IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Rock Creek State Park  Date: 4/13/2017  Project No.  
  Boat Ramp Repairs  County:   JASPER  Time: 3:00 p.m.  16-05-50-01

 

 
1
2
3
Estimated Cost: $49,558.00
Contractor: 
Boulder Contracting, LLCStrand Excavating Inc
Funding Source: 68% Marine Fuel Tax -Minors, 32% Federal-Other, 25789 N Ave
13895 Hwy 6E

Grundy Center IA  50638Grinnell IA  50112  
Plan Sets Requested: 0
Quantities
319-269-8680641-498-7373
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Articulated Concrete Block @ Beach Ramp208S.F.$30.00$6,240.00 $23.00$4,784.00 $0.00 
2Class "A" Crushed Stone @ Beach Ramp16Tons$40.00$640.00 $92.25$1,476.00 $0.00 
3Dock Connection Pad @ Beach Ramp1L.S.$750.00$750.00 $540.00$540.00 $0.00 
4Demolitions @ Beach Ramp1L.S.$600.00$600.00 $600.00$600.00 $0.00 
5Sidewalk @ Beach Ramp23.33S.Y.$60.00$1,399.80 $78.60$1,833.738 $0.00 
6Class "E" Riprap @ Beach Ramp16Tons$60.00$960.00 $70.00$1,120.00 $0.00 
7Articulated Concrete Block @ NW Ramp208S.F.$30.00$6,240.00 $23.00$4,784.00 $0.00 
8Class "A" Crushed Stone @ NW Ramp16Tons$40.00$640.00 $92.25$1,476.00 $0.00 
9Demolitions @ NW Ramp1L.S.$1,800.00$1,800.00 $2,350.00$2,350.00 $0.00 
10Sidewalk @ NW Ramp56.67S.Y.$60.00$3,400.20 $73.90$4,187.913 $0.00 
11Class "E" Riprap @ NW Ramp16Tons$60.00$960.00 $70.00$1,120.00 $0.00 
12Ramp Patches @ NW Ramp1L.S.$1,500.00$1,500.00 $1,825.00$1,825.00 $0.00 
13Articulated Concrete Block @ Campground Ramp112S.F.$35.00$3,920.00 $30.45$3,410.40 $0.00 
14Class "A" Crushed Stone @ Campground Ramp16Tons$40.00$640.00 $92.25$1,476.00 $0.00 
15Dock Connection Pad @ Campground Ramp1L.S.$750.00$750.00 $540.00$540.00 $0.00 
16Demolitions @ Campground Ramp1L.S.$800.00$800.00 $950.00$950.00 $0.00 
17Sidewalk @ Campground Ramp32.22S.Y.$60.00$1,933.20 $80.40$2,590.488 $0.00 
18Class "E" Riprap @ Campground Ramp16Tons$60.00$960.00 $70.00$1,120.00 $0.00 
19Articulated Concrete Block @ South Ramp128S.F.$32.00$4,096.00 $23.00$2,944.00 $0.00 
20Class "A" Crushed Stone @ South Ramp16Tons$40.00$640.00 $92.25$1,476.00 $0.00 
21Class "E" Riprap @ South Ramp16Tons$60.00$960.00 $70.00$1,120.00 $0.00 
22Mobilization & Site Restoration1L.S.$5,500.00$5,500.00 $5,500.00$5,500.00 $0.00 
      $45,329.20  $47,223.539  $0.00 
 



 