 Bids For:  Location:   Palisades-Kepler State Park  Date: 4/20/2017  Project No.  
  Campground Electrical Upgrade  County:   LINN  Time: 11:00 a.m.  17-06-57-02

 

 
1
2
3
Estimated Cost: $165,386.00
Contractor: 
F.L. Krapfl Inc.DeLancey ElectricVoltmer, Inc.
Funding Source: 100% Infrastructure 2017,
PO Box 303
600 W Main St
1732 Old Stage Rd
PO Box 200
Dyersville IA  52040Anamosa IA  52205Decorah IA  52101
Plan Sets Requested: 3
Quantities
563-875-8938319-462-4600563-382-9214
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$19,500.00$19,500.00 $16,080.00$16,080.00 $11,576.00$11,576.00 
2TRENCH, SINGLE CIRCUIT SECONDARY2070L.F.$9.00$18,630.00 $2.88$5,961.60 $6.57$13,599.90 
3DETECTABLE WARNING TAPE, 3" ELECTRICAL2070L.F.$0.23$476.10 $0.18$372.60 $0.30$621.00 
4ROADWAY CROSSING CONDUIT - SCHEDULE 80 PVC130L.F.$20.00$2,600.00 $21.96$2,854.80 $23.02$2,992.60 
5SINGLE CAMPSITE OUTLET POST (METALIC POWER CENTER) 50 AMP31Each$483.00$14,973.00 $554.00$17,174.00 $646.08$20,028.48 
6No. 8 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE262L.F.$0.36$94.32 $0.74$193.88 $1.08$282.96 
7No. 6 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE735L.F.$0.55$404.25 $1.02$749.70 $1.18$867.30 
8No. 4 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE453L.F.$0.76$344.28 $1.38$625.14 $1.25$566.25 
9No. 2 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE1083L.F.$1.23$1,332.09 $2.24$2,425.92 $1.44$1,559.52 
10No. 3 AWG SINGLE CONDUCTOR CABLE, TYPE USE678L.F.$1.56$1,057.68 $2.74$1,857.72 $2.10$1,423.80 
11No. 2 AWG SINGLE CONDUCTOR CABLE, TYPE USE786L.F.$1.54$1,210.44 $3.38$2,656.68 $2.05$1,611.30 
12No. 1 AWG SINGLE CONDUCTOR CABLE, TYPE USE930L.F.$1.83$1,701.90 $3.53$3,282.90 $2.39$2,222.70 
13No. 1/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE597L.F.$2.33$1,391.01 $4.04$2,411.88 $3.07$1,832.79 
14No. 3/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE2217L.F.$3.67$8,136.39 $4.55$10,087.35 $4.57$10,131.69 
15No. 4/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE537L.F.$4.18$2,244.66 $4.06$2,180.22 $5.25$2,819.25 
16No.250 AWG SINGLE CONDUCTOR CABLE, TYPE USE516L.F.$4.53$2,337.48 $5.56$2,868.96 $6.17$3,183.72 
17No. 300 AWG SINGLE CONDUCTOR CABLE, TYPE USE1338L.F.$5.65$7,559.70 $6.77$9,058.26 $7.75$10,369.50 
18REPLACE OLD PANEL WITH NEW 600 AMP DISTRIBUTION PANEL, COMPLETE1Each$11,375.00$11,375.00 $5,770.00$5,770.00 $8,129.07$8,129.07 
19REPLACE DRINKING FOUNTAIN INCLDG. CONCRETE BASE WITH HAWS PEDESTAL MODEL 3202G2Each$2,800.00$5,600.00 $2,121.00$4,242.00 $4,713.99$9,427.98 
      $100,968.30  $90,853.61  $103,245.81 
Alternate        
20EARTHFILL39C.Y.$15.00$585.00 $123.08$4,800.12 $45.77$1,785.03 
Alternate        
21GRANULAR SURFACING, 3/8 INCH MINUS CRUSHED LIME STONE (2" DEPTH)558Tons$11.00$6,138.00 $27.78$15,501.24 $21.91$12,225.78 
Alternate        
226-INCH 140 PCF GRANULAR BASE22Tons$25.00$550.00 $22.73$500.06 $28.61$629.42 
Alternate        
236-INCH NON-REINFORCHED ACC71S.Y.$61.00$4,331.00 $41.41$2,940.11 $78.03$5,540.13 
Alternate        
24REMOVE RAILROAD TIE EDGING & FILL VOID WITH 3/8 INCH MINUS CRUSHED LIME STONE38Each$188.00$7,144.00 $313.16$11,900.08 $148.96$5,660.48 
      $119,716.30  $126,495.22  $129,086.65 
 
4
5
6
Estimated Cost: $165,386.00
Contractor: 
Hawkeye Electrical Contractors
Funding Source: 100% Infrastructure 2017, 1710 Hawkeye Dr.


Hiawatha IA  52233    
Plan Sets Requested: 3
Quantities
319-743-9891
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$9,000.00$9,000.00 $0.00 $0.00 
2TRENCH, SINGLE CIRCUIT SECONDARY2070L.F.$8.64$17,884.80 $0.00 $0.00 
3DETECTABLE WARNING TAPE, 3" ELECTRICAL2070L.F.$0.25$517.50 $0.00 $0.00 
4ROADWAY CROSSING CONDUIT - SCHEDULE 80 PVC130L.F.$50.00$6,500.00 $0.00 $0.00 
5SINGLE CAMPSITE OUTLET POST (METALIC POWER CENTER) 50 AMP31Each$890.00$27,590.00 $0.00 $0.00 
6No. 8 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE262L.F.$2.00$524.00 $0.00 $0.00 
7No. 6 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE735L.F.$2.10$1,543.50 $0.00 $0.00 
8No. 4 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE453L.F.$1.00$453.00 $0.00 $0.00 
9No. 2 AWG GROUNDING CONDUCTOR CABLE. TYPE THW OR USE1083L.F.$1.90$2,057.70 $0.00 $0.00 
10No. 3 AWG SINGLE CONDUCTOR CABLE, TYPE USE678L.F.$1.30$881.40 $0.00 $0.00 
11No. 2 AWG SINGLE CONDUCTOR CABLE, TYPE USE786L.F.$2.30$1,807.80 $0.00 $0.00 
12No. 1 AWG SINGLE CONDUCTOR CABLE, TYPE USE930L.F.$1.85$1,720.50 $0.00 $0.00 
13No. 1/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE597L.F.$1.00$597.00 $0.00 $0.00 
14No. 3/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE2217L.F.$4.10$9,089.70 $0.00 $0.00 
15No. 4/0 AWG SINGLE CONDUCTOR CABLE, TYPE USE537L.F.$2.10$1,127.70 $0.00 $0.00 
16No.250 AWG SINGLE CONDUCTOR CABLE, TYPE USE516L.F.$0.95$490.20 $0.00 $0.00 
17No. 300 AWG SINGLE CONDUCTOR CABLE, TYPE USE1338L.F.$2.40$3,211.20 $0.00 $0.00 
18REPLACE OLD PANEL WITH NEW 600 AMP DISTRIBUTION PANEL, COMPLETE1Each$9,500.00$9,500.00 $0.00 $0.00 
19REPLACE DRINKING FOUNTAIN INCLDG. CONCRETE BASE WITH HAWS PEDESTAL MODEL 3202G2Each$5,950.00$11,900.00 $0.00 $0.00 
Alternate        
20EARTHFILL39C.Y.$115.00$4,485.00 $0.00 $0.00 
Alternate        
21GRANULAR SURFACING, 3/8 INCH MINUS CRUSHED LIME STONE (2" DEPTH)558Tons$62.00$34,596.00 $0.00 $0.00 
Alternate        
226-INCH 140 PCF GRANULAR BASE22Tons$160.00$3,520.00 $0.00 $0.00 
Alternate        
236-INCH NON-REINFORCHED ACC71S.Y.$90.00$6,390.00 $0.00 $0.00 
Alternate        
24REMOVE RAILROAD TIE EDGING & FILL VOID WITH 3/8 INCH MINUS CRUSHED LIME STONE38Each$345.00$13,110.00 $0.00 $0.00 
      $168,497.00  $0.00  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Hawkeye Electrical Contractors, Hiawatha, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.