IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Olofson Shooting Range  Date: 9/22/2016  Project No.  
  Training Center & Range Renovation  County:   POLK  Time: 11:00 a.m.  16-02-77-02

 

 
1
2
3
Estimated Cost: $728,786.00
Contractor: 
Vieco Dev. & Construction Co. Inc.
Funding Source: 75% Federal-PR, 25% REAP OS Acquisition & Development, 5180 SE 70th Rd


Saint Joseph MO  64507    
Plan Sets Requested: 0
Quantities
816-387-1884
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Grading1L.S.$38,000.00$38,000.00 $0.00 $0.00 
2Seeding, Fertilizing and Mulching4Acres$3,000.00$12,000.00 $0.00 $0.00 
3ScourStop Outlet Protection16S.F.$30.00$480.00 $0.00 $0.00 
48-inch Filter Sock100L.F.$5.00$500.00 $0.00 $0.00 
55-inch Reinforced PCC Sidewalk166.5S.Y.$52.00$8,658.00 $0.00 $0.00 
6Granular Subbase for PCC Sidewalk34Tons$40.00$1,360.00 $0.00 $0.00 
76-inch PVC SDR 35 Pipe98L.F.$12.00$1,176.00 $0.00 $0.00 
88-inch PVC SDR 35 Pipe261L.F.$14.00$3,654.00 $0.00 $0.00 
910-inch PVC SDR 35 Pipe198L.F.$16.00$3,168.00 $0.00 $0.00 
1012-inch Diameter Nyloplast Drain Basin3Each$1,280.00$3,840.00 $0.00 $0.00 
1110-inch Diameter Nyloplast Drain Basin6Each$1,100.00$6,600.00 $0.00 $0.00 
126-inch Diameter Rat Guard4Each$20.00$80.00 $0.00 $0.00 
1310-inch Diameter Rat Guard1Each$50.00$50.00 $0.00 $0.00 
14Replace Grate with Solid Manhole Lid1Each$820.00$820.00 $0.00 $0.00 
152-inch HDPE Water Pipe37L.F.$30.00$1,110.00 $0.00 $0.00 
162-inch Curb Stop1Each$700.00$700.00 $0.00 $0.00 
17Paint Striping and Markings1L.S.$1,500.00$1,500.00 $0.00 $0.00 
18Precast Concrete Parking Wheel Stops11Each$100.00$1,100.00 $0.00 $0.00 
19Signage-HC Signs for Parking Spaces1L.S.$700.00$700.00 $0.00 $0.00 
20Black PVC Coated Chain Link Fencing1L.S.$13,200.00$13,200.00 $0.00 $0.00 
21NPDES General Permit #2 & SWPPP1L.S.$6,500.00$6,500.00 $0.00 $0.00 
22Construction Staking1L.S.$6,000.00$6,000.00 $0.00 $0.00 
23Mobilization1L.S.$19,000.00$19,000.00 $0.00 $0.00 
24Electrical Service (Main Bldg & Stubs to Alternates)1L.S.$15,000.00$15,000.00 $0.00 $0.00 
25Training Center Building1L.S.$497,000.00$497,000.00 $0.00 $0.00 
      $642,196.00  $0.00  $0.00 
Alternate        
28Shooting Structure #1 (Incl. Interior Electrical)1L.S.$68,500.00$68,500.00 $0.00 $0.00 
Alternate        
29Road Gravel9.2Tons$40.00$368.00 $0.00 $0.00 
Alternate        
305-inch Reinforced PCC Sidewalk24S.Y.$60.00$1,440.00 $0.00 $0.00 
Alternate        
31Granular Subbase for PCC Sidewalk5Tons$40.00$200.00 $0.00 $0.00 
Alternate        
32Shooting Structure #2 (Incl. Interior Electrical)1L.S.$65,000.00$65,000.00 $0.00 $0.00 
Alternate        
33Road Gravel9.2Tons$40.00$368.00 $0.00 $0.00 
Alternate        
345-inch Reinforced PCC Sidewalk14S.Y.$70.00$980.00 $0.00 $0.00 
Alternate        
35Granular Subbase for PCC Sidewalk3Tons$40.00$120.00 $0.00 $0.00 
Alternate        
36Shooting Structure #3 (Incl. Interior Electrical)1L.S.$61,500.00$61,500.00 $0.00 $0.00 
Alternate        
37Road Gravel9.2Tons$40.00$368.00 $0.00 $0.00 
Alternate        
385-inch Reinforced PCC Sidewalk24S.Y.$70.00$1,680.00 $0.00 $0.00 
Alternate        
39Granular Subbase for PCC Sidewalk5Tons$40.00$200.00 $0.00 $0.00 
      $842,920.00  $0.00  $0.00 
 



 

5/19/2024