IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Manawa  Date: 2/16/2017  Project No.  
  Picnic Area  County:   POTTAWATTAMIE  Time: 11:00 a.m.  16-04-78-01

 

 
1
2
3
Estimated Cost: $1,543,000.00
Contractor: 
Meco-Henne Contracting, Inc.Carley Construction, LLCAndersen Construction Company
Funding Source: 40% Infrastructure, 20% Park & Institutional Road Fund, 40% Federal-Land and Water Conservation Fund, 4140 S 87th St
421 E Broadway, Ste A
3125 S 11th St
Omaha NE  68127Council Bluffs IA  51503Council Bluffs IA  51501
Plan Sets Requested: 3
Quantities
402-339-8127712-256-5818712-366-2255
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$2,200.00$2,200.00 $5,000.00$5,000.00 $0.00$0.00 
2Remove Existing Roadway Pavement9973S.Y.$8.25$82,277.25 $10.00$99,730.00 $8.96$89,358.08 
3Remove Existing Trail17S.Y.$22.00$374.00 $20.00$340.00 $7.47$126.99 
4Remove Existing Sidewalk219S.Y.$16.50$3,613.50 $9.75$2,135.25 $7.58$1,660.02 
5Remove Existing Gravel Parking210.9S.Y.$16.50$3,479.85 $3.00$632.70 $5.74$1,210.566 
6Remove Existing Paved Parking11159.2S.Y.$7.70$85,925.84 $4.25$47,426.60 $8.84$98,647.328 
7Remove Camp Pads6069S.Y.$5.50$33,379.50 $1.50$9,103.50 $5.17$31,376.73 
8Remove Existing Hydrants and Posts10Each$55.00$550.00 $210.00$2,100.00 $803.70$8,037.00 
9Abandon Existing Sanitary Sewer Pipe264L.F.$4.40$1,161.60 $8.00$2,112.00 $4.59$1,211.76 
10Remove Existing Sanitary Sewer Manholes1Each$962.50$962.50 $800.00$800.00 $1,378.00$1,378.00 
11Remove Existing Sanitary Sewer Pipe, 6" 210L.F.$4.40$924.00 $6.00$1,260.00 $8.04$1,688.40 
12Remove Existing Water Line729L.F.$5.50$4,009.50 $6.00$4,374.00 $10.33$7,530.57 
13Remove Existing Electrical Line200L.F.$5.43$1,086.00 $2.75$550.00 $5.42$1,084.00 
14Remove Existing Dump Station1L.S.$1,100.00$1,100.00 $2,500.00$2,500.00 $8,611.00$8,611.00 
15Demolition1L.S.$17,050.00$17,050.00 $12,500.00$12,500.00 $11,482.00$11,482.00 
16Sanitary Sewer Main, 6" Schedule 40 PVC225L.F.$24.20$5,445.00 $43.50$9,787.50 $45.93$10,334.25 
17Water Main, 2" HDPE1810L.F.$24.20$43,802.00 $21.50$38,915.00 $9.19$16,633.90 
18Hydrants2Each$1,705.00$3,410.00 $2,400.00$4,800.00 $2,985.50$5,971.00 
19Design Guide Shelter, Slab and Electric  1Each$211,900.00$211,900.00 $227,500.00$227,500.00 $247,292.00$247,292.00 
20Design Guide Restroom, Slab and MEP    1Each$138,000.00$138,000.00 $203,500.00$203,500.00 $185,320.00$185,320.00 
21Precast Concrete Double Vault1Each$54,459.79$54,459.79 $67,500.00$67,500.00 $62,542.00$62,542.00 
22Pilot Rock Grill Q3-2460 B8 Surface Mount Grill with Model S7 2Each$1,091.74$2,183.48 $2,000.00$4,000.00 $982.50$1,965.00 
23Contour 6’ Redwood Bench with Powder Coated (Black) Surface Mount Frame5Each$696.61$3,483.05 $1,090.00$5,450.00 $707.80$3,539.00 
24Furnish and Install Light Fixture2Each$1,179.20$2,358.40 $910.00$1,820.00 $1,176.50$2,353.00 
25Light Pole and Base, Complete2Each$3,034.90$6,069.80 $1,715.00$3,430.00 $3,029.00$6,058.00 
26Electrical Line610L.F.$7.77$4,739.70 $11.35$6,923.50 $7.75$4,727.50 
27Urban Seeding, Fertilizing and Mulching2.6Acres$1,933.46$5,026.996 $3,500.00$9,100.00 $2,124.23$5,522.998 
28Native Grass Seeding, Fertilizing and Mulching4.6Acres$5,467.00$25,148.20 $4,550.00$20,930.00 $2,755.65$12,675.99 
29Class "A" Crushed Stone37Tons$27.50$1,017.50 $27.25$1,008.25 $45.16$1,670.92 
30Special Backfill896C.Y.$57.20$51,251.20 $46.00$41,216.00 $59.42$53,240.32 
31Roadway Pavement, PCC, 7"428.4S.Y.$41.80$17,907.12 $38.60$16,536.24 $45.23$19,376.532 
32Shoulder Construction, Earth4STA.$1,100.00$4,400.00 $125.00$500.00 $304.25$1,217.00 
33Sidewalk, PCC, 5"125S.Y.$29.70$3,712.50 $39.00$4,875.00 $39.04$4,880.00 
34Parking Lot, PCC, 6"4658S.Y.$31.90$148,590.20 $34.25$159,536.50 $44.01$204,998.58 
35Detectable Warning Panel96S.F.$20.62$1,979.52 $36.50$3,504.00 $33.01$3,168.96 
36Signing4Each$655.76$2,623.04 $420.00$1,680.00 $746.25$2,985.00 
37Painted Pavement Markings, Waterborne/Solvent - White26STA.$49.92$1,297.92 $180.00$4,680.00 $291.92$7,589.92 
38Excavation, Class 10, Roadway and Borrow370C.Y.$27.50$10,175.00 $50.00$18,500.00 $17.07$6,315.90 
39Embankment-In-Place654C.Y.$42.90$28,056.60 $25.00$16,350.00 $17.22$11,261.88 
40Erosion Control2076L.F.$2.64$5,480.64 $3.10$6,435.60 $4.59$9,528.84 
41Drain-Down Pit1L.S.$2,557.50$2,557.50 $3,750.00$3,750.00 $8,611.00$8,611.00 
42Full Depth HMA Finish Pacthes by Sy. Yd.52S.Y.$57.20$2,974.40 $127.00$6,604.00 $68.88$3,581.76 
43Full Depth HMA Finish Joint Pacthes by Count2Each$514.80$1,029.60 $695.50$1,391.00 $172.00$344.00 
44Subbase Repair52S.Y.$5.50$286.00 $24.00$1,248.00 $30.37$1,579.24 
45Heavy Jet Cleaning, Sanitary Sewer265L.F.$4.15$1,099.75 $4.00$1,060.00 $4.33$1,147.45 
46Furnish and Install Electric Meter1Each$770.00$770.00 $910.00$910.00 $769.00$769.00 
47Construction Staking1L.S.$4,579.86$4,579.86 $8,400.00$8,400.00 $9,186.00$9,186.00 
48Mobilization1L.S.$89,900.00$89,900.00 $55,000.00$55,000.00 $22,964.00$22,964.00 
49Water Main, 1" HDPE463L.F.$19.80$9,167.40 $18.50$8,565.50 $9.19$4,254.97 
50Rural Seeding, Fertilizing and Mulching2.8Acres$4,829.00$13,521.20 $2,800.00$7,840.00 $2,066.79$5,787.012 
      $1,146,496.906  $1,163,810.14  $1,212,795.366 
 
4
5
6
Estimated Cost: $1,543,000.00
Contractor: 
Leffler Dirtworks, LLCMidwest DCM, Inc.
Funding Source: 40% Infrastructure, 20% Park & Institutional Road Fund, 40% Federal-Land and Water Conservation Fund, 2272 320th St
8719 S 135th St, Ste. 100

Oskaloosa IA  52577Omaha NE  68138  
Plan Sets Requested: 3
Quantities
641-226-2231402-537-3077
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$7,000.00$7,000.00 $17,700.00$17,700.00 $0.00 
2Remove Existing Roadway Pavement9973S.Y.$9.00$89,757.00 $7.81$77,889.13 $0.00 
3Remove Existing Trail17S.Y.$100.00$1,700.00 $10.59$180.03 $0.00 
4Remove Existing Sidewalk219S.Y.$20.00$4,380.00 $7.50$1,642.50 $0.00 
5Remove Existing Gravel Parking210.9S.Y.$6.00$1,265.40 $6.25$1,318.125 $0.00 
6Remove Existing Paved Parking11159.2S.Y.$8.00$89,273.60 $7.82$87,264.944 $0.00 
7Remove Camp Pads6069S.Y.$6.00$36,414.00 $5.17$31,376.73 $0.00 
8Remove Existing Hydrants and Posts10Each$300.00$3,000.00 $404.40$4,044.00 $0.00 
9Abandon Existing Sanitary Sewer Pipe264L.F.$50.00$13,200.00 $11.14$2,940.96 $0.00 
10Remove Existing Sanitary Sewer Manholes1Each$5,000.00$5,000.00 $4,922.00$4,922.00 $0.00 
11Remove Existing Sanitary Sewer Pipe, 6" 210L.F.$8.00$1,680.00 $36.14$7,589.40 $0.00 
12Remove Existing Water Line729L.F.$7.00$5,103.00 $36.00$26,244.00 $0.00 
13Remove Existing Electrical Line200L.F.$7.00$1,400.00 $3.13$626.00 $0.00 
14Remove Existing Dump Station1L.S.$5,000.00$5,000.00 $8,625.00$8,625.00 $0.00 
15Demolition1L.S.$16,000.00$16,000.00 $25,000.00$25,000.00 $0.00 
16Sanitary Sewer Main, 6" Schedule 40 PVC225L.F.$20.00$4,500.00 $36.00$8,100.00 $0.00 
17Water Main, 2" HDPE1810L.F.$6.00$10,860.00 $46.00$83,260.00 $0.00 
18Hydrants2Each$3,000.00$6,000.00 $1,200.00$2,400.00 $0.00 
19Design Guide Shelter, Slab and Electric  1Each$175,000.00$175,000.00 $253,156.00$253,156.00 $0.00 
20Design Guide Restroom, Slab and MEP    1Each$155,000.00$155,000.00 $304,905.00$304,905.00 $0.00 
21Precast Concrete Double Vault1Each$55,000.00$55,000.00 $60,100.00$60,100.00 $0.00 
22Pilot Rock Grill Q3-2460 B8 Surface Mount Grill with Model S7 2Each$900.00$1,800.00 $714.00$1,428.00 $0.00 
23Contour 6’ Redwood Bench with Powder Coated (Black) Surface Mount Frame5Each$600.00$3,000.00 $998.20$4,991.00 $0.00 
24Furnish and Install Light Fixture2Each$2,250.00$4,500.00 $1,326.00$2,652.00 $0.00 
25Light Pole and Base, Complete2Each$3,250.00$6,500.00 $1,926.00$3,852.00 $0.00 
26Electrical Line610L.F.$20.00$12,200.00 $12.72$7,759.20 $0.00 
27Urban Seeding, Fertilizing and Mulching2.6Acres$3,500.00$9,100.00 $1,524.23$3,962.998 $0.00 
28Native Grass Seeding, Fertilizing and Mulching4.6Acres$4,000.00$18,400.00 $1,920.65$8,834.99 $0.00 
29Class "A" Crushed Stone37Tons$25.00$925.00 $60.00$2,220.00 $0.00 
30Special Backfill896C.Y.$45.00$40,320.00 $8.34$7,472.64 $0.00 
31Roadway Pavement, PCC, 7"428.4S.Y.$55.00$23,562.00 $47.96$20,546.064 $0.00 
32Shoulder Construction, Earth4STA.$3,000.00$12,000.00 $14,375.00$57,500.00 $0.00 
33Sidewalk, PCC, 5"125S.Y.$55.00$6,875.00 $45.00$5,625.00 $0.00 
34Parking Lot, PCC, 6"4658S.Y.$52.00$242,216.00 $41.40$192,841.20 $0.00 
35Detectable Warning Panel96S.F.$50.00$4,800.00 $45.00$4,320.00 $0.00 
36Signing4Each$2,000.00$8,000.00 $437.50$1,750.00 $0.00 
37Painted Pavement Markings, Waterborne/Solvent - White26STA.$250.00$6,500.00 $5,083.00$132,158.00 $0.00 
38Excavation, Class 10, Roadway and Borrow370C.Y.$4.00$1,480.00 $17.84$6,600.80 $0.00 
39Embankment-In-Place654C.Y.$18.50$12,099.00 $18.00$11,772.00 $0.00 
40Erosion Control2076L.F.$8.00$16,608.00 $5.44$11,293.44 $0.00 
41Drain-Down Pit1L.S.$8,000.00$8,000.00 $7,475.00$7,475.00 $0.00 
42Full Depth HMA Finish Pacthes by Sy. Yd.52S.Y.$90.00$4,680.00 $7,375.00$383,500.00 $0.00 
43Full Depth HMA Finish Joint Pacthes by Count2Each$900.00$1,800.00 $812.50$1,625.00 $0.00 
44Subbase Repair52S.Y.$90.00$4,680.00 $48.25$2,509.00 $0.00 
45Heavy Jet Cleaning, Sanitary Sewer265L.F.$60.00$15,900.00 $21.46$5,686.90 $0.00 
46Furnish and Install Electric Meter1Each$10,000.00$10,000.00 $1,066.00$1,066.00 $0.00 
47Construction Staking1L.S.$7,500.00$7,500.00 $10,000.00$10,000.00 $0.00 
48Mobilization1L.S.$165,000.00$165,000.00 $91,411.00$91,411.00 $0.00 
49Water Main, 1" HDPE463L.F.$5.00$2,315.00 $23.00$10,649.00 $0.00 
50Rural Seeding, Fertilizing and Mulching2.8Acres$3,500.00$9,800.00 $1,253.57$3,509.996 $0.00 
      $1,347,093.00  $2,014,295.047  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Midwest DCM, Inc., Omaha, NE
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.

4/1/2026