IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Ledges  Date: 3/22/2018  Project No.  
  Road Repair  County:   BOONE  Time: 11:00 a.m.  17-02-08-03

 

 
1
2
3
Estimated Cost: $575,000.00
Contractor: 
Richards Construction Co., Inc.TK Concrete, Inc.Shekar Engineering
Funding Source: 100% Park & Institutional Road Fund, 2721 Sierra Ave
1608 Fifield Rd
2600 MLK Jr Pkwy #200
Sac City IA  50583Pe IA  50219Des Moines IA  50310
Plan Sets Requested: 4
Quantities
712-662-4421641-628-4590515-334-5062
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION & DEMOBILIZATION1L.S.$15,000.00$15,000.00 $29,000.00$29,000.00 $19,000.00$19,000.00 
2TRAFFIC CONTROL1L.S.$1,000.00$1,000.00 $3,000.00$3,000.00 $2,000.00$2,000.00 
3SITE PREP & CLEARING1L.S.$25,000.00$25,000.00 $25,000.00$25,000.00 $20,000.00$20,000.00 
4CULVERT REMOVAL & DISPOSAL3Each$200.00$600.00 $500.00$1,500.00 $1,250.00$3,750.00 
5CULVERT PLUGGING1Each$250.00$250.00 $850.00$850.00 $1,800.00$1,800.00 
6DITCH GRADING420L.F.$3.00$1,260.00 $18.00$7,560.00 $16.00$6,720.00 
7EXCAVATION2350C.Y.$9.25$21,737.50 $13.00$30,550.00 $7.50$17,625.00 
8TOPSOIL IMPORT65C.Y.$25.00$1,625.00 $50.00$3,250.00 $75.00$4,875.00 
9HMA REMOVAL & DISPOSAL462S.Y.$8.00$3,696.00 $10.00$4,620.00 $9.00$4,158.00 
10PCC PAVEMENT (7")462S.Y.$38.00$17,556.00 $45.00$20,790.00 $55.00$25,410.00 
11POROUS BACKFILL360Tons$38.00$13,680.00 $30.00$10,800.00 $40.00$14,400.00 
12CLASS A ROADSTONE340Tons$29.00$9,860.00 $27.50$9,350.00 $39.05$13,277.00 
13CLASS E REVETMENT (BANK STABILIZATION)370Tons$53.00$19,610.00 $55.00$20,350.00 $56.75$20,997.50 
14CLASS E REVETMENT (CHECK DAM)120Tons$58.00$6,960.00 $55.00$6,600.00 $56.75$6,810.00 
15SHOT ROCK (BENCH BACKFILL)3870Tons$37.00$143,190.00 $36.00$139,320.00 $48.75$188,662.50 
16CLASS E REVETMENT (PIPE OUTLET)8Tons$50.00$400.00 $55.00$440.00 $56.75$454.00 
17SUBDRAIN, PERFORATED, DUAL WALL HDPE, 6"450L.F.$16.00$7,200.00 $12.00$5,400.00 $15.00$6,750.00 
18STORM SEWER, NON-PERFORATED, DUAL WALL HDPE, 18"305L.F.$65.00$19,825.00 $28.00$8,540.00 $45.00$13,725.00 
19INTAKE, SW-512, 30"5Each$1,300.00$6,500.00 $3,000.00$15,000.00 $1,250.00$6,250.00 
20ANTI-SEEPAGE COLLAR3Each$400.00$1,200.00 $400.00$1,200.00 $100.00$300.00 
21SEEDING, DITCH MIX0.3Acres$6,900.00$2,070.00 $10,000.00$3,000.00 $2,000.00$600.00 
22EROSION CONTROL, 8" WATTLES460L.F.$2.50$1,150.00 $3.00$1,380.00 $5.00$2,300.00 
      $319,369.50  $347,500.00  $379,864.00 
 
4
5
6
Estimated Cost: $575,000.00
Contractor: 
MPS Engineers, PC dba Kingston Services, PCGehrke Inc.Hendrickson Transportation, LLC
Funding Source: 100% Park & Institutional Road Fund, 1444 Illinois St
1405 21st Ave
2762 310th St
Des Moines IA  50314Eldora IA  50627Hamburg IA  51640
Plan Sets Requested: 4
Quantities
515-221-9832641-858-3821712-382-1505
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION & DEMOBILIZATION1L.S.$28,700.00$28,700.00 $58,500.00$58,500.00 $69,000.00$69,000.00 
2TRAFFIC CONTROL1L.S.$2,850.00$2,850.00 $4,000.00$4,000.00 $3,500.00$3,500.00 
3SITE PREP & CLEARING1L.S.$19,500.00$19,500.00 $36,800.00$36,800.00 $23,100.00$23,100.00 
4CULVERT REMOVAL & DISPOSAL3Each$935.00$2,805.00 $545.00$1,635.00 $2,000.00$6,000.00 
5CULVERT PLUGGING1Each$1,210.00$1,210.00 $300.00$300.00 $500.00$500.00 
6DITCH GRADING420L.F.$18.00$7,560.00 $8.00$3,360.00 $2.50$1,050.00 
7EXCAVATION2350C.Y.$12.00$28,200.00 $20.00$47,000.00 $10.00$23,500.00 
8TOPSOIL IMPORT65C.Y.$56.00$3,640.00 $95.40$6,201.00 $10.00$650.00 
9HMA REMOVAL & DISPOSAL462S.Y.$8.00$3,696.00 $7.00$3,234.00 $16.00$7,392.00 
10PCC PAVEMENT (7")462S.Y.$46.00$21,252.00 $80.00$36,960.00 $130.00$60,060.00 
11POROUS BACKFILL360Tons$34.00$12,240.00 $37.45$13,482.00 $40.00$14,400.00 
12CLASS A ROADSTONE340Tons$33.00$11,220.00 $32.25$10,965.00 $40.00$13,600.00 
13CLASS E REVETMENT (BANK STABILIZATION)370Tons$58.60$21,682.00 $54.50$20,165.00 $55.00$20,350.00 
14CLASS E REVETMENT (CHECK DAM)120Tons$60.85$7,302.00 $70.00$8,400.00 $55.00$6,600.00 
15SHOT ROCK (BENCH BACKFILL)3870Tons$48.85$189,049.50 $38.00$147,060.00 $45.00$174,150.00 
16CLASS E REVETMENT (PIPE OUTLET)8Tons$60.85$486.80 $69.50$556.00 $55.00$440.00 
17SUBDRAIN, PERFORATED, DUAL WALL HDPE, 6"450L.F.$38.00$17,100.00 $19.00$8,550.00 $12.00$5,400.00 
18STORM SEWER, NON-PERFORATED, DUAL WALL HDPE, 18"305L.F.$64.00$19,520.00 $48.00$14,640.00 $20.00$6,100.00 
19INTAKE, SW-512, 30"5Each$3,800.00$19,000.00 $2,500.00$12,500.00 $2,000.00$10,000.00 
20ANTI-SEEPAGE COLLAR3Each$1,250.00$3,750.00 $500.00$1,500.00 $250.00$750.00 
21SEEDING, DITCH MIX0.3Acres$10,000.00$3,000.00 $6,500.00$1,950.00 $3,000.00$900.00 
22EROSION CONTROL, 8" WATTLES460L.F.$2.25$1,035.00 $5.00$2,300.00 $5.00$2,300.00 
      $424,798.30  $440,058.00  $449,742.00 
 
7
8
9
Estimated Cost: $575,000.00
Contractor: 
H & H Construction & Development LLCCon-Struct, Inc.Absolute Concrete Construction, Inc.
Funding Source: 100% Park & Institutional Road Fund, 60559 Hwy 64
305 S Dayton Ave
505 1st Ave N
PO Box 148
Sabula IA  52070Ames IA  50010Slater IA  50244
Plan Sets Requested: 4
Quantities
563-357-1849515-232-6443515-228-3030
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION & DEMOBILIZATION1L.S.$53,000.00$53,000.00 $18,500.00$18,500.00 $20,000.00$20,000.00 
2TRAFFIC CONTROL1L.S.$10,000.00$10,000.00 $2,585.00$2,585.00 $2,500.00$2,500.00 
3SITE PREP & CLEARING1L.S.$20,000.00$20,000.00 $60,000.00$60,000.00 $15,500.00$15,500.00 
4CULVERT REMOVAL & DISPOSAL3Each$3,300.00$9,900.00 $500.00$1,500.00 $2,100.00$6,300.00 
5CULVERT PLUGGING1Each$500.00$500.00 $500.00$500.00 $2,000.00$2,000.00 
6DITCH GRADING420L.F.$11.50$4,830.00 $10.00$4,200.00 $24.00$10,080.00 
7EXCAVATION2350C.Y.$14.80$34,780.00 $25.00$58,750.00 $25.00$58,750.00 
8TOPSOIL IMPORT65C.Y.$100.00$6,500.00 $50.00$3,250.00 $85.00$5,525.00 
9HMA REMOVAL & DISPOSAL462S.Y.$18.00$8,316.00 $10.00$4,620.00 $20.00$9,240.00 
10PCC PAVEMENT (7")462S.Y.$190.00$87,780.00 $80.00$36,960.00 $85.00$39,270.00 
11POROUS BACKFILL360Tons$30.00$10,800.00 $33.00$11,880.00 $55.00$19,800.00 
12CLASS A ROADSTONE340Tons$27.50$9,350.00 $33.00$11,220.00 $55.00$18,700.00 
13CLASS E REVETMENT (BANK STABILIZATION)370Tons$49.00$18,130.00 $60.00$22,200.00 $75.00$27,750.00 
14CLASS E REVETMENT (CHECK DAM)120Tons$49.00$5,880.00 $60.00$7,200.00 $105.00$12,600.00 
15SHOT ROCK (BENCH BACKFILL)3870Tons$38.00$147,060.00 $50.00$193,500.00 $50.00$193,500.00 
16CLASS E REVETMENT (PIPE OUTLET)8Tons$60.00$480.00 $60.00$480.00 $310.00$2,480.00 
17SUBDRAIN, PERFORATED, DUAL WALL HDPE, 6"450L.F.$15.00$6,750.00 $20.00$9,000.00 $36.00$16,200.00 
18STORM SEWER, NON-PERFORATED, DUAL WALL HDPE, 18"305L.F.$34.50$10,522.50 $40.00$12,200.00 $47.00$14,335.00 
19INTAKE, SW-512, 30"5Each$2,700.00$13,500.00 $3,500.00$17,500.00 $2,100.00$10,500.00 
20ANTI-SEEPAGE COLLAR3Each$300.00$900.00 $500.00$1,500.00 $200.00$600.00 
21SEEDING, DITCH MIX0.3Acres$6,500.00$1,950.00 $7,150.00$2,145.00 $8,500.00$2,550.00 
22EROSION CONTROL, 8" WATTLES460L.F.$3.75$1,725.00 $2.20$1,012.00 $7.00$3,220.00 
      $462,653.50  $480,702.00  $491,400.00 
 
10
11
12
Estimated Cost: $575,000.00
Contractor: 
Heck's Dozer Inc.
Funding Source: 100% Park & Institutional Road Fund, 518 W Sycamore


Ogden IA  50212    
Plan Sets Requested: 4
Quantities
515-275-2953
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION & DEMOBILIZATION1L.S.$12,100.00$12,100.00 $0.00 $0.00 
2TRAFFIC CONTROL1L.S.$27,500.00$27,500.00 $0.00 $0.00 
3SITE PREP & CLEARING1L.S.$65,120.00$65,120.00 $0.00 $0.00 
4CULVERT REMOVAL & DISPOSAL3Each$2,647.34$7,942.02 $0.00 $0.00 
5CULVERT PLUGGING1Each$1,364.00$1,364.00 $0.00 $0.00 
6DITCH GRADING420L.F.$17.60$7,392.00 $0.00 $0.00 
7EXCAVATION2350C.Y.$31.99$75,176.50 $0.00 $0.00 
8TOPSOIL IMPORT65C.Y.$35.20$2,288.00 $0.00 $0.00 
9HMA REMOVAL & DISPOSAL462S.Y.$80.76$37,311.12 $0.00 $0.00 
10PCC PAVEMENT (7")462S.Y.$123.81$57,200.22 $0.00 $0.00 
11POROUS BACKFILL360Tons$67.03$24,130.80 $0.00 $0.00 
12CLASS A ROADSTONE340Tons$47.62$16,190.80 $0.00 $0.00 
13CLASS E REVETMENT (BANK STABILIZATION)370Tons$170.89$63,229.30 $0.00 $0.00 
14CLASS E REVETMENT (CHECK DAM)120Tons$392.70$47,124.00 $0.00 $0.00 
15SHOT ROCK (BENCH BACKFILL)3870Tons$50.35$194,854.50 $0.00 $0.00 
16CLASS E REVETMENT (PIPE OUTLET)8Tons$161.15$1,289.20 $0.00 $0.00 
17SUBDRAIN, PERFORATED, DUAL WALL HDPE, 6"450L.F.$33.20$14,940.00 $0.00 $0.00 
18STORM SEWER, NON-PERFORATED, DUAL WALL HDPE, 18"305L.F.$57.42$17,513.10 $0.00 $0.00 
19INTAKE, SW-512, 30"5Each$3,841.20$19,206.00 $0.00 $0.00 
20ANTI-SEEPAGE COLLAR3Each$1,074.34$3,223.02 $0.00 $0.00 
21SEEDING, DITCH MIX0.3Acres$18,333.34$5,500.002 $0.00 $0.00 
22EROSION CONTROL, 8" WATTLES460L.F.$3.34$1,536.40 $0.00 $0.00 
      $702,130.982  $0.00  $0.00 
 



 