IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   McIntosh Woods  Date: 5/18/2017  Project No.  
  Pavement Repair  County:   CERRO GORDO  Time: 11:00 a.m.  16-03-17-02

 

 
1
2
3
Estimated Cost: $70,000.00
Contractor: 
Heartland Asphalt, Inc.
Funding Source: 96% Park & Institutional Road Fund, 4% REAP OS Acquisition & Development, 2601 S Federal Ave


Mason City IA  50401    
Plan Sets Requested: 2
Quantities
641-424-1733
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
12102 - SPECIAL BACKFILL10.94Tons$45.00$492.30 $0.00 $0.00 
22104 - EXCAVATION, CLASS 10, CHANNEL, WASTE 9C.Y.$150.00$1,350.00 $0.00 $0.00 
32306 - BITUMINOUS FOG SEAL (PAVEMENT)1793GAL.$6.10$10,937.30 $0.00 $0.00 
42312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE18.2Tons$39.00$709.80 $0.00 $0.00 
52401 - REMOVALS, AS PER PLAN 3Each$1,750.00$5,250.00 $0.00 $0.00 
62416 - APRONS, CONCRETE, 24 IN. DIA. 1Each$2,000.00$2,000.00 $0.00 $0.00 
72416 - CULVERT, 3750D CONCRETE ROADWAY PIPE, 24 IN. DIA. 24L.F.$225.00$5,400.00 $0.00 $0.00 
82417 - CULVERTS, TRENCHED, POLYVINYL CHLORIDE PIPE (PVC), 18 IN. 76L.F.$95.00$7,220.00 $0.00 $0.00 
92507 - EROSION STONE16.8Tons$55.00$924.00 $0.00 $0.00 
102518 - SAFETY CLOSURE9Each$100.00$900.00 $0.00 $0.00 
112528 - TRAFFIC CONTROL1L.S.$2,000.00$2,000.00 $0.00 $0.00 
122528 - FLAGGERS14Each$350.00$4,900.00 $0.00 $0.00 
132529 - PATCHES, FULL-DEPTH FINISH, BY AREA66.2S.Y.$97.00$6,421.40 $0.00 $0.00 
142529 - PATCHES, FULL-DEPTH FINISH, BY COUNT6Each$90.00$540.00 $0.00 $0.00 
152533 - MOBILIZATION1L.S.$8,000.00$8,000.00 $0.00 $0.00 
162540 - LONGITUDINAL JOINT REPAIR265L.F.$14.00$3,710.00 $0.00 $0.00 
172543 - TRANSVERSE JOINT REPAIR21.6Tons$384.60$8,307.36 $0.00 $0.00 
182544 - CLEANING AND FILLING CRACKS (PAVEMENT MAINTENANCE)1.1MI.$7,900.00$8,690.00 $0.00 $0.00 
192544 - HOT MIX ASPHALT FOR CRACK FILLING 1.5Tons$261.00$391.50 $0.00 $0.00 
202544 - FILLER MATERIAL (MAINTENANCE)100GAL.$5.00$500.00 $0.00 $0.00 
      $78,643.66  $0.00  $0.00 
 



 

5/1/2024