IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | West Lake Complex | Date: 11/15/2018 | Project No. |
| Watershed Improvements | County: | SCOTT | Time: 11:00 a.m. | 17-06-82-01 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $620,000.00 | Contractor: | H & H Construction & Development LLC | Ardo Schmidt Const. Inc. | Customized Environmental Solutions | |||||||||
| Funding Source: 100% Lake Restoration, | 60559 Hwy 64 | 35010 Hwy 64 | 2045 Grand Ave, Ste A | ||||||||||
| Sabula IA 52070 | Preston IA 52069 | West Des Moines IA 50265 | |||||||||||
| Plan Sets Requested: 19 | Quantities | 5633571849 | (563) 689-4875 | (515) 587-5809 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $65,000.00 | $65,000.00 | $42,000.00 | $42,000.00 | $46,000.00 | $46,000.00 | ||||
| 2 | Clearing and Grubbing | 1 | L.S. | $50,000.00 | $50,000.00 | $85,000.00 | $85,000.00 | $15,500.00 | $15,500.00 | ||||
| 3 | Handling of Water | 1 | L.S. | $7,500.00 | $7,500.00 | $6,000.00 | $6,000.00 | $12,000.00 | $12,000.00 | ||||
| 4 | Erosion Control (SWPPP) | 1 | L.S. | $5,000.00 | $5,000.00 | $23,600.00 | $23,600.00 | $25,500.00 | $25,500.00 | ||||
| 5 | Seeding - Grass Seed Mix | 5.4 | Acres | $2,000.00 | $10,800.00 | $1,500.00 | $8,100.00 | $1,200.00 | $6,480.00 | ||||
| 6 | Earthen Embankment | 32709 | C.Y. | $2.25 | $73,595.25 | $2.50 | $81,772.50 | $2.50 | $81,772.50 | ||||
| 7 | Excavation | 13961 | C.Y. | $3.50 | $48,863.50 | $2.00 | $27,922.00 | $2.50 | $34,902.50 | ||||
| 8 | 24" HDPE Pipe | 561 | L.F. | $65.00 | $36,465.00 | $81.33 | $45,626.13 | $151.51 | $84,997.11 | ||||
| 9 | 24" Flared End Section | 4 | Each | $275.00 | $1,100.00 | $400.00 | $1,600.00 | $625.00 | $2,500.00 | ||||
| 10 | Unformed Concrete | 38 | C.Y. | $160.00 | $6,080.00 | $200.00 | $7,600.00 | $200.00 | $7,600.00 | ||||
| 11 | Class "C" Rock Riprap | 852 | Tons | $32.50 | $27,690.00 | $39.50 | $33,654.00 | $45.00 | $38,340.00 | ||||
| 12 | Class "E" Rock Riprap | 41 | Tons | $35.00 | $1,435.00 | $39.00 | $1,599.00 | $55.00 | $2,255.00 | ||||
| 13 | Formed Concrete | 36 | C.Y. | $600.00 | $21,600.00 | $500.00 | $18,000.00 | $500.00 | $18,000.00 | ||||
| 14 | Steel Reinforcement | 3866 | LB. | $1.25 | $4,832.50 | $3.00 | $11,598.00 | $5.00 | $19,330.00 | ||||
| 15 | Metal Fabrication | 50 | L.F. | $212.00 | $10,600.00 | $300.00 | $15,000.00 | $150.00 | $7,500.00 | ||||
| 16 | Erosion Control Matting | 13991 | S.Y. | $3.25 | $45,470.75 | $1.75 | $24,484.25 | $1.99 | $27,842.09 | ||||
| 17 | Existing Pipe Removal | 160 | L.F. | $10.50 | $1,680.00 | $10.00 | $1,600.00 | $20.00 | $3,200.00 | ||||
| 18 | Excavation | 141 | C.Y. | $10.00 | $1,410.00 | $10.00 | $1,410.00 | $3.50 | $493.50 | ||||
| 19 | Class "E" Rock Riprap | 50 | Tons | $40.00 | $2,000.00 | $39.00 | $1,950.00 | $55.00 | $2,750.00 | ||||
| 20 | Formed Concrete | 0.83 | C.Y. | $1,200.00 | $996.00 | $500.00 | $415.00 | $500.00 | $415.00 | ||||
| 21 | Steel Reinforcement | 57.3 | LB. | $10.00 | $573.00 | $3.00 | $171.90 | $20.00 | $1,146.00 | ||||
| 22 | Turf Reinforcement Mat | 235 | S.F. | $3.25 | $763.75 | $3.00 | $705.00 | $5.00 | $1,175.00 | ||||
| 23 | Cobbles | 2 | C.Y. | $200.00 | $400.00 | $150.00 | $300.00 | $412.50 | $825.00 | ||||
| 24 | Erosion Control Matting | 263 | S.Y. | $4.00 | $1,052.00 | $3.00 | $789.00 | $1.99 | $523.37 | ||||
| 25 | Amended Soils | 5 | C.Y. | $100.00 | $500.00 | $100.00 | $500.00 | $50.00 | $250.00 | ||||
| 26 | Sand | 7 | C.Y. | $100.00 | $700.00 | $10.00 | $70.00 | $268.30 | $1,878.10 | ||||
| 27 | 6" Slotted Wall PVC Pipe with Sock | 45 | L.F. | $15.00 | $675.00 | $25.00 | $1,125.00 | $7.58 | $341.10 | ||||
| 28 | 6" Solid Wall PVC Pipe | 61 | L.F. | $9.00 | $549.00 | $25.00 | $1,525.00 | $53.30 | $3,251.30 | ||||
| 29 | Asphalt Repairs | 7 | S.Y. | $200.00 | $1,400.00 | $140.00 | $980.00 | $1,500.00 | $10,500.00 | ||||
| 30 | Plugs - Bioswale Bed Mix | 400 | Each | $8.00 | $3,200.00 | $10.00 | $4,000.00 | $12.50 | $5,000.00 | ||||
| 31 | Seeding - Bioswale Slope Mix | 2366 | S.F. | $1.26 | $2,981.16 | $1.00 | $2,366.00 | $2.00 | $4,732.00 | ||||
| 32 | Excavation | 5796 | C.Y. | $3.25 | $18,837.00 | $3.13 | $18,141.48 | $2.50 | $14,490.00 | ||||
| 33 | Class "E" Rock Riprap | 265 | Tons | $35.00 | $9,275.00 | $39.00 | $10,335.00 | $55.00 | $14,575.00 | ||||
| 34 | Erosion Control Matting | 33000 | S.Y. | $1.80 | $59,400.00 | $1.50 | $49,500.00 | $1.99 | $65,670.00 | ||||
| 35 | Seeding - Grass Seed Mix | 7.3 | Acres | $1,500.00 | $10,950.00 | $1,500.00 | $10,950.00 | $1,400.00 | $10,220.00 | ||||
| 36 | Seeding - Floodplain Mix | 1.2 | Acres | $2,100.00 | $2,520.00 | $2,000.00 | $2,400.00 | $1,400.00 | $1,680.00 | ||||
| $535,893.91 | $542,789.26 | $573,634.57 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $620,000.00 | Contractor: | Langman Construction Inc. | Engelbrecht Farms Inc | BWC Excavating, LC | |||||||||
| Funding Source: 100% Lake Restoration, | 220 34th Ave | 22870 130th Ave | 1303 Hickory Hollow Rd | ||||||||||
| Rock Island IL 61201 | Davenport IA 52806 | Solon IA 52333 | |||||||||||
| Plan Sets Requested: 19 | Quantities | (309) 786-8944 | (563) 285-8281 | (319) 848-7513 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $95,000.00 | $95,000.00 | $49,679.19 | $49,679.19 | $80,000.00 | $80,000.00 | ||||
| 2 | Clearing and Grubbing | 1 | L.S. | $45,000.00 | $45,000.00 | $31,095.42 | $31,095.42 | $20,000.00 | $20,000.00 | ||||
| 3 | Handling of Water | 1 | L.S. | $0.01 | $0.01 | $16,275.47 | $16,275.47 | $10,000.00 | $10,000.00 | ||||
| 4 | Erosion Control (SWPPP) | 1 | L.S. | $3,000.00 | $3,000.00 | $18,342.04 | $18,342.04 | $15,000.00 | $15,000.00 | ||||
| 5 | Seeding - Grass Seed Mix | 5.4 | Acres | $2,000.00 | $10,800.00 | $1,865.12 | $10,071.648 | $2,250.00 | $12,150.00 | ||||
| 6 | Earthen Embankment | 32709 | C.Y. | $4.00 | $130,836.00 | $5.51 | $180,226.59 | $4.50 | $147,190.50 | ||||
| 7 | Excavation | 13961 | C.Y. | $4.00 | $55,844.00 | $5.51 | $76,925.11 | $4.50 | $62,824.50 | ||||
| 8 | 24" HDPE Pipe | 561 | L.F. | $90.00 | $50,490.00 | $40.62 | $22,787.82 | $105.00 | $58,905.00 | ||||
| 9 | 24" Flared End Section | 4 | Each | $800.00 | $3,200.00 | $508.16 | $2,032.64 | $1,500.00 | $6,000.00 | ||||
| 10 | Unformed Concrete | 38 | C.Y. | $140.00 | $5,320.00 | $365.34 | $13,882.92 | $250.00 | $9,500.00 | ||||
| 11 | Class "C" Rock Riprap | 852 | Tons | $54.00 | $46,008.00 | $69.82 | $59,486.64 | $45.00 | $38,340.00 | ||||
| 12 | Class "E" Rock Riprap | 41 | Tons | $54.00 | $2,214.00 | $69.82 | $2,862.62 | $80.00 | $3,280.00 | ||||
| 13 | Formed Concrete | 36 | C.Y. | $835.00 | $30,060.00 | $772.65 | $27,815.40 | $600.00 | $21,600.00 | ||||
| 14 | Steel Reinforcement | 3866 | LB. | $2.00 | $7,732.00 | $1.09 | $4,213.94 | $4.00 | $15,464.00 | ||||
| 15 | Metal Fabrication | 50 | L.F. | $100.00 | $5,000.00 | $175.39 | $8,769.50 | $100.00 | $5,000.00 | ||||
| 16 | Erosion Control Matting | 13991 | S.Y. | $0.75 | $10,493.25 | $1.25 | $17,488.75 | $2.00 | $27,982.00 | ||||
| 17 | Existing Pipe Removal | 160 | L.F. | $10.00 | $1,600.00 | $26.77 | $4,283.20 | $10.00 | $1,600.00 | ||||
| 18 | Excavation | 141 | C.Y. | $10.00 | $1,410.00 | $5.51 | $776.91 | $30.00 | $4,230.00 | ||||
| 19 | Class "E" Rock Riprap | 50 | Tons | $54.00 | $2,700.00 | $69.82 | $3,491.00 | $50.00 | $2,500.00 | ||||
| 20 | Formed Concrete | 0.83 | C.Y. | $1,500.00 | $1,245.00 | $6,414.94 | $5,324.40 | $20,000.00 | $16,600.00 | ||||
| 21 | Steel Reinforcement | 57.3 | LB. | $5.00 | $286.50 | $1.09 | $62.457 | $10.00 | $573.00 | ||||
| 22 | Turf Reinforcement Mat | 235 | S.F. | $1.00 | $235.00 | $1.25 | $293.75 | $4.00 | $940.00 | ||||
| 23 | Cobbles | 2 | C.Y. | $100.00 | $200.00 | $69.82 | $139.64 | $2,000.00 | $4,000.00 | ||||
| 24 | Erosion Control Matting | 263 | S.Y. | $1.00 | $263.00 | $1.25 | $328.75 | $3.25 | $854.75 | ||||
| 25 | Amended Soils | 5 | C.Y. | $150.00 | $750.00 | $48.65 | $243.25 | $500.00 | $2,500.00 | ||||
| 26 | Sand | 7 | C.Y. | $60.00 | $420.00 | $15.29 | $107.03 | $500.00 | $3,500.00 | ||||
| 27 | 6" Slotted Wall PVC Pipe with Sock | 45 | L.F. | $15.00 | $675.00 | $8.49 | $382.05 | $30.00 | $1,350.00 | ||||
| 28 | 6" Solid Wall PVC Pipe | 61 | L.F. | $15.00 | $915.00 | $8.49 | $517.89 | $30.00 | $1,830.00 | ||||
| 29 | Asphalt Repairs | 7 | S.Y. | $80.00 | $560.00 | $189.52 | $1,326.64 | $250.00 | $1,750.00 | ||||
| 30 | Plugs - Bioswale Bed Mix | 400 | Each | $6.00 | $2,400.00 | $4.96 | $1,984.00 | $20.00 | $8,000.00 | ||||
| 31 | Seeding - Bioswale Slope Mix | 2366 | S.F. | $0.30 | $709.80 | $0.40 | $946.40 | $1.25 | $2,957.50 | ||||
| 32 | Excavation | 5796 | C.Y. | $4.00 | $23,184.00 | $5.50 | $31,878.00 | $15.00 | $86,940.00 | ||||
| 33 | Class "E" Rock Riprap | 265 | Tons | $54.00 | $14,310.00 | $69.82 | $18,502.30 | $50.00 | $13,250.00 | ||||
| 34 | Erosion Control Matting | 33000 | S.Y. | $0.75 | $24,750.00 | $1.25 | $41,250.00 | $2.00 | $66,000.00 | ||||
| 35 | Seeding - Grass Seed Mix | 7.3 | Acres | $2,000.00 | $14,600.00 | $1,865.12 | $13,615.376 | $1,500.00 | $10,950.00 | ||||
| 36 | Seeding - Floodplain Mix | 1.2 | Acres | $3,000.00 | $3,600.00 | $1,865.12 | $2,238.144 | $2,000.00 | $2,400.00 | ||||
| $595,810.56 | $669,646.885 | $765,961.25 | |||||||||||
7 | 8 | 9 | |||||||||||
| Estimated Cost: $620,000.00 | Contractor: | McCarthy Improvement Company | Triple B Construction | ||||||||||
| Funding Source: 100% Lake Restoration, | 5401 Victoria Ave | 710 Ayres Progress Dr | |||||||||||
| Davenport IA 52807 | Wilton IA 52778 | ||||||||||||
| Plan Sets Requested: 19 | Quantities | (563) 359-0321 | (563) 732-3478 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $147,000.00 | $147,000.00 | $80,000.00 | $80,000.00 | $0.00 | |||||
| 2 | Clearing and Grubbing | 1 | L.S. | $100,000.00 | $100,000.00 | $49,500.00 | $49,500.00 | $0.00 | |||||
| 3 | Handling of Water | 1 | L.S. | $82,000.00 | $82,000.00 | $30,500.00 | $30,500.00 | $0.00 | |||||
| 4 | Erosion Control (SWPPP) | 1 | L.S. | $6,000.00 | $6,000.00 | $15,000.00 | $15,000.00 | $0.00 | |||||
| 5 | Seeding - Grass Seed Mix | 5.4 | Acres | $800.00 | $4,320.00 | $1,500.00 | $8,100.00 | $0.00 | |||||
| 6 | Earthen Embankment | 32709 | C.Y. | $11.15 | $364,705.35 | $4.00 | $130,836.00 | $0.00 | |||||
| 7 | Excavation | 13961 | C.Y. | $18.00 | $251,298.00 | $3.50 | $48,863.50 | $0.00 | |||||
| 8 | 24" HDPE Pipe | 561 | L.F. | $100.00 | $56,100.00 | $80.00 | $44,880.00 | $0.00 | |||||
| 9 | 24" Flared End Section | 4 | Each | $900.00 | $3,600.00 | $700.00 | $2,800.00 | $0.00 | |||||
| 10 | Unformed Concrete | 38 | C.Y. | $400.00 | $15,200.00 | $250.00 | $9,500.00 | $0.00 | |||||
| 11 | Class "C" Rock Riprap | 852 | Tons | $65.00 | $55,380.00 | $50.00 | $42,600.00 | $0.00 | |||||
| 12 | Class "E" Rock Riprap | 41 | Tons | $94.00 | $3,854.00 | $50.00 | $2,050.00 | $0.00 | |||||
| 13 | Formed Concrete | 36 | C.Y. | $1,500.00 | $54,000.00 | $500.00 | $18,000.00 | $0.00 | |||||
| 14 | Steel Reinforcement | 3866 | LB. | $4.00 | $15,464.00 | $1.00 | $3,866.00 | $0.00 | |||||
| 15 | Metal Fabrication | 50 | L.F. | $1.00 | $50.00 | $17,500.00 | $875,000.00 | $0.00 | |||||
| 16 | Erosion Control Matting | 13991 | S.Y. | $1.00 | $13,991.00 | $1.75 | $24,484.25 | $0.00 | |||||
| 17 | Existing Pipe Removal | 160 | L.F. | $20.00 | $3,200.00 | $20.00 | $3,200.00 | $0.00 | |||||
| 18 | Excavation | 141 | C.Y. | $35.00 | $4,935.00 | $15.00 | $2,115.00 | $0.00 | |||||
| 19 | Class "E" Rock Riprap | 50 | Tons | $85.00 | $4,250.00 | $46.00 | $2,300.00 | $0.00 | |||||
| 20 | Formed Concrete | 0.83 | C.Y. | $4,000.00 | $3,320.00 | $3,200.00 | $2,656.00 | $0.00 | |||||
| 21 | Steel Reinforcement | 57.3 | LB. | $4.00 | $229.20 | $1.00 | $57.30 | $0.00 | |||||
| 22 | Turf Reinforcement Mat | 235 | S.F. | $0.50 | $117.50 | $3.00 | $705.00 | $0.00 | |||||
| 23 | Cobbles | 2 | C.Y. | $5.00 | $10.00 | $100.00 | $200.00 | $0.00 | |||||
| 24 | Erosion Control Matting | 263 | S.Y. | $5.00 | $1,315.00 | $3.00 | $789.00 | $0.00 | |||||
| 25 | Amended Soils | 5 | C.Y. | $200.00 | $1,000.00 | $100.00 | $500.00 | $0.00 | |||||
| 26 | Sand | 7 | C.Y. | $100.00 | $700.00 | $40.00 | $280.00 | $0.00 | |||||
| 27 | 6" Slotted Wall PVC Pipe with Sock | 45 | L.F. | $15.00 | $675.00 | $30.00 | $1,350.00 | $0.00 | |||||
| 28 | 6" Solid Wall PVC Pipe | 61 | L.F. | $15.00 | $915.00 | $25.00 | $1,525.00 | $0.00 | |||||
| 29 | Asphalt Repairs | 7 | S.Y. | $1,000.00 | $7,000.00 | $200.00 | $1,400.00 | $0.00 | |||||
| 30 | Plugs - Bioswale Bed Mix | 400 | Each | $4.00 | $1,600.00 | $10.00 | $4,000.00 | $0.00 | |||||
| 31 | Seeding - Bioswale Slope Mix | 2366 | S.F. | $0.35 | $828.10 | $1.00 | $2,366.00 | $0.00 | |||||
| 32 | Excavation | 5796 | C.Y. | $7.00 | $40,572.00 | $4.50 | $26,082.00 | $0.00 | |||||
| 33 | Class "E" Rock Riprap | 265 | Tons | $63.00 | $16,695.00 | $50.00 | $13,250.00 | $0.00 | |||||
| 34 | Erosion Control Matting | 33000 | S.Y. | $1.00 | $33,000.00 | $1.50 | $49,500.00 | $0.00 | |||||
| 35 | Seeding - Grass Seed Mix | 7.3 | Acres | $800.00 | $5,840.00 | $1,500.00 | $10,950.00 | $0.00 | |||||
| 36 | Seeding - Floodplain Mix | 1.2 | Acres | $1,000.00 | $1,200.00 | $2,000.00 | $2,400.00 | $0.00 | |||||
| $1,300,364.15 | $1,511,605.05 | $0.00 | |||||||||||
Langman Construction Inc., Rock Island , IL
12/21/2025