IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Snipe Meadow Wetland  Date: 1/28/2016  Project No.  
  Snipe Meadow Water Control Structure Replacement  County:   EMMET  Time: 3:00 p.m.  15-01-32-02

 

 
1
2
3
Estimated Cost: $33,700.00
Contractor: 
Valley Contracting, Inc.Healy ExcavatingHymbaugh Construction
Funding Source: 100% Federal-NAWCA, 1850 Hwy 4 South
3483 Perkins Ave
821 Quiet Harbor
Estherville IA  51334Lake View IA  51450Creston IA  50801
Plan Sets Requested: 0
Quantities
712-362-4969712-665-4500641-340-0232
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$1,500.00$1,500.00 $7,000.00$7,000.00 $4,275.00$4,275.00 
2Remove Existing Structure and Base1L.S.$2,000.00$2,000.00 $650.00$650.00 $3,000.00$3,000.00 
3Dike Earthwork (Dike Excavation & Spillway Fill)331C.Y.$10.00$3,310.00 $6.75$2,234.25 $15.00$4,965.00 
4Channel Excavation133C.Y.$10.00$1,330.00 $7.00$931.00 $20.00$2,660.00 
5Sheet Pile (Install Only)1006S.F.$12.00$12,072.00 $13.50$13,581.00 $15.00$15,090.00 
6Sheet Pile Cap (Install Only)72L.F.$40.00$2,880.00 $95.00$6,840.00 $40.00$2,880.00 
7Stoplog Channel Guides (Install Only)1L.S.$1,100.00$1,100.00 $950.00$950.00 $1,000.00$1,000.00 
8Locking Rod1Each$135.00$135.00 $200.00$200.00 $1,000.00$1,000.00 
9Class E Revetment175Tons$52.00$9,100.00 $59.00$10,325.00 $60.00$10,500.00 
10Engineering Fabric161S.Y.$2.50$402.50 $3.00$483.00 $10.00$1,610.00 
11Seeding and Mulching1L.S.$1,200.00$1,200.00 $1,500.00$1,500.00 $3,000.00$3,000.00 
      $35,029.50  $44,694.25  $49,980.00 
 
 
4
5
6
Estimated Cost: $33,700.00
Contractor: 
Beemer CompaniesL.A. Carlson Contracting, Inc.
Funding Source: 100% Federal-NAWCA, 1988 135th St
20984 C-43

Fairmont MN  56031Merrill IA  51038  
Plan Sets Requested: 0
Quantities
507-235-6779712-239-3195
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$5,000.00$5,000.00 $10,000.00$10,000.00 $0.00 
2Remove Existing Structure and Base1L.S.$4,000.00$4,000.00 $2,000.00$2,000.00 $0.00 
3Dike Earthwork (Dike Excavation & Spillway Fill)331C.Y.$15.00$4,965.00 $14.00$4,634.00 $0.00 
4Channel Excavation133C.Y.$20.00$2,660.00 $10.00$1,330.00 $0.00 
5Sheet Pile (Install Only)1006S.F.$10.00$10,060.00 $12.00$12,072.00 $0.00 
6Sheet Pile Cap (Install Only)72L.F.$85.00$6,120.00 $30.00$2,160.00 $0.00 
7Stoplog Channel Guides (Install Only)1L.S.$1,000.00$1,000.00 $2,500.00$2,500.00 $0.00 
8Locking Rod1Each$500.00$500.00 $500.00$500.00 $0.00 
9Class E Revetment175Tons$75.00$13,125.00 $62.50$10,937.50 $0.00 
10Engineering Fabric161S.Y.$3.00$483.00 $5.00$805.00 $0.00 
11Seeding and Mulching1L.S.$3,000.00$3,000.00 $5,000.00$5,000.00 $0.00 
      $50,913.00  $51,938.50  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Hymbaugh Construction, Creston, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.

12/23/2025