IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Ledges State Park  Date: 11/16/2017  Project No.  
  Campground Renovation And Entrance Portal  County:   BOONE  Time: 11:00 a.m.  17-02-08-02

 

 
1
2
3
Estimated Cost: $756,744.00
Contractor: 
MPS Engineers, P.C. dba Kingston Services, P.C.Vieco Dev. & Construction Co. Inc.Shekar Engineering
Funding Source: 100% Infrastructure 2017, 1444 Illinois Street
5180 SE 70th Rd
2600 MLK Jr. Pkwy, Suite 200
Des Moines IA  50314Saint Joseph MO  64507Des Moines IA  50310
Plan Sets Requested: 7
Quantities
515-681-7215816-232-9044515-334-5062
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$71,000.00$71,000.00 $32,000.00$32,000.00 $40,000.00$40,000.00 
2Tree Removal1L.S.$20,250.00$20,250.00 $14,000.00$14,000.00 $16,000.00$16,000.00 
3Clearing and Grubbing1L.S.$12,000.00$12,000.00 $5,000.00$5,000.00 $25,000.00$25,000.00 
4Excavation, Class 10, 6" Camp Pad Core Out1556C.Y.$15.00$23,340.00 $18.00$28,008.00 $17.00$26,452.00 
5Macadam Stone, 4" Depth1802Tons$32.00$57,664.00 $38.00$68,476.00 $40.00$72,080.00 
63/8" Minus Crushed Stone, 2" Depth1000Tons$25.00$25,000.00 $36.00$36,000.00 $47.00$47,000.00 
7Engineering Fabric9338S.Y.$1.75$16,341.50 $2.50$23,345.00 $3.00$28,014.00 
8NPDES General Permit #2 & SWPPP1L.S.$6,000.00$6,000.00 $5,500.00$5,500.00 $500.00$500.00 
92" PVC SDR 21 Water Line1187L.F.$15.00$17,805.00 $20.00$23,740.00 $10.00$11,870.00 
101" HDPE Water Line350L.F.$10.00$3,500.00 $14.00$4,900.00 $16.00$5,600.00 
112 1/2" Flushing Hydrant3Each$2,500.00$7,500.00 $2,000.00$6,000.00 $4,000.00$12,000.00 
12Yard Hydrant15Each$1,300.00$19,500.00 $1,700.00$25,500.00 $2,500.00$37,500.00 
13Detectable Warning Tape, 3" Water1537L.F.$0.35$537.95 $1.70$2,612.90 $2.00$3,074.00 
146" x 6" x 4" PVC Wyes23Each$250.00$5,750.00 $170.00$3,910.00 $300.00$6,900.00 
15Curb Stop/Valve Box15Each$400.00$6,000.00 $500.00$7,500.00 $300.00$4,500.00 
16Corporation Stop15Each$400.00$6,000.00 $390.00$5,850.00 $200.00$3,000.00 
174" x 2" Tees2Each$250.00$500.00 $550.00$1,100.00 $200.00$400.00 
18System Disinfection1L.S.$1,500.00$1,500.00 $2,800.00$2,800.00 $1,000.00$1,000.00 
196" SDR 35 PVC Sewer Pipe980L.F.$25.00$24,500.00 $39.00$38,220.00 $40.00$39,200.00 
204" SDR 35 PVC Sewer Pipe570L.F.$20.00$11,400.00 $25.00$14,250.00 $30.00$17,100.00 
21Detectable Warning Tape, 3" Sewer1904L.F.$0.35$666.40 $1.70$3,236.80 $2.00$3,808.00 
222" SDR 11 HDPE Sewer Pipe354L.F.$42.00$14,868.00 $18.00$6,372.00 $15.00$5,310.00 
23Duplex Grinder Pump Station with Control and Alarm Panel, Complete1L.S.$8,000.00$8,000.00 $21,000.00$21,000.00 $22,000.00$22,000.00 
24Sanitary Sewer Cleanout Assembly12Each$500.00$6,000.00 $300.00$3,600.00 $700.00$8,400.00 
25RV Sewer Cleanout Assembly15Each$200.00$3,000.00 $360.00$5,400.00 $600.00$9,000.00 
26Manhole, Complete1L.S.$4,500.00$4,500.00 $6,000.00$6,000.00 $7,500.00$7,500.00 
27Excavation, Class 10, 12" Core Out504C.Y.$15.00$7,560.00 $12.00$6,048.00 $50.00$25,200.00 
28Special Backfill, 6" Depth476Tons$21.00$9,996.00 $20.00$9,520.00 $50.00$23,800.00 
29Hot Mix Asphalt, Standard Traffic, 2" Base Course, 3/4" Mix168Tons$63.00$10,584.00 $69.00$11,592.00 $72.00$12,096.00 
30Hot Mix Asphalt, Standard Traffic, 2" Intermediate Course, 3/4" Mix168Tons$64.00$10,752.00 $69.00$11,592.00 $73.00$12,264.00 
31Hot Mix Asphalt, Standard Traffic, 2" Surface Course, 1/2" Mix168Tons$64.00$10,752.00 $69.00$11,592.00 $73.00$12,264.00 
32Asphalt Binder, PG 58-28S51Tons$425.00$21,675.00 $460.00$23,460.00 $520.00$26,520.00 
33Road Widening1L.S.$43,185.50$43,185.50 $48,400.00$48,400.00 $6,000.00$6,000.00 
34Pad Mounted 800 Amp Distribution Panel and CT Cabinet & Connections, Complete1Each$8,448.00$8,448.00 $7,800.00$7,800.00 $7,000.00$7,000.00 
35Pad Mounted 600 Amp Distribution Panel and CT Cabinet & Connections, Complete2Each$8,085.00$16,170.00 $6,600.00$13,200.00 $5,000.00$10,000.00 
36Pad Mounted 400 Amp Distribution Panel and CT Cabinet & Connections, Complete2Each$7,384.00$14,768.00 $6,000.00$12,000.00 $4,000.00$8,000.00 
37Single Campsite Outlet Post - 50 Amp68Each$400.00$27,200.00 $420.00$28,560.00 $1,000.00$68,000.00 
38Double Campsite Outlet Post - 50 Amp2Each$640.00$1,280.00 $600.00$1,200.00 $1,100.00$2,200.00 
39No. 8 AWG Grounding Conductor Cable, Type THW or USE255L.F.$1.00$255.00 $1.00$255.00 $0.75$191.25 
40No. 6 AWG Grounding Conductor Cable, Type THW or USE820L.F.$1.00$820.00 $1.20$984.00 $0.99$811.80 
41No. 4 AWG Grounding Conductor Cable, Type THW or USE472L.F.$1.20$566.40 $2.00$944.00 $1.86$877.92 
42No. 2 AWG Grounding Conductor Cable, Type THW or USE5157L.F.$1.94$10,004.58 $2.20$11,345.40 $2.07$10,674.99 
43No. 4 AWG Single Conductor Cable, Type USE765L.F.$1.20$918.00 $1.60$1,224.00 $1.86$1,422.90 
44No. 1/0 AWG Single Conductor Cable, Type USE2460L.F.$2.96$7,281.60 $3.50$8,610.00 $3.17$7,798.20 
45No. 2/0 AWG Single Conductor Cable, Type USE210L.F.$3.88$814.80 $4.00$840.00 $4.25$892.50 
46No. 4/0 AWG Single Conductor Cable, Type USE9349L.F.$5.10$47,679.90 $5.00$46,745.00 $5.53$51,699.97 
47No. 250 MCM Single Conductor Cable, Type USE1188L.F.$6.17$7,329.96 $7.25$8,613.00 $6.50$7,722.00 
48No. 300 MCM Single Conductor Cable, Type USE2475L.F.$7.96$19,701.00 $7.40$18,315.00 $7.50$18,562.50 
49No. 350 MCM Single Conductor Cable, Type USE2757L.F.$7.96$21,945.72 $8.00$22,056.00 $8.74$24,096.18 
50Roadway Crossing Conduit - Schedule 80 PVC164L.F.$1.50$246.00 $8.00$1,312.00 $34.00$5,576.00 
51Detectable Warning Tape, 3" Electric5447L.F.$0.15$817.05 $0.20$1,089.40 $2.00$10,894.00 
52Trench, Single Circuit Secondary5528L.F.$3.00$16,584.00 $3.50$19,348.00 $4.00$22,112.00 
53Remove and Dispose of Low Level Lighting Bollards12Each$165.00$1,980.00 $80.00$960.00 $6.00$72.00 
54Replace HPS Lights w/LED Fixtures5Each$888.00$4,440.00 $700.00$3,500.00 $1,000.00$5,000.00 
55Entrance Portal, Complete1L.S.$38,600.00$38,600.00 $36,200.00$36,200.00 $35,000.00$35,000.00 
56Seeding, Fertilizing and Mulching1L.S.$9,400.00$9,400.00 $12,000.00$12,000.00 $25,000.00$25,000.00 
576" Non-perforated PE Tubing700L.F.$15.00$10,500.00 $3.00$2,100.00 $0.00$0.00 
586" x 6" x 6" PE Tees4Each$100.00$400.00 $50.00$200.00 $0.00$0.00 
596" x 5' Steel Riser w/Trash Guard4Each$200.00$800.00 $500.00$2,000.00 $0.00$0.00 
606" CMP with Animal Guards20L.F.$50.00$1,000.00 $50.00$1,000.00 $0.00$0.00 
      $757,577.36  $778,925.50  $894,956.21 
 
4
5
6
Estimated Cost: $756,744.00
Contractor: 
On Track Construction, LLCOLP Construction, LLCMinturn, Inc.
Funding Source: 100% Infrastructure 2017, 880 Lake Shore Drive
3809 NW 109th St., Suite D
144 W. Front St.
Nevada IA  50201Urbandale IA  50322Brooklyn IA  52211
Plan Sets Requested: 7
Quantities
515-451-6719515-348-8110641-455-0331
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$75,000.00$75,000.00 $99,297.90$99,297.90 $47,450.00$47,450.00 
2Tree Removal1L.S.$12,120.00$12,120.00 $12,896.00$12,896.00 $20,000.00$20,000.00 
3Clearing and Grubbing1L.S.$10,805.00$10,805.00 $7,800.00$7,800.00 $15,000.00$15,000.00 
4Excavation, Class 10, 6" Camp Pad Core Out1556C.Y.$6.00$9,336.00 $25.70$39,989.20 $22.50$35,010.00 
5Macadam Stone, 4" Depth1802Tons$33.00$59,466.00 $34.00$61,268.00 $52.50$94,605.00 
63/8" Minus Crushed Stone, 2" Depth1000Tons$24.00$24,000.00 $37.70$37,700.00 $55.00$55,000.00 
7Engineering Fabric9338S.Y.$2.00$18,676.00 $3.50$32,683.00 $2.50$23,345.00 
8NPDES General Permit #2 & SWPPP1L.S.$15,000.00$15,000.00 $14,775.00$14,775.00 $10,000.00$10,000.00 
92" PVC SDR 21 Water Line1187L.F.$24.00$28,488.00 $10.60$12,582.20 $22.50$26,707.50 
101" HDPE Water Line350L.F.$35.00$12,250.00 $17.40$6,090.00 $22.50$7,875.00 
112 1/2" Flushing Hydrant3Each$3,100.00$9,300.00 $2,112.90$6,338.70 $2,600.00$7,800.00 
12Yard Hydrant15Each$2,050.00$30,750.00 $1,597.60$23,964.00 $2,000.00$30,000.00 
13Detectable Warning Tape, 3" Water1537L.F.$1.00$1,537.00 $0.40$614.80 $0.05$76.85 
146" x 6" x 4" PVC Wyes23Each$210.00$4,830.00 $193.50$4,450.50 $425.00$9,775.00 
15Curb Stop/Valve Box15Each$800.00$12,000.00 $701.70$10,525.50 $600.00$9,000.00 
16Corporation Stop15Each$450.00$6,750.00 $352.70$5,290.50 $100.00$1,500.00 
174" x 2" Tees2Each$1,365.00$2,730.00 $1,467.70$2,935.40 $120.00$240.00 
18System Disinfection1L.S.$3,200.00$3,200.00 $4,902.60$4,902.60 $5,000.00$5,000.00 
196" SDR 35 PVC Sewer Pipe980L.F.$35.00$34,300.00 $28.60$28,028.00 $46.25$45,325.00 
204" SDR 35 PVC Sewer Pipe570L.F.$42.00$23,940.00 $35.20$20,064.00 $41.50$23,655.00 
21Detectable Warning Tape, 3" Sewer1904L.F.$1.00$1,904.00 $0.30$571.20 $0.05$95.20 
222" SDR 11 HDPE Sewer Pipe354L.F.$30.00$10,620.00 $39.00$13,806.00 $31.75$11,239.50 
23Duplex Grinder Pump Station with Control and Alarm Panel, Complete1L.S.$27,000.00$27,000.00 $32,383.10$32,383.10 $27,500.00$27,500.00 
24Sanitary Sewer Cleanout Assembly12Each$950.00$11,400.00 $830.80$9,969.60 $1,075.00$12,900.00 
25RV Sewer Cleanout Assembly15Each$1,400.00$21,000.00 $714.80$10,722.00 $825.00$12,375.00 
26Manhole, Complete1L.S.$4,035.00$4,035.00 $5,279.20$5,279.20 $5,500.00$5,500.00 
27Excavation, Class 10, 12" Core Out504C.Y.$6.00$3,024.00 $20.90$10,533.60 $26.75$13,482.00 
28Special Backfill, 6" Depth476Tons$29.00$13,804.00 $60.30$28,702.80 $56.00$26,656.00 
29Hot Mix Asphalt, Standard Traffic, 2" Base Course, 3/4" Mix168Tons$64.00$10,752.00 $62.00$10,416.00 $65.00$10,920.00 
30Hot Mix Asphalt, Standard Traffic, 2" Intermediate Course, 3/4" Mix168Tons$64.00$10,752.00 $63.00$10,584.00 $65.00$10,920.00 
31Hot Mix Asphalt, Standard Traffic, 2" Surface Course, 1/2" Mix168Tons$64.00$10,752.00 $63.00$10,584.00 $65.00$10,920.00 
32Asphalt Binder, PG 58-28S51Tons$425.00$21,675.00 $420.00$21,420.00 $450.00$22,950.00 
33Road Widening1L.S.$47,600.00$47,600.00 $72,336.30$72,336.30 $62,000.00$62,000.00 
34Pad Mounted 800 Amp Distribution Panel and CT Cabinet & Connections, Complete1Each$8,850.00$8,850.00 $8,448.00$8,448.00 $9,000.00$9,000.00 
35Pad Mounted 600 Amp Distribution Panel and CT Cabinet & Connections, Complete2Each$8,500.00$17,000.00 $8,085.50$16,171.00 $8,500.00$17,000.00 
36Pad Mounted 400 Amp Distribution Panel and CT Cabinet & Connections, Complete2Each$7,200.00$14,400.00 $7,384.00$14,768.00 $7,500.00$15,000.00 
37Single Campsite Outlet Post - 50 Amp68Each$485.00$32,980.00 $400.00$27,200.00 $450.00$30,600.00 
38Double Campsite Outlet Post - 50 Amp2Each$1,245.00$2,490.00 $640.00$1,280.00 $700.00$1,400.00 
39No. 8 AWG Grounding Conductor Cable, Type THW or USE255L.F.$1.40$357.00 $1.00$255.00 $1.00$255.00 
40No. 6 AWG Grounding Conductor Cable, Type THW or USE820L.F.$1.70$1,394.00 $1.00$820.00 $1.00$820.00 
41No. 4 AWG Grounding Conductor Cable, Type THW or USE472L.F.$2.00$944.00 $1.20$566.40 $1.20$566.40 
42No. 2 AWG Grounding Conductor Cable, Type THW or USE5157L.F.$3.00$15,471.00 $1.94$10,004.58 $2.00$10,314.00 
43No. 4 AWG Single Conductor Cable, Type USE765L.F.$2.00$1,530.00 $1.20$918.00 $1.50$1,147.50 
44No. 1/0 AWG Single Conductor Cable, Type USE2460L.F.$5.50$13,530.00 $2.96$7,281.60 $3.00$7,380.00 
45No. 2/0 AWG Single Conductor Cable, Type USE210L.F.$7.00$1,470.00 $3.88$814.80 $4.00$840.00 
46No. 4/0 AWG Single Conductor Cable, Type USE9349L.F.$1.00$9,349.00 $5.31$49,643.19 $5.50$51,419.50 
47No. 250 MCM Single Conductor Cable, Type USE1188L.F.$9.50$11,286.00 $6.17$7,329.96 $6.50$7,722.00 
48No. 300 MCM Single Conductor Cable, Type USE2475L.F.$10.00$24,750.00 $7.96$19,701.00 $8.00$19,800.00 
49No. 350 MCM Single Conductor Cable, Type USE2757L.F.$11.50$31,705.50 $7.96$21,945.72 $8.00$22,056.00 
50Roadway Crossing Conduit - Schedule 80 PVC164L.F.$33.00$5,412.00 $1.50$246.00 $2.00$328.00 
51Detectable Warning Tape, 3" Electric5447L.F.$0.50$2,723.50 $0.15$817.05 $0.25$1,361.75 
52Trench, Single Circuit Secondary5528L.F.$8.00$44,224.00 $3.00$16,584.00 $4.00$22,112.00 
53Remove and Dispose of Low Level Lighting Bollards12Each$325.00$3,900.00 $165.00$1,980.00 $200.00$2,400.00 
54Replace HPS Lights w/LED Fixtures5Each$640.00$3,200.00 $888.00$4,440.00 $1,100.00$5,500.00 
55Entrance Portal, Complete1L.S.$30,300.00$30,300.00 $34,747.00$34,747.00 $95,000.00$95,000.00 
56Seeding, Fertilizing and Mulching1L.S.$20,200.00$20,200.00 $20,000.00$20,000.00 $20,000.00$20,000.00 
576" Non-perforated PE Tubing700L.F.$24.50$17,150.00 $33.50$23,450.00 $26.00$18,200.00 
586" x 6" x 6" PE Tees4Each$340.00$1,360.00 $537.60$2,150.40 $740.00$2,960.00 
596" x 5' Steel Riser w/Trash Guard4Each$785.00$3,140.00 $1,166.20$4,664.80 $1,200.00$4,800.00 
606" CMP with Animal Guards20L.F.$44.00$880.00 $170.80$3,416.00 $57.00$1,140.00 
      $908,792.00  $969,145.60  $1,063,944.20 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Shekar Engineering, Des Moines, IA
MPS Engineers, P.C. dba Kingston Services, P.C., Des Moines, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.

6/25/2019