IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Ledges State Park | Date: 11/16/2017 | Project No. |
| Campground Renovation And Entrance Portal | County: | BOONE | Time: 11:00 a.m. | 17-02-08-02 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $756,744.00 | Contractor: | MPS Engineers, P.C. dba Kingston Services, P.C. | Vieco Dev. & Construction Co. Inc. | Shekar Engineering | |||||||||
| Funding Source: 100% Infrastructure 2017, | 1444 Illinois Street | 5180 SE 70th Rd | 2600 MLK Jr. Pkwy, Suite 200 | ||||||||||
| Des Moines IA 50314 | Saint Joseph MO 64507 | Des Moines IA 50310 | |||||||||||
| Plan Sets Requested: 7 | Quantities | 515-681-7215 | 816-232-9044 | 515-334-5062 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $71,000.00 | $71,000.00 | $32,000.00 | $32,000.00 | $40,000.00 | $40,000.00 | ||||
| 2 | Tree Removal | 1 | L.S. | $20,250.00 | $20,250.00 | $14,000.00 | $14,000.00 | $16,000.00 | $16,000.00 | ||||
| 3 | Clearing and Grubbing | 1 | L.S. | $12,000.00 | $12,000.00 | $5,000.00 | $5,000.00 | $25,000.00 | $25,000.00 | ||||
| 4 | Excavation, Class 10, 6" Camp Pad Core Out | 1556 | C.Y. | $15.00 | $23,340.00 | $18.00 | $28,008.00 | $17.00 | $26,452.00 | ||||
| 5 | Macadam Stone, 4" Depth | 1802 | Tons | $32.00 | $57,664.00 | $38.00 | $68,476.00 | $40.00 | $72,080.00 | ||||
| 6 | 3/8" Minus Crushed Stone, 2" Depth | 1000 | Tons | $25.00 | $25,000.00 | $36.00 | $36,000.00 | $47.00 | $47,000.00 | ||||
| 7 | Engineering Fabric | 9338 | S.Y. | $1.75 | $16,341.50 | $2.50 | $23,345.00 | $3.00 | $28,014.00 | ||||
| 8 | NPDES General Permit #2 & SWPPP | 1 | L.S. | $6,000.00 | $6,000.00 | $5,500.00 | $5,500.00 | $500.00 | $500.00 | ||||
| 9 | 2" PVC SDR 21 Water Line | 1187 | L.F. | $15.00 | $17,805.00 | $20.00 | $23,740.00 | $10.00 | $11,870.00 | ||||
| 10 | 1" HDPE Water Line | 350 | L.F. | $10.00 | $3,500.00 | $14.00 | $4,900.00 | $16.00 | $5,600.00 | ||||
| 11 | 2 1/2" Flushing Hydrant | 3 | Each | $2,500.00 | $7,500.00 | $2,000.00 | $6,000.00 | $4,000.00 | $12,000.00 | ||||
| 12 | Yard Hydrant | 15 | Each | $1,300.00 | $19,500.00 | $1,700.00 | $25,500.00 | $2,500.00 | $37,500.00 | ||||
| 13 | Detectable Warning Tape, 3" Water | 1537 | L.F. | $0.35 | $537.95 | $1.70 | $2,612.90 | $2.00 | $3,074.00 | ||||
| 14 | 6" x 6" x 4" PVC Wyes | 23 | Each | $250.00 | $5,750.00 | $170.00 | $3,910.00 | $300.00 | $6,900.00 | ||||
| 15 | Curb Stop/Valve Box | 15 | Each | $400.00 | $6,000.00 | $500.00 | $7,500.00 | $300.00 | $4,500.00 | ||||
| 16 | Corporation Stop | 15 | Each | $400.00 | $6,000.00 | $390.00 | $5,850.00 | $200.00 | $3,000.00 | ||||
| 17 | 4" x 2" Tees | 2 | Each | $250.00 | $500.00 | $550.00 | $1,100.00 | $200.00 | $400.00 | ||||
| 18 | System Disinfection | 1 | L.S. | $1,500.00 | $1,500.00 | $2,800.00 | $2,800.00 | $1,000.00 | $1,000.00 | ||||
| 19 | 6" SDR 35 PVC Sewer Pipe | 980 | L.F. | $25.00 | $24,500.00 | $39.00 | $38,220.00 | $40.00 | $39,200.00 | ||||
| 20 | 4" SDR 35 PVC Sewer Pipe | 570 | L.F. | $20.00 | $11,400.00 | $25.00 | $14,250.00 | $30.00 | $17,100.00 | ||||
| 21 | Detectable Warning Tape, 3" Sewer | 1904 | L.F. | $0.35 | $666.40 | $1.70 | $3,236.80 | $2.00 | $3,808.00 | ||||
| 22 | 2" SDR 11 HDPE Sewer Pipe | 354 | L.F. | $42.00 | $14,868.00 | $18.00 | $6,372.00 | $15.00 | $5,310.00 | ||||
| 23 | Duplex Grinder Pump Station with Control and Alarm Panel, Complete | 1 | L.S. | $8,000.00 | $8,000.00 | $21,000.00 | $21,000.00 | $22,000.00 | $22,000.00 | ||||
| 24 | Sanitary Sewer Cleanout Assembly | 12 | Each | $500.00 | $6,000.00 | $300.00 | $3,600.00 | $700.00 | $8,400.00 | ||||
| 25 | RV Sewer Cleanout Assembly | 15 | Each | $200.00 | $3,000.00 | $360.00 | $5,400.00 | $600.00 | $9,000.00 | ||||
| 26 | Manhole, Complete | 1 | L.S. | $4,500.00 | $4,500.00 | $6,000.00 | $6,000.00 | $7,500.00 | $7,500.00 | ||||
| 27 | Excavation, Class 10, 12" Core Out | 504 | C.Y. | $15.00 | $7,560.00 | $12.00 | $6,048.00 | $50.00 | $25,200.00 | ||||
| 28 | Special Backfill, 6" Depth | 476 | Tons | $21.00 | $9,996.00 | $20.00 | $9,520.00 | $50.00 | $23,800.00 | ||||
| 29 | Hot Mix Asphalt, Standard Traffic, 2" Base Course, 3/4" Mix | 168 | Tons | $63.00 | $10,584.00 | $69.00 | $11,592.00 | $72.00 | $12,096.00 | ||||
| 30 | Hot Mix Asphalt, Standard Traffic, 2" Intermediate Course, 3/4" Mix | 168 | Tons | $64.00 | $10,752.00 | $69.00 | $11,592.00 | $73.00 | $12,264.00 | ||||
| 31 | Hot Mix Asphalt, Standard Traffic, 2" Surface Course, 1/2" Mix | 168 | Tons | $64.00 | $10,752.00 | $69.00 | $11,592.00 | $73.00 | $12,264.00 | ||||
| 32 | Asphalt Binder, PG 58-28S | 51 | Tons | $425.00 | $21,675.00 | $460.00 | $23,460.00 | $520.00 | $26,520.00 | ||||
| 33 | Road Widening | 1 | L.S. | $43,185.50 | $43,185.50 | $48,400.00 | $48,400.00 | $6,000.00 | $6,000.00 | ||||
| 34 | Pad Mounted 800 Amp Distribution Panel and CT Cabinet & Connections, Complete | 1 | Each | $8,448.00 | $8,448.00 | $7,800.00 | $7,800.00 | $7,000.00 | $7,000.00 | ||||
| 35 | Pad Mounted 600 Amp Distribution Panel and CT Cabinet & Connections, Complete | 2 | Each | $8,085.00 | $16,170.00 | $6,600.00 | $13,200.00 | $5,000.00 | $10,000.00 | ||||
| 36 | Pad Mounted 400 Amp Distribution Panel and CT Cabinet & Connections, Complete | 2 | Each | $7,384.00 | $14,768.00 | $6,000.00 | $12,000.00 | $4,000.00 | $8,000.00 | ||||
| 37 | Single Campsite Outlet Post - 50 Amp | 68 | Each | $400.00 | $27,200.00 | $420.00 | $28,560.00 | $1,000.00 | $68,000.00 | ||||
| 38 | Double Campsite Outlet Post - 50 Amp | 2 | Each | $640.00 | $1,280.00 | $600.00 | $1,200.00 | $1,100.00 | $2,200.00 | ||||
| 39 | No. 8 AWG Grounding Conductor Cable, Type THW or USE | 255 | L.F. | $1.00 | $255.00 | $1.00 | $255.00 | $0.75 | $191.25 | ||||
| 40 | No. 6 AWG Grounding Conductor Cable, Type THW or USE | 820 | L.F. | $1.00 | $820.00 | $1.20 | $984.00 | $0.99 | $811.80 | ||||
| 41 | No. 4 AWG Grounding Conductor Cable, Type THW or USE | 472 | L.F. | $1.20 | $566.40 | $2.00 | $944.00 | $1.86 | $877.92 | ||||
| 42 | No. 2 AWG Grounding Conductor Cable, Type THW or USE | 5157 | L.F. | $1.94 | $10,004.58 | $2.20 | $11,345.40 | $2.07 | $10,674.99 | ||||
| 43 | No. 4 AWG Single Conductor Cable, Type USE | 765 | L.F. | $1.20 | $918.00 | $1.60 | $1,224.00 | $1.86 | $1,422.90 | ||||
| 44 | No. 1/0 AWG Single Conductor Cable, Type USE | 2460 | L.F. | $2.96 | $7,281.60 | $3.50 | $8,610.00 | $3.17 | $7,798.20 | ||||
| 45 | No. 2/0 AWG Single Conductor Cable, Type USE | 210 | L.F. | $3.88 | $814.80 | $4.00 | $840.00 | $4.25 | $892.50 | ||||
| 46 | No. 4/0 AWG Single Conductor Cable, Type USE | 9349 | L.F. | $5.10 | $47,679.90 | $5.00 | $46,745.00 | $5.53 | $51,699.97 | ||||
| 47 | No. 250 MCM Single Conductor Cable, Type USE | 1188 | L.F. | $6.17 | $7,329.96 | $7.25 | $8,613.00 | $6.50 | $7,722.00 | ||||
| 48 | No. 300 MCM Single Conductor Cable, Type USE | 2475 | L.F. | $7.96 | $19,701.00 | $7.40 | $18,315.00 | $7.50 | $18,562.50 | ||||
| 49 | No. 350 MCM Single Conductor Cable, Type USE | 2757 | L.F. | $7.96 | $21,945.72 | $8.00 | $22,056.00 | $8.74 | $24,096.18 | ||||
| 50 | Roadway Crossing Conduit - Schedule 80 PVC | 164 | L.F. | $1.50 | $246.00 | $8.00 | $1,312.00 | $34.00 | $5,576.00 | ||||
| 51 | Detectable Warning Tape, 3" Electric | 5447 | L.F. | $0.15 | $817.05 | $0.20 | $1,089.40 | $2.00 | $10,894.00 | ||||
| 52 | Trench, Single Circuit Secondary | 5528 | L.F. | $3.00 | $16,584.00 | $3.50 | $19,348.00 | $4.00 | $22,112.00 | ||||
| 53 | Remove and Dispose of Low Level Lighting Bollards | 12 | Each | $165.00 | $1,980.00 | $80.00 | $960.00 | $6.00 | $72.00 | ||||
| 54 | Replace HPS Lights w/LED Fixtures | 5 | Each | $888.00 | $4,440.00 | $700.00 | $3,500.00 | $1,000.00 | $5,000.00 | ||||
| 55 | Entrance Portal, Complete | 1 | L.S. | $38,600.00 | $38,600.00 | $36,200.00 | $36,200.00 | $35,000.00 | $35,000.00 | ||||
| 56 | Seeding, Fertilizing and Mulching | 1 | L.S. | $9,400.00 | $9,400.00 | $12,000.00 | $12,000.00 | $25,000.00 | $25,000.00 | ||||
| 57 | 6" Non-perforated PE Tubing | 700 | L.F. | $15.00 | $10,500.00 | $3.00 | $2,100.00 | $0.00 | $0.00 | ||||
| 58 | 6" x 6" x 6" PE Tees | 4 | Each | $100.00 | $400.00 | $50.00 | $200.00 | $0.00 | $0.00 | ||||
| 59 | 6" x 5' Steel Riser w/Trash Guard | 4 | Each | $200.00 | $800.00 | $500.00 | $2,000.00 | $0.00 | $0.00 | ||||
| 60 | 6" CMP with Animal Guards | 20 | L.F. | $50.00 | $1,000.00 | $50.00 | $1,000.00 | $0.00 | $0.00 | ||||
| $757,577.36 | $778,925.50 | $894,956.21 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $756,744.00 | Contractor: | On Track Construction, LLC | OLP Construction, LLC | Minturn, Inc. | |||||||||
| Funding Source: 100% Infrastructure 2017, | 880 Lake Shore Drive | 3809 NW 109th St., Suite D | 144 W. Front St. | ||||||||||
| Nevada IA 50201 | Urbandale IA 50322 | Brooklyn IA 52211 | |||||||||||
| Plan Sets Requested: 7 | Quantities | 515-451-6719 | 515-348-8110 | 641-455-0331 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $75,000.00 | $75,000.00 | $99,297.90 | $99,297.90 | $47,450.00 | $47,450.00 | ||||
| 2 | Tree Removal | 1 | L.S. | $12,120.00 | $12,120.00 | $12,896.00 | $12,896.00 | $20,000.00 | $20,000.00 | ||||
| 3 | Clearing and Grubbing | 1 | L.S. | $10,805.00 | $10,805.00 | $7,800.00 | $7,800.00 | $15,000.00 | $15,000.00 | ||||
| 4 | Excavation, Class 10, 6" Camp Pad Core Out | 1556 | C.Y. | $6.00 | $9,336.00 | $25.70 | $39,989.20 | $22.50 | $35,010.00 | ||||
| 5 | Macadam Stone, 4" Depth | 1802 | Tons | $33.00 | $59,466.00 | $34.00 | $61,268.00 | $52.50 | $94,605.00 | ||||
| 6 | 3/8" Minus Crushed Stone, 2" Depth | 1000 | Tons | $24.00 | $24,000.00 | $37.70 | $37,700.00 | $55.00 | $55,000.00 | ||||
| 7 | Engineering Fabric | 9338 | S.Y. | $2.00 | $18,676.00 | $3.50 | $32,683.00 | $2.50 | $23,345.00 | ||||
| 8 | NPDES General Permit #2 & SWPPP | 1 | L.S. | $15,000.00 | $15,000.00 | $14,775.00 | $14,775.00 | $10,000.00 | $10,000.00 | ||||
| 9 | 2" PVC SDR 21 Water Line | 1187 | L.F. | $24.00 | $28,488.00 | $10.60 | $12,582.20 | $22.50 | $26,707.50 | ||||
| 10 | 1" HDPE Water Line | 350 | L.F. | $35.00 | $12,250.00 | $17.40 | $6,090.00 | $22.50 | $7,875.00 | ||||
| 11 | 2 1/2" Flushing Hydrant | 3 | Each | $3,100.00 | $9,300.00 | $2,112.90 | $6,338.70 | $2,600.00 | $7,800.00 | ||||
| 12 | Yard Hydrant | 15 | Each | $2,050.00 | $30,750.00 | $1,597.60 | $23,964.00 | $2,000.00 | $30,000.00 | ||||
| 13 | Detectable Warning Tape, 3" Water | 1537 | L.F. | $1.00 | $1,537.00 | $0.40 | $614.80 | $0.05 | $76.85 | ||||
| 14 | 6" x 6" x 4" PVC Wyes | 23 | Each | $210.00 | $4,830.00 | $193.50 | $4,450.50 | $425.00 | $9,775.00 | ||||
| 15 | Curb Stop/Valve Box | 15 | Each | $800.00 | $12,000.00 | $701.70 | $10,525.50 | $600.00 | $9,000.00 | ||||
| 16 | Corporation Stop | 15 | Each | $450.00 | $6,750.00 | $352.70 | $5,290.50 | $100.00 | $1,500.00 | ||||
| 17 | 4" x 2" Tees | 2 | Each | $1,365.00 | $2,730.00 | $1,467.70 | $2,935.40 | $120.00 | $240.00 | ||||
| 18 | System Disinfection | 1 | L.S. | $3,200.00 | $3,200.00 | $4,902.60 | $4,902.60 | $5,000.00 | $5,000.00 | ||||
| 19 | 6" SDR 35 PVC Sewer Pipe | 980 | L.F. | $35.00 | $34,300.00 | $28.60 | $28,028.00 | $46.25 | $45,325.00 | ||||
| 20 | 4" SDR 35 PVC Sewer Pipe | 570 | L.F. | $42.00 | $23,940.00 | $35.20 | $20,064.00 | $41.50 | $23,655.00 | ||||
| 21 | Detectable Warning Tape, 3" Sewer | 1904 | L.F. | $1.00 | $1,904.00 | $0.30 | $571.20 | $0.05 | $95.20 | ||||
| 22 | 2" SDR 11 HDPE Sewer Pipe | 354 | L.F. | $30.00 | $10,620.00 | $39.00 | $13,806.00 | $31.75 | $11,239.50 | ||||
| 23 | Duplex Grinder Pump Station with Control and Alarm Panel, Complete | 1 | L.S. | $27,000.00 | $27,000.00 | $32,383.10 | $32,383.10 | $27,500.00 | $27,500.00 | ||||
| 24 | Sanitary Sewer Cleanout Assembly | 12 | Each | $950.00 | $11,400.00 | $830.80 | $9,969.60 | $1,075.00 | $12,900.00 | ||||
| 25 | RV Sewer Cleanout Assembly | 15 | Each | $1,400.00 | $21,000.00 | $714.80 | $10,722.00 | $825.00 | $12,375.00 | ||||
| 26 | Manhole, Complete | 1 | L.S. | $4,035.00 | $4,035.00 | $5,279.20 | $5,279.20 | $5,500.00 | $5,500.00 | ||||
| 27 | Excavation, Class 10, 12" Core Out | 504 | C.Y. | $6.00 | $3,024.00 | $20.90 | $10,533.60 | $26.75 | $13,482.00 | ||||
| 28 | Special Backfill, 6" Depth | 476 | Tons | $29.00 | $13,804.00 | $60.30 | $28,702.80 | $56.00 | $26,656.00 | ||||
| 29 | Hot Mix Asphalt, Standard Traffic, 2" Base Course, 3/4" Mix | 168 | Tons | $64.00 | $10,752.00 | $62.00 | $10,416.00 | $65.00 | $10,920.00 | ||||
| 30 | Hot Mix Asphalt, Standard Traffic, 2" Intermediate Course, 3/4" Mix | 168 | Tons | $64.00 | $10,752.00 | $63.00 | $10,584.00 | $65.00 | $10,920.00 | ||||
| 31 | Hot Mix Asphalt, Standard Traffic, 2" Surface Course, 1/2" Mix | 168 | Tons | $64.00 | $10,752.00 | $63.00 | $10,584.00 | $65.00 | $10,920.00 | ||||
| 32 | Asphalt Binder, PG 58-28S | 51 | Tons | $425.00 | $21,675.00 | $420.00 | $21,420.00 | $450.00 | $22,950.00 | ||||
| 33 | Road Widening | 1 | L.S. | $47,600.00 | $47,600.00 | $72,336.30 | $72,336.30 | $62,000.00 | $62,000.00 | ||||
| 34 | Pad Mounted 800 Amp Distribution Panel and CT Cabinet & Connections, Complete | 1 | Each | $8,850.00 | $8,850.00 | $8,448.00 | $8,448.00 | $9,000.00 | $9,000.00 | ||||
| 35 | Pad Mounted 600 Amp Distribution Panel and CT Cabinet & Connections, Complete | 2 | Each | $8,500.00 | $17,000.00 | $8,085.50 | $16,171.00 | $8,500.00 | $17,000.00 | ||||
| 36 | Pad Mounted 400 Amp Distribution Panel and CT Cabinet & Connections, Complete | 2 | Each | $7,200.00 | $14,400.00 | $7,384.00 | $14,768.00 | $7,500.00 | $15,000.00 | ||||
| 37 | Single Campsite Outlet Post - 50 Amp | 68 | Each | $485.00 | $32,980.00 | $400.00 | $27,200.00 | $450.00 | $30,600.00 | ||||
| 38 | Double Campsite Outlet Post - 50 Amp | 2 | Each | $1,245.00 | $2,490.00 | $640.00 | $1,280.00 | $700.00 | $1,400.00 | ||||
| 39 | No. 8 AWG Grounding Conductor Cable, Type THW or USE | 255 | L.F. | $1.40 | $357.00 | $1.00 | $255.00 | $1.00 | $255.00 | ||||
| 40 | No. 6 AWG Grounding Conductor Cable, Type THW or USE | 820 | L.F. | $1.70 | $1,394.00 | $1.00 | $820.00 | $1.00 | $820.00 | ||||
| 41 | No. 4 AWG Grounding Conductor Cable, Type THW or USE | 472 | L.F. | $2.00 | $944.00 | $1.20 | $566.40 | $1.20 | $566.40 | ||||
| 42 | No. 2 AWG Grounding Conductor Cable, Type THW or USE | 5157 | L.F. | $3.00 | $15,471.00 | $1.94 | $10,004.58 | $2.00 | $10,314.00 | ||||
| 43 | No. 4 AWG Single Conductor Cable, Type USE | 765 | L.F. | $2.00 | $1,530.00 | $1.20 | $918.00 | $1.50 | $1,147.50 | ||||
| 44 | No. 1/0 AWG Single Conductor Cable, Type USE | 2460 | L.F. | $5.50 | $13,530.00 | $2.96 | $7,281.60 | $3.00 | $7,380.00 | ||||
| 45 | No. 2/0 AWG Single Conductor Cable, Type USE | 210 | L.F. | $7.00 | $1,470.00 | $3.88 | $814.80 | $4.00 | $840.00 | ||||
| 46 | No. 4/0 AWG Single Conductor Cable, Type USE | 9349 | L.F. | $1.00 | $9,349.00 | $5.31 | $49,643.19 | $5.50 | $51,419.50 | ||||
| 47 | No. 250 MCM Single Conductor Cable, Type USE | 1188 | L.F. | $9.50 | $11,286.00 | $6.17 | $7,329.96 | $6.50 | $7,722.00 | ||||
| 48 | No. 300 MCM Single Conductor Cable, Type USE | 2475 | L.F. | $10.00 | $24,750.00 | $7.96 | $19,701.00 | $8.00 | $19,800.00 | ||||
| 49 | No. 350 MCM Single Conductor Cable, Type USE | 2757 | L.F. | $11.50 | $31,705.50 | $7.96 | $21,945.72 | $8.00 | $22,056.00 | ||||
| 50 | Roadway Crossing Conduit - Schedule 80 PVC | 164 | L.F. | $33.00 | $5,412.00 | $1.50 | $246.00 | $2.00 | $328.00 | ||||
| 51 | Detectable Warning Tape, 3" Electric | 5447 | L.F. | $0.50 | $2,723.50 | $0.15 | $817.05 | $0.25 | $1,361.75 | ||||
| 52 | Trench, Single Circuit Secondary | 5528 | L.F. | $8.00 | $44,224.00 | $3.00 | $16,584.00 | $4.00 | $22,112.00 | ||||
| 53 | Remove and Dispose of Low Level Lighting Bollards | 12 | Each | $325.00 | $3,900.00 | $165.00 | $1,980.00 | $200.00 | $2,400.00 | ||||
| 54 | Replace HPS Lights w/LED Fixtures | 5 | Each | $640.00 | $3,200.00 | $888.00 | $4,440.00 | $1,100.00 | $5,500.00 | ||||
| 55 | Entrance Portal, Complete | 1 | L.S. | $30,300.00 | $30,300.00 | $34,747.00 | $34,747.00 | $95,000.00 | $95,000.00 | ||||
| 56 | Seeding, Fertilizing and Mulching | 1 | L.S. | $20,200.00 | $20,200.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | ||||
| 57 | 6" Non-perforated PE Tubing | 700 | L.F. | $24.50 | $17,150.00 | $33.50 | $23,450.00 | $26.00 | $18,200.00 | ||||
| 58 | 6" x 6" x 6" PE Tees | 4 | Each | $340.00 | $1,360.00 | $537.60 | $2,150.40 | $740.00 | $2,960.00 | ||||
| 59 | 6" x 5' Steel Riser w/Trash Guard | 4 | Each | $785.00 | $3,140.00 | $1,166.20 | $4,664.80 | $1,200.00 | $4,800.00 | ||||
| 60 | 6" CMP with Animal Guards | 20 | L.F. | $44.00 | $880.00 | $170.80 | $3,416.00 | $57.00 | $1,140.00 | ||||
| $908,792.00 | $969,145.60 | $1,063,944.20 | |||||||||||
Shekar Engineering, Des Moines, IA
MPS Engineers, P.C. dba Kingston Services, P.C., Des Moines, IA
12/17/2025