IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Artesian Lake WMA  Date: 11/7/2019  Project No.  
  Water Control Structure Replacement  County:   CARROLL  Time: 3:00 pm  18-02-14-01

 

 
1
2
3
Estimated Cost: $30,000.00
Contractor: 
M & S Dirt WorkRichards Construction Co., Inc.
Funding Source: 100% REAP OS Acquisition & Development, 10742 Ivy Ave
2721 Sierra Ave

Breda IA  51436Sac City IA  50583  
Plan Sets Requested: 0
Quantities
71279023247126624421
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$1,000.00$1,000.00 $5,000.00$5,000.00 $0.00 
218" Dual Wall Polypropylene Pipe50L.F.$30.00$1,500.00 $50.00$2,500.00 $0.00 
318" Dual Wall Polypropylene Perforated Inlet Pipe17L.F.$17.65$300.05 $150.00$2,550.00 $0.00 
46' Inline Water Control Structure1Each$2,500.00$2,500.00 $4,200.00$4,200.00 $0.00 
56' X 6' Anti Seep Collars3Each$300.00$900.00 $500.00$1,500.00 $0.00 
6Fire Protection Cover1Each$1,800.00$1,800.00 $2,400.00$2,400.00 $0.00 
7Erosion Stone318Tons$48.00$15,264.00 $35.00$11,130.00 $0.00 
818" CMP10L.F.$60.00$600.00 $65.00$650.00 $0.00 
9Rodent Guard1Each$70.00$70.00 $150.00$150.00 $0.00 
10Excavation1L.S.$3,500.00$3,500.00 $3,000.00$3,000.00 $0.00 
11Imported Clay Fill45C.Y.$30.00$1,350.00 $40.00$1,800.00 $0.00 
12Structure Demolition1L.S.$3,500.00$3,500.00 $4,000.00$4,000.00 $0.00 
13Site Restoration1L.S.$1,200.00$1,200.00 $1,000.00$1,000.00 $0.00 
      $33,484.05  $39,880.00  $0.00 
 



 

5/4/2024