IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lacey-Keosauqua State Park  Date: 11/16/2017  Project No.  
  Campground Improvements  County:   VAN BUREN  Time: 11:00 a.m.  17-06-89-01

 

 
1
2
3
Estimated Cost: $480,000.00
Contractor: 
DeLong Construction, Inc.Smith Seeding Inc.McCulley Culvert, Inc.
Funding Source: 100% Infrastructure 2017, 1320 N 8th Ave
PO Box 488
219 N 1st St
3328 130th St
Washington IA  52353Eldridge IA  52748Barnes City IA  50027
Plan Sets Requested: 9
Quantities
319-653-3334563-285-2604641-634-2394
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$15,000.00$15,000.00 $25,000.00$25,000.00 $20,000.00$20,000.00 
2Tree Removal - 12" to 24" Dia.4Each$400.00$1,600.00 $175.00$700.00 $250.00$1,000.00 
3Tree Removal - 24" and Above Dia.16Each$500.00$8,000.00 $200.00$3,200.00 $375.00$6,000.00 
4Demolition1L.S.$3,350.00$3,350.00 $22,500.00$22,500.00 $8,000.00$8,000.00 
5Gravel Removal3340S.Y.$7.00$23,380.00 $3.00$10,020.00 $3.34$11,155.60 
6Pavement Removal206S.Y.$10.00$2,060.00 $9.00$1,854.00 $20.00$4,120.00 
7Sanitary Sewer Service Connection11Each$690.00$7,590.00 $358.00$3,938.00 $24.00$264.00 
8Sanitary Sewer Service, 4" Dia. PVC SDR 23.5468L.F.$20.00$9,360.00 $20.63$9,654.84 $2.50$1,170.00 
9RV Sanitary Sewer Cleanout Connection11Each$800.00$8,800.00 $421.00$4,631.00 $425.00$4,675.00 
102x2x1-Inch HDPE Tee12Each$340.00$4,080.00 $370.56$4,446.72 $75.00$900.00 
111-inch HDPE Pipe309L.F.$28.00$8,652.00 $13.26$4,097.34 $4.00$1,236.00 
122-inch HDPE Pipe307L.F.$33.00$10,131.00 $17.49$5,369.43 $7.00$2,149.00 
13Hydrant, Woodford Model S-3 - Campsite12Each$3,000.00$36,000.00 $2,113.00$25,356.00 $684.78$8,217.36 
14Hydrant, Woodford Model S-3 - Removal and Replacement5Each$3,500.00$17,500.00 $1,865.00$9,325.00 $684.78$3,423.90 
15Culvert, 24" Dia CMP24L.F.$42.00$1,008.00 $56.00$1,344.00 $40.28$966.72 
16Electrical Improvements1L.S.$86,000.00$86,000.00 $145,292.00$145,292.00 $215,000.00$215,000.00 
17PCC Sidewalk, 5" Depth Reinforced104S.Y.$55.00$5,720.00 $102.00$10,608.00 $70.00$7,280.00 
18PCC Gutter, 7" Depth50L.F.$40.00$2,000.00 $106.00$5,300.00 $75.00$3,750.00 
19HMA Pavement, 6" Depth86S.Y.$150.00$12,900.00 $174.00$14,964.00 $135.00$11,610.00 
20Campsite Preparation and Minor Grading42Each$905.00$38,010.00 $300.00$12,600.00 $1,000.00$42,000.00 
21Engineering Fabric5300S.Y.$2.00$10,600.00 $3.00$15,900.00 $4.00$21,200.00 
22Macadam Stone1450Tons$25.00$36,250.00 $18.00$26,100.00 $18.00$26,100.00 
233/8 Minus Stone100Tons$30.00$3,000.00 $10.50$1,050.00 $14.00$1,400.00 
24Class A Road Stone650Tons$29.00$18,850.00 $22.00$14,300.00 $16.00$10,400.00 
25Topsoil80C.Y.$25.00$2,000.00 $20.00$1,600.00 $5.00$400.00 
26Filter Sock, 8"400L.F.$3.00$1,200.00 $4.00$1,600.00 $4.00$1,600.00 
27Seeding, Fertilizing, and Mulching1L.S.$12,000.00$12,000.00 $7,000.00$7,000.00 $12,500.00$12,500.00 
28NPDES General Permit #2 & SWPPP1L.S.$1,500.00$1,500.00 $12,000.00$12,000.00 $6,000.00$6,000.00 
      $386,541.00  $399,750.33  $432,517.58 
 
4
5
6
Estimated Cost: $480,000.00
Contractor: 
K & A Excavating LLCMeyers Driveway
Funding Source: 100% Infrastructure 2017, 1521 330th Ave
1000 Cedar
PO Box 488

Wever IA  52658Keokuk IA  52632  
Plan Sets Requested: 9
Quantities
319-470-8804319-524-7329
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$35,000.00$35,000.00 $40,000.00$40,000.00 $0.00 
2Tree Removal - 12" to 24" Dia.4Each$800.00$3,200.00 $600.00$2,400.00 $0.00 
3Tree Removal - 24" and Above Dia.16Each$1,000.00$16,000.00 $1,200.00$19,200.00 $0.00 
4Demolition1L.S.$5,000.00$5,000.00 $10,000.00$10,000.00 $0.00 
5Gravel Removal3340S.Y.$8.50$28,390.00 $4.00$13,360.00 $0.00 
6Pavement Removal206S.Y.$15.00$3,090.00 $10.00$2,060.00 $0.00 
7Sanitary Sewer Service Connection11Each$650.00$7,150.00 $300.00$3,300.00 $0.00 
8Sanitary Sewer Service, 4" Dia. PVC SDR 23.5468L.F.$40.00$18,720.00 $25.00$11,700.00 $0.00 
9RV Sanitary Sewer Cleanout Connection11Each$750.00$8,250.00 $275.00$3,025.00 $0.00 
102x2x1-Inch HDPE Tee12Each$750.00$9,000.00 $200.00$2,400.00 $0.00 
111-inch HDPE Pipe309L.F.$30.00$9,270.00 $10.00$3,090.00 $0.00 
122-inch HDPE Pipe307L.F.$25.00$7,675.00 $12.00$3,684.00 $0.00 
13Hydrant, Woodford Model S-3 - Campsite12Each$2,100.00$25,200.00 $1,200.00$14,400.00 $0.00 
14Hydrant, Woodford Model S-3 - Removal and Replacement5Each$2,500.00$12,500.00 $1,200.00$6,000.00 $0.00 
15Culvert, 24" Dia CMP24L.F.$100.00$2,400.00 $50.00$1,200.00 $0.00 
16Electrical Improvements1L.S.$92,300.00$92,300.00 $183,700.00$183,700.00 $0.00 
17PCC Sidewalk, 5" Depth Reinforced104S.Y.$100.00$10,400.00 $80.00$8,320.00 $0.00 
18PCC Gutter, 7" Depth50L.F.$75.00$3,750.00 $100.00$5,000.00 $0.00 
19HMA Pavement, 6" Depth86S.Y.$135.00$11,610.00 $90.00$7,740.00 $0.00 
20Campsite Preparation and Minor Grading42Each$1,000.00$42,000.00 $500.00$21,000.00 $0.00 
21Engineering Fabric5300S.Y.$3.50$18,550.00 $2.00$10,600.00 $0.00 
22Macadam Stone1450Tons$23.00$33,350.00 $30.00$43,500.00 $0.00 
233/8 Minus Stone100Tons$17.50$1,750.00 $30.00$3,000.00 $0.00 
24Class A Road Stone650Tons$31.00$20,150.00 $30.00$19,500.00 $0.00 
25Topsoil80C.Y.$75.00$6,000.00 $60.00$4,800.00 $0.00 
26Filter Sock, 8"400L.F.$3.00$1,200.00 $4.00$1,600.00 $0.00 
27Seeding, Fertilizing, and Mulching1L.S.$6,750.00$6,750.00 $16,000.00$16,000.00 $0.00 
28NPDES General Permit #2 & SWPPP1L.S.$9,000.00$9,000.00 $15,000.00$15,000.00 $0.00 
      $447,655.00  $475,579.00  $0.00 
 



 