|
IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Maquoketa Caves State Park | Date: 11/16/2017 | Project No. |
| Roadway Reconstruction, Maintenance & Campground Electrical - Contract | County: | JACKSON | Time: 11:00 a.m. | 17-06-49-02 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $765,000.00 | Contractor: | Ricklefs Excavating Ltd | Eastern Iowa Excavating & Concrete LLC | Tschigffrie Excavating Co | |||||||||
| Funding Source: 80% Park & Institutional Road Fund, 20% Infrastructure 2017, | 12536 Buffalo Road | 121 Nixon St SE PO Box 189 | 425 Julian Dubuque Dr PO Box 3280 | ||||||||||
| Anamosa IA 52205 | Cascade IA 52033 | Dubuque IA 52003 | |||||||||||
| Plan Sets Requested: 0 | Quantities | 319-462-4435 | 563-852-5120 | 563-557-7450 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Clearing and Grubbing | 1 | L.S. | $40,000.00 | $40,000.00 | $28,000.00 | $28,000.00 | $6,000.00 | $6,000.00 | ||||
| 2 | Remove Existing Roadway Pavement | 4272 | S.Y. | $6.00 | $25,632.00 | $15.25 | $65,148.00 | $8.35 | $35,671.20 | ||||
| 3 | Remove Existing Paved Parking | 761 | S.Y. | $7.00 | $5,327.00 | $9.85 | $7,495.85 | $8.35 | $6,354.35 | ||||
| 4 | Roadway Pavement, PCC, 7" | 4915 | S.Y. | $34.00 | $167,110.00 | $33.75 | $165,881.25 | $40.10 | $197,091.50 | ||||
| 5 | Parking Lot, PCC, 7" | 587 | S.Y. | $34.00 | $19,958.00 | $33.75 | $19,811.25 | $45.40 | $26,649.80 | ||||
| 6 | Sidewalk, PCC, 5" | 469 | S.Y. | $35.00 | $16,415.00 | $35.50 | $16,649.50 | $33.30 | $15,617.70 | ||||
| 7 | Curb and Gutter, P.C. Concrete, 2.5 Ft., 6 Inch Standard Curb | 747.8 | L.F. | $16.00 | $11,964.80 | $16.50 | $12,338.70 | $18.00 | $13,460.40 | ||||
| 8 | Special Backfill | 1165 | C.Y. | $30.00 | $34,950.00 | $36.75 | $42,813.75 | $39.00 | $45,435.00 | ||||
| 9 | Class "A" Crushed Stone | 201.9 | Tons | $20.00 | $4,038.00 | $18.15 | $3,664.485 | $20.40 | $4,118.76 | ||||
| 10 | Painted Pavement Markings, Waterborne/Solvent - White | 29.3 | STA. | $100.00 | $2,930.00 | $55.00 | $1,611.50 | $100.00 | $2,930.00 | ||||
| 11 | Painted Pavement Markings, Waterborne/Solvent - Double Yellow Centerline | 1.9 | STA. | $100.00 | $190.00 | $110.00 | $209.00 | $100.00 | $190.00 | ||||
| 12 | Excavation, Class 10, Roadway and Borrow | 1717.1 | C.Y. | $16.00 | $27,473.60 | $6.50 | $11,161.15 | $10.00 | $17,171.00 | ||||
| 13 | Excavation, Class 10, Waste | 1544.4 | C.Y. | $11.00 | $16,988.40 | $6.50 | $10,038.60 | $10.00 | $15,444.00 | ||||
| 14 | Erosion Control | 7055 | L.F. | $2.00 | $14,110.00 | $3.00 | $21,165.00 | $4.10 | $28,925.50 | ||||
| 15 | Culvert, Concrete Roadway Pipe, 24 IN. DIA. | 144 | L.F. | $45.00 | $6,480.00 | $68.00 | $9,792.00 | $103.00 | $14,832.00 | ||||
| 16 | Revetment, Class E | 49 | Tons | $40.00 | $1,960.00 | $53.75 | $2,633.75 | $43.00 | $2,107.00 | ||||
| 17 | Intake, SW-512, 24 IN. | 1 | Each | $1,500.00 | $1,500.00 | $1,375.00 | $1,375.00 | $2,200.00 | $2,200.00 | ||||
| 18 | Intake, SW-501 | 1 | Each | $2,000.00 | $2,000.00 | $2,575.00 | $2,575.00 | $3,300.00 | $3,300.00 | ||||
| 19 | Intake, SW-505 | 1 | Each | $3,000.00 | $3,000.00 | $3,675.00 | $3,675.00 | $7,800.00 | $7,800.00 | ||||
| 20 | Aggregate, Cover - Sand | 148 | Tons | $45.00 | $6,660.00 | $108.00 | $15,984.00 | $109.00 | $16,132.00 | ||||
| 21 | Binder Bitumen, CRS-2P | 1954 | GAL. | $5.00 | $9,770.00 | $9.50 | $18,563.00 | $9.65 | $18,856.10 | ||||
| 22 | Patches, Full-Depth Finish, By Area | 6.7 | S.Y. | $75.00 | $502.50 | $124.25 | $832.475 | $51.00 | $341.70 | ||||
| 23 | Patches, Full-Depth Finish, By Count, 6-Inch PCC | 1 | Each | $750.00 | $750.00 | $550.00 | $550.00 | $445.00 | $445.00 | ||||
| 24 | Crack And Joint Cleaning And Filling (PCC Pavement) | 0.1 | MI. | $25,000.00 | $2,500.00 | $30,000.00 | $3,000.00 | $27,600.00 | $2,760.00 | ||||
| 25 | Sealer Material (PCC Pavement) | 100 | LB. | $2.50 | $250.00 | $2.95 | $295.00 | $2.75 | $275.00 | ||||
| 26 | Transverse Joint Repair | 6.6 | Tons | $400.00 | $2,640.00 | $880.00 | $5,808.00 | $827.00 | $5,458.20 | ||||
| 27 | Cleaning And Filling Cracks (Pavement Maintenance) | 1 | MI. | $5,000.00 | $5,000.00 | $6,500.00 | $6,500.00 | $6,100.00 | $6,100.00 | ||||
| 28 | Hot Mix Asphalt For Crack Filling (Maintenance)) | 1 | Tons | $600.00 | $600.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | ||||
| 29 | Filler Material (Maintenance) | 500 | GAL. | $4.50 | $2,250.00 | $5.35 | $2,675.00 | $4.95 | $2,475.00 | ||||
| 30 | Speed Hump, PCC | 4 | Each | $500.00 | $2,000.00 | $975.00 | $3,900.00 | $3,800.00 | $15,200.00 | ||||
| 31 | Rural Seeding, Fertilizing and Mulching | 2.1 | Acres | $3,000.00 | $6,300.00 | $3,750.00 | $7,875.00 | $4,100.00 | $8,610.00 | ||||
| 32 | Precast Concrete Parking Wheel Stops | 40 | Each | $100.00 | $4,000.00 | $80.00 | $3,200.00 | $220.00 | $8,800.00 | ||||
| 33 | Furnish and Install Light Fixture | 1 | Each | $900.00 | $900.00 | $520.00 | $520.00 | $3,500.00 | $3,500.00 | ||||
| 34 | Light Pole and Base, Complete | 1 | Each | $1,200.00 | $1,200.00 | $2,100.00 | $2,100.00 | $1,500.00 | $1,500.00 | ||||
| 35 | #6. AWG Grounding Conductor Cable, Type THW or USE | 234 | L.F. | $2.25 | $526.50 | $2.15 | $503.10 | $1.20 | $280.80 | ||||
| 36 | #4. AWG Grounding Conductor Cable, Type THW or USE | 2688 | L.F. | $2.50 | $6,720.00 | $2.45 | $6,585.60 | $1.55 | $4,166.40 | ||||
| 37 | #2. AWG Grounding Conductor Cable, Type THW or USE | 2187 | L.F. | $3.00 | $6,561.00 | $2.85 | $6,232.95 | $2.30 | $5,030.10 | ||||
| 38 | #1/0. AWG Single Conductor Cable, Type USE | 234 | L.F. | $13.00 | $3,042.00 | $4.20 | $982.80 | $3.80 | $889.20 | ||||
| 39 | #2/0. AWG Single Conductor Cable, Type USE | 696 | L.F. | $15.00 | $10,440.00 | $4.85 | $3,375.60 | $4.55 | $3,166.80 | ||||
| 40 | #3/0. AWG Single Conductor Cable, Type USE | 1992 | L.F. | $18.00 | $35,856.00 | $5.85 | $11,653.20 | $5.60 | $11,155.20 | ||||
| 41 | #4/0. AWG Single Conductor Cable, Type USE | 180 | L.F. | $20.00 | $3,600.00 | $6.50 | $1,170.00 | $6.35 | $1,143.00 | ||||
| 42 | 250. AWG Single Conductor Cable, Type USE | 1437 | L.F. | $21.00 | $30,177.00 | $6.80 | $9,771.60 | $6.85 | $9,843.45 | ||||
| 43 | 300. AWG Single Conductor Cable, Type USE | 570 | L.F. | $25.00 | $14,250.00 | $8.00 | $4,560.00 | $8.35 | $4,759.50 | ||||
| 44 | Pad-Mounted 400 AMP Distribution Panel & Connections, Complete | 1 | L.S. | $4,800.00 | $4,800.00 | $13,000.00 | $13,000.00 | $2,600.00 | $2,600.00 | ||||
| 45 | Single Campsite Outlet Post (Metallic Power Center) 50 AMP | 18 | Each | $300.00 | $5,400.00 | $330.00 | $5,940.00 | $1,000.00 | $18,000.00 | ||||
| 46 | Removal of Existing Roadway Pipe | 108 | L.F. | $12.00 | $1,296.00 | $12.25 | $1,323.00 | $9.00 | $972.00 | ||||
| 47 | Removal of Light Pole | 1 | Each | $600.00 | $600.00 | $450.00 | $450.00 | $500.00 | $500.00 | ||||
| 48 | Traffic Control | 1 | L.S. | $5,000.00 | $5,000.00 | $3,500.00 | $3,500.00 | $6,500.00 | $6,500.00 | ||||
| 49 | Mobilization | 1 | L.S. | $25,000.00 | $25,000.00 | $35,000.00 | $35,000.00 | $92,600.00 | $92,600.00 | ||||
| $600,617.80 | $603,889.11 | $699,357.66 | |||||||||||
| Alternate | |||||||||||||
| 50 | Single Campsite Outlet Post (Metallic Power Center) 50 AMP | 6 | Each | $400.00 | $2,400.00 | $384.00 | $2,304.00 | $1,000.00 | $6,000.00 | ||||
| Alternate | |||||||||||||
| 51 | Bore, Single Circuit Secondary | 60 | L.F. | $14.00 | $840.00 | $13.75 | $825.00 | $50.00 | $3,000.00 | ||||
| Alternate | |||||||||||||
| 52 | #2. AWG Grounding Conductor Cable, Type THW or USE | 1743 | L.F. | $3.00 | $5,229.00 | $2.95 | $5,141.85 | $2.30 | $4,008.90 | ||||
| Alternate | |||||||||||||
| 53 | #4/0. AWG Single Conductor Cable, Type USE | 1743 | L.F. | $6.00 | $10,458.00 | $6.35 | $11,068.05 | $6.35 | $11,068.05 | ||||
| $619,544.80 | $623,228.01 | $723,434.61 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $765,000.00 | Contractor: | Horsfield Construction Inc | |||||||||||
| Funding Source: 80% Park & Institutional Road Fund, 20% Infrastructure 2017, | 505 E Main St Box 305 | ||||||||||||
| Epworth IA 52045 | |||||||||||||
| Plan Sets Requested: 0 | Quantities | 563-876-3335 | |||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Clearing and Grubbing | 1 | L.S. | $35,000.00 | $35,000.00 | $0.00 | $0.00 | ||||||
| 2 | Remove Existing Roadway Pavement | 4272 | S.Y. | $11.75 | $50,196.00 | $0.00 | $0.00 | ||||||
| 3 | Remove Existing Paved Parking | 761 | S.Y. | $15.50 | $11,795.50 | $0.00 | $0.00 | ||||||
| 4 | Roadway Pavement, PCC, 7" | 4915 | S.Y. | $42.75 | $210,116.25 | $0.00 | $0.00 | ||||||
| 5 | Parking Lot, PCC, 7" | 587 | S.Y. | $45.00 | $26,415.00 | $0.00 | $0.00 | ||||||
| 6 | Sidewalk, PCC, 5" | 469 | S.Y. | $37.75 | $17,704.75 | $0.00 | $0.00 | ||||||
| 7 | Curb and Gutter, P.C. Concrete, 2.5 Ft., 6 Inch Standard Curb | 747.8 | L.F. | $25.00 | $18,695.00 | $0.00 | $0.00 | ||||||
| 8 | Special Backfill | 1165 | C.Y. | $42.25 | $49,221.25 | $0.00 | $0.00 | ||||||
| 9 | Class "A" Crushed Stone | 201.9 | Tons | $22.00 | $4,441.80 | $0.00 | $0.00 | ||||||
| 10 | Painted Pavement Markings, Waterborne/Solvent - White | 29.3 | STA. | $50.00 | $1,465.00 | $0.00 | $0.00 | ||||||
| 11 | Painted Pavement Markings, Waterborne/Solvent - Double Yellow Centerline | 1.9 | STA. | $100.00 | $190.00 | $0.00 | $0.00 | ||||||
| 12 | Excavation, Class 10, Roadway and Borrow | 1717.1 | C.Y. | $14.50 | $24,897.95 | $0.00 | $0.00 | ||||||
| 13 | Excavation, Class 10, Waste | 1544.4 | C.Y. | $20.75 | $32,046.30 | $0.00 | $0.00 | ||||||
| 14 | Erosion Control | 7055 | L.F. | $3.00 | $21,165.00 | $0.00 | $0.00 | ||||||
| 15 | Culvert, Concrete Roadway Pipe, 24 IN. DIA. | 144 | L.F. | $122.50 | $17,640.00 | $0.00 | $0.00 | ||||||
| 16 | Revetment, Class E | 49 | Tons | $82.00 | $4,018.00 | $0.00 | $0.00 | ||||||
| 17 | Intake, SW-512, 24 IN. | 1 | Each | $1,500.00 | $1,500.00 | $0.00 | $0.00 | ||||||
| 18 | Intake, SW-501 | 1 | Each | $2,400.00 | $2,400.00 | $0.00 | $0.00 | ||||||
| 19 | Intake, SW-505 | 1 | Each | $3,500.00 | $3,500.00 | $0.00 | $0.00 | ||||||
| 20 | Aggregate, Cover - Sand | 148 | Tons | $98.50 | $14,578.00 | $0.00 | $0.00 | ||||||
| 21 | Binder Bitumen, CRS-2P | 1954 | GAL. | $8.75 | $17,097.50 | $0.00 | $0.00 | ||||||
| 22 | Patches, Full-Depth Finish, By Area | 6.7 | S.Y. | $115.00 | $770.50 | $0.00 | $0.00 | ||||||
| 23 | Patches, Full-Depth Finish, By Count, 6-Inch PCC | 1 | Each | $400.00 | $400.00 | $0.00 | $0.00 | ||||||
| 24 | Crack And Joint Cleaning And Filling (PCC Pavement) | 0.1 | MI. | $25,000.00 | $2,500.00 | $0.00 | $0.00 | ||||||
| 25 | Sealer Material (PCC Pavement) | 100 | LB. | $2.50 | $250.00 | $0.00 | $0.00 | ||||||
| 26 | Transverse Joint Repair | 6.6 | Tons | $750.00 | $4,950.00 | $0.00 | $0.00 | ||||||
| 27 | Cleaning And Filling Cracks (Pavement Maintenance) | 1 | MI. | $5,500.00 | $5,500.00 | $0.00 | $0.00 | ||||||
| 28 | Hot Mix Asphalt For Crack Filling (Maintenance)) | 1 | Tons | $1,825.00 | $1,825.00 | $0.00 | $0.00 | ||||||
| 29 | Filler Material (Maintenance) | 500 | GAL. | $4.50 | $2,250.00 | $0.00 | $0.00 | ||||||
| 30 | Speed Hump, PCC | 4 | Each | $900.00 | $3,600.00 | $0.00 | $0.00 | ||||||
| 31 | Rural Seeding, Fertilizing and Mulching | 2.1 | Acres | $3,700.00 | $7,770.00 | $0.00 | $0.00 | ||||||
| 32 | Precast Concrete Parking Wheel Stops | 40 | Each | $145.00 | $5,800.00 | $0.00 | $0.00 | ||||||
| 33 | Furnish and Install Light Fixture | 1 | Each | $500.00 | $500.00 | $0.00 | $0.00 | ||||||
| 34 | Light Pole and Base, Complete | 1 | Each | $1,950.00 | $1,950.00 | $0.00 | $0.00 | ||||||
| 35 | #6. AWG Grounding Conductor Cable, Type THW or USE | 234 | L.F. | $2.00 | $468.00 | $0.00 | $0.00 | ||||||
| 36 | #4. AWG Grounding Conductor Cable, Type THW or USE | 2688 | L.F. | $2.25 | $6,048.00 | $0.00 | $0.00 | ||||||
| 37 | #2. AWG Grounding Conductor Cable, Type THW or USE | 2187 | L.F. | $2.75 | $6,014.25 | $0.00 | $0.00 | ||||||
| 38 | #1/0. AWG Single Conductor Cable, Type USE | 234 | L.F. | $4.00 | $936.00 | $0.00 | $0.00 | ||||||
| 39 | #2/0. AWG Single Conductor Cable, Type USE | 696 | L.F. | $4.50 | $3,132.00 | $0.00 | $0.00 | ||||||
| 40 | #3/0. AWG Single Conductor Cable, Type USE | 1992 | L.F. | $5.25 | $10,458.00 | $0.00 | $0.00 | ||||||
| 41 | #4/0. AWG Single Conductor Cable, Type USE | 180 | L.F. | $6.00 | $1,080.00 | $0.00 | $0.00 | ||||||
| 42 | 250. AWG Single Conductor Cable, Type USE | 1437 | L.F. | $6.50 | $9,340.50 | $0.00 | $0.00 | ||||||
| 43 | 300. AWG Single Conductor Cable, Type USE | 570 | L.F. | $7.50 | $4,275.00 | $0.00 | $0.00 | ||||||
| 44 | Pad-Mounted 400 AMP Distribution Panel & Connections, Complete | 1 | L.S. | $12,000.00 | $12,000.00 | $0.00 | $0.00 | ||||||
| 45 | Single Campsite Outlet Post (Metallic Power Center) 50 AMP | 18 | Each | $325.00 | $5,850.00 | $0.00 | $0.00 | ||||||
| 46 | Removal of Existing Roadway Pipe | 108 | L.F. | $11.00 | $1,188.00 | $0.00 | $0.00 | ||||||
| 47 | Removal of Light Pole | 1 | Each | $500.00 | $500.00 | $0.00 | $0.00 | ||||||
| 48 | Traffic Control | 1 | L.S. | $10,750.00 | $10,750.00 | $0.00 | $0.00 | ||||||
| 49 | Mobilization | 1 | L.S. | $50,000.00 | $50,000.00 | $0.00 | $0.00 | ||||||
| Alternate | |||||||||||||
| 50 | Single Campsite Outlet Post (Metallic Power Center) 50 AMP | 6 | Each | $350.00 | $2,100.00 | $0.00 | $0.00 | ||||||
| Alternate | |||||||||||||
| 51 | Bore, Single Circuit Secondary | 60 | L.F. | $12.50 | $750.00 | $0.00 | $0.00 | ||||||
| Alternate | |||||||||||||
| 52 | #2. AWG Grounding Conductor Cable, Type THW or USE | 1743 | L.F. | $3.12 | $5,438.16 | $0.00 | $0.00 | ||||||
| Alternate | |||||||||||||
| 53 | #4/0. AWG Single Conductor Cable, Type USE | 1743 | L.F. | $6.78 | $11,817.54 | $0.00 | $0.00 | ||||||
| $744,294.25 | $0.00 | $0.00 | |||||||||||
12/17/2025