IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lewis and Clark  Date: 5/26/2016  Project No.  
  Water Treatment Building  County:   MONONA  Time: 11:00 a.m.  13-01-67-03

 

 
1
2
3
Estimated Cost: $124,500.00
Contractor: 
Brunow Contracting, LLCVieco Development & Construction Co IncGrundman-Hicks, LLC
Funding Source: 100% Infrastructure 2012, 12 Scott St
5180 SE 70th Rd
1222 S 2nd St
Council Bluffs IA  51503St Joseph MO  64507Cherokee IA  51012
Plan Sets Requested: 4
Quantities
712-256-3661816-387-1884712-225-5179
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$22,774.00$22,774.00 $6,400.00$6,400.00 $15,000.00$15,000.00 
2CLEARING & GRUBBING1L.S.$5,000.00$5,000.00 $5,800.00$5,800.00 $2,000.00$2,000.00 
338’ X 22’ WATER TREAMENT BUILDING COMPLETE WITH GRADING1L.S.$92,000.00$92,000.00 $121,780.00$121,780.00 $129,000.00$129,000.00 
4COMPLETE BUILDING ELECTRICAL AND EJECTOR PUMP CONTROLS INCLUDING 200 AMP CONTROL PANEL, LIGHITING, HEATER, EXAUST FAN AND OUTLETS FOR OTHER EQUIPMENT 1L.S.$18,150.00$18,150.00 $41,600.00$41,600.00 $34,000.00$34,000.00 
5NEW ELECTRICAL SERVICE TO THE BULDING FROM 70 FT. WITH DISCONECT.1L.S.$4,200.00$4,200.00 $5,000.00$5,000.00 $2,000.00$2,000.00 
6SUMP AND SUBMERSIBLE PUMP INSIDE THE BUILDING, COMPLETE1L.S.$17,671.00$17,671.00 $4,800.00$4,800.00 $1,000.00$1,000.00 
7STUB OUTS 10’ BEYOND FOUNDATION AS SHOWN IN DRAWINGS1L.S.$3,200.00$3,200.00 $2,200.00$2,200.00 $6,000.00$6,000.00 
8SEED ALL DISTURBED AREAS1L.S.$1,000.00$1,000.00 $1,800.00$1,800.00 $1,000.00$1,000.00 
      $163,995.00  $189,380.00  $190,000.00 
 
 
4
5
6
Estimated Cost: $124,500.00
Contractor: 
Lessard Contracting Inc.
Funding Source: 100% Infrastructure 2012, 2300 Blvd of Champions


Sioux City IA  51111    
Plan Sets Requested: 4
Quantities
712-252-4131
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$16,933.00$16,933.00 $0.00 $0.00 
2CLEARING & GRUBBING1L.S.$1,600.00$1,600.00 $0.00 $0.00 
338’ X 22’ WATER TREAMENT BUILDING COMPLETE WITH GRADING1L.S.$131,385.00$131,385.00 $0.00 $0.00 
4COMPLETE BUILDING ELECTRICAL AND EJECTOR PUMP CONTROLS INCLUDING 200 AMP CONTROL PANEL, LIGHITING, HEATER, EXAUST FAN AND OUTLETS FOR OTHER EQUIPMENT 1L.S.$44,500.00$44,500.00 $0.00 $0.00 
5NEW ELECTRICAL SERVICE TO THE BULDING FROM 70 FT. WITH DISCONECT.1L.S.$5,500.00$5,500.00 $0.00 $0.00 
6SUMP AND SUBMERSIBLE PUMP INSIDE THE BUILDING, COMPLETE1L.S.$4,133.00$4,133.00 $0.00 $0.00 
7STUB OUTS 10’ BEYOND FOUNDATION AS SHOWN IN DRAWINGS1L.S.$720.00$720.00 $0.00 $0.00 
8SEED ALL DISTURBED AREAS1L.S.$1,500.00$1,500.00 $0.00 $0.00 
      $206,271.00  $0.00  $0.00 
 



 

4/4/2025