.$76.50$73,593.00 $9.50$9,139.00 $60.00$57,720.00 
24Handicap Signs5Each$480.00$2,400.00 $325.00$1,625.00 $100.00$500.00 
25In-Lake Access1L.S.$10,000.00$10,000.00 $158,000.00$158,000.00 $5,000.00$5,000.00 
26M&D Testing1L.S.$5,000.00$5,000.00 $25,000.00$25,000.00 $10,000.00$10,000.00 
27Mobilization1L.S.$180,000.00$180,000.00 $137,785.00$137,785.00 $415,000.00$415,000.00 
28Mulch Sock7116L.F.$1.50$10,674.00 $1.75$12,453.00 $5.00$35,580.00 
29Parking Bumpers10Each$150.00$1,500.00 $500.00$5,000.00 $150.00$1,500.00 
30Pavement Removal1946S.Y.$20.00$38,920.00 $9.50$18,487.00 $6.00$11,676.00 
31Pavement Striping1584L.F.$3.50$5,544.00 $3.75$5,940.00 $1.00$1,584.00 
32Pedestrian Trail Bridge - 10' x 100'1Each$116,120.20$116,120.20 $97,000.00$97,000.00 $130,000.00$130,000.00 
33Porous Backfill - Pea Gravel - Labor Only240Tons$35.00$8,400.00 $13.15$3,156.00 $30.00$7,200.00 
34Precast Concrete Bridge Abutment System2Each$13,990.00$27,980.00 $11,000.00$22,000.00 $70,000.00$140,000.00 
35Seeding - Native Grass12Acres$3,500.00$42,000.00 $2,950.00$35,400.00 $2,000.00$24,000.00 
36Seeding - Stabilization Crop13.8Acres$3,000.00$41,400.00 $1,850.00$25,530.00 $1,500.00$20,700.00 
37Service Vehicle Sign1Each$350.00$350.00 $500.00$500.00 $150.00$150.00 
38Site Restoration1L.S.$10,000.00$10,000.00 $30,200.00$30,200.00 $5,000.00$5,000.00 
39Special Backfill1796Tons$28.80$51,724.80 $24.25$43,553.00 $40.00$71,840.00 
40Structural Concrete788S.Y.$80.00$63,040.00 $84.00$66,192.00 $63.00$49,644.00 
41Swale w/Intake and Tile1L.S.$3,500.00$3,500.00 $3,800.00$3,800.00 $2,000.00$2,000.00 
42Traffic Control1L.S.$3,950.00$3,950.00 $5,000.00$5,000.00 $5,000.00$5,000.00 
43Woody Debris Removal1L.S.$15,000.00$15,000.00 $8,500.00$8,500.00 $5,000.00$5,000.00 
      $2,443,330.27  $3,048,577.20  $3,240,219.00 
Alternate        
44Class 10 Excavation (Waste)42382C.Y.$10.00$423,820.00 $6.50$275,483.00 $9.00$381,438.00 
Alternate        
45Class 10 Excavation (Waste)11215C.Y.$10.00$112,150.00 $6.50$72,897.50 $9.00$100,935.00 
Alternate        
46Class A Crushed Stone362Tons$30.00$10,860.00 $23.50$8,507.00 $35.00$12,670.00 
Alternate        
4724" Dia CMP40L.F.$28.88$1,155.20 $50.00$2,000.00 $75.00$3,000.00 
Alternate        
48Class D Revetment15Tons$44.80$672.00 $66.75$1,001.25 $55.00$825.00 
Alternate        
49Engineering Fabric25S.Y.$1.50$37.50 $3.00$75.00 $4.00$100.00 
Alternate        
50Canoe Access1L.S.$2,000.00$2,000.00 $2,500.00$2,500.00 $2,000.00$2,000.00 
      $2,994,024.97  $3,411,040.95  $3,741,187.00 
 
4
5
6
Estimated Cost: $3,400,000.00
Contractor: 
Veit & Company, Inc.CJ Moyna and Sons, Inc.
Funding Source: 75% Lake Restoration, 25% Other, 14000 Veit Place
24412 Hwy 13

Rogers MN  55374Elkader IA  52043  
Plan Sets Requested: 9
Quantities
(763) 428-2242(563) 245-1442
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
124" Dia CMP418L.F.$44.50$18,601.00 $65.00$27,170.00 $0.00 
23/8" Minus Crushed Stone6Tons$88.50$531.00 $78.00$468.00 $0.00 
330" Dia CMP45L.F.$67.00$3,015.00 $100.00$4,500.00 $0.00 
436" Dia. CMP76L.F.$76.00$5,776.00 $108.00$8,208.00 $0.00 
55" PCC84S.Y.$129.00$10,836.00 $88.00$7,392.00 $0.00 
66" PCC4530S.Y.$59.00$267,270.00 $42.50$192,525.00 $0.00 
78" Dia CMP53L.F.$51.50$2,729.50 $80.00$4,240.00 $0.00 
8942 Draw Down2Each$96,700.00$193,400.00 $160,000.00$320,000.00 $0.00 
9Class 10 Excavation (Embankment)73279C.Y.$4.00$293,116.00 $9.40$688,822.60 $0.00 
10Class 10 Excavation (Waste)22586C.Y.$6.00$135,516.00 $10.60$239,411.60 $0.00 
11Class A Crushed Stone84Tons$38.00$3,192.00 $34.20$2,872.80 $0.00 
12Class D Revetment266Tons$79.00$21,014.00 $56.80$15,108.80 $0.00 
13Class D Revetment - Linear Mounds - Labor Only1300Tons$42.00$54,600.00 $36.80$47,840.00 $0.00 
14Class D Revetment - Salvaged Rock - Labor Only660Tons$16.00$10,560.00 $38.60$25,476.00 $0.00 
15Class E Revetment13688.6Tons$66.00$903,447.60 $48.50$663,897.10 $0.00 
16Clearing and Grubbing3.38Acres$9,700.00$32,786.00 $5,200.00$17,576.00 $0.00 
17Compaction with Moisture and Density Control29109C.Y.$2.50$72,772.50 $0.60$17,465.40 $0.00 
18Concrete Testing1L.S.$5,900.00$5,900.00 $7,500.00$7,500.00 $0.00 
19Construction Staking1L.S.$8,700.00$8,700.00 $60,000.00$60,000.00 $0.00 
20Dewatering1L.S.$50,000.00$50,000.00 $650,000.00$650,000.00 $0.00 
21Dock Abutment4Each$5,900.00$23,600.00 $3,200.00$12,800.00 $0.00 
22Engineering Fabric1900S.Y.$3.00$5,700.00 $4.50$8,550.00 $0.00 
23Flexamat962L.F.$120.00$115,440.00 $118.90$114,381.80 $0.00 
24Handicap Signs5Each$405.00$2,025.00 $300.00$1,500.00 $0.00 
25In-Lake Access1L.S.$35,000.00$35,000.00 $80,000.00$80,000.00 $0.00 
26M&D Testing1L.S.$9,300.00$9,300.00 $7,500.00$7,500.00 $0.00 
27Mobilization1L.S.$429,380.00$429,380.00 $1,800,000.00$1,800,000.00 $0.00 
28Mulch Sock7116L.F.$1.75$12,453.00 $2.50$17,790.00 $0.00 
29Parking Bumpers10Each$295.00$2,950.00 $1,500.00$15,000.00 $0.00 
30Pavement Removal1946S.Y.$6.00$11,676.00 $9.20$17,903.20 $0.00 
31Pavement Striping1584L.F.$1.50$2,376.00 $3.50$5,544.00 $0.00 
32Pedestrian Trail Bridge - 10' x 100'1Each$113,375.00$113,375.00 $125,000.00$125,000.00 $0.00 
33Porous Backfill - Pea Gravel - Labor Only240Tons$22.00$5,280.00 $68.80$16,512.00 $0.00 
34Precast Concrete Bridge Abutment System2Each$11,670.00$23,340.00 $17,500.00$35,000.00 $0.00 
35Seeding - Native Grass12Acres$3,305.00$39,660.00 $2,400.00$28,800.00 $0.00 
36Seeding - Stabilization Crop13.8Acres$2,050.00$28,290.00 $1,600.00$22,080.00 $0.00 
37Service Vehicle Sign1Each$580.00$580.00 $1,500.00$1,500.00 $0.00 
38Site Restoration1L.S.$14,340.00$14,340.00 $60,000.00$60,000.00 $0.00 
39Special Backfill1796Tons$31.00$55,676.00 $26.70$47,953.20 $0.00 
40Structural Concrete788S.Y.$166.00$130,808.00 $120.00$94,560.00 $0.00 
41Swale w/Intake and Tile1L.S.$4,500.00$4,500.00 $4,600.00$4,600.00 $0.00 
42Traffic Control1L.S.$1,737.00$1,737.00 $8,500.00$8,500.00 $0.00 
43Woody Debris Removal1L.S.$16,300.00$16,300.00 $17,500.00$17,500.00 $0.00 
Alternate        
44Class 10 Excavation (Waste)42382C.Y.$11.50$487,393.00 $10.50$445,011.00 $0.00 
Alternate        
45Class 10 Excavation (Waste)11215C.Y.$10.50$117,757.50 $12.90$144,673.50 $0.00 
Alternate        
46Class A Crushed Stone362Tons$36.00$13,032.00 $40.90$14,805.80 $0.00 
Alternate        
4724" Dia CMP40L.F.$55.50$2,220.00 $65.00$2,600.00 $0.00 
Alternate        
48Class D Revetment15Tons$115.00$1,725.00 $150.00$2,250.00 $0.00 
Alternate        
49Engineering Fabric25S.Y.$3.75$93.75 $15.00$375.00 $0.00 
Alternate        
50Canoe Access1L.S.$6,321.00$6,321.00 $15,000.00$15,000.00 $0.00 
      $3,806,090.85  $6,168,162.80  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Hendrickson Transportation, LLC, Hamburg, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.

5/21/2019