IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Darling State Park  Date: 2/18/2016  Project No.  
  Cabin Road Construction  County:   WASHINGTON  Time: 11:00 a.m.  15-06-92-06

 

 
1
2
3
Estimated Cost: $661,683.00
Contractor: 
DeLong Construction, Inc.J & L Construction, LLCMuscatine Bridge Co., Inc.
Funding Source: 97% Infrastructure 2016, 1% Park & Institutional Road Fund, 1% Marine Fuel Tax, 1% Federal-Boat Safety (Coast Guard)1320 N 8th Ave
1971 Lexington Blvd

PO Box 950
Washington IA  52353Washington IA  52353Muscatine IA  52761
Plan Sets Requested: 9
Quantities
319-653-3334319-653-3597563-263-6032
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing-Cabin Access Road & West Spur1L.S.$2,750.00$2,750.00 $4,800.00$4,800.00 $3,800.00$3,800.00 
2Clearing and Grubbing-Non Road Areas1L.S.$7,500.00$7,500.00 $6,000.00$6,000.00 $5,700.00$5,700.00 
3Full Depth Saw Cut46L.F.$11.00$506.00 $6.00$276.00 $5.00$230.00 
4HMA Pavement Removal1214S.Y.$5.00$6,070.00 $6.00$7,284.00 $9.00$10,926.00 
5PCC Pavement Removal48S.Y.$10.00$480.00 $15.00$720.00 $9.00$432.00 
6Demolition-2 Existing Culverts & Pit Latrine1L.S.$5,800.00$5,800.00 $5,100.00$5,100.00 $3,200.00$3,200.00 
7Grading-Cabin Access Road & West Spur1L.S.$9,875.00$9,875.00 $23,500.00$23,500.00 $10,120.00$10,120.00 
8Grading-Non Road Areas1L.S.$10,000.00$10,000.00 $18,100.00$18,100.00 $7,900.00$7,900.00 
98-inch Filter Sock88L.F.$3.00$264.00 $7.50$660.00 $6.00$528.00 
10ScourStop Outlet Protection48S.F.$15.50$744.00 $28.75$1,380.00 $20.00$960.00 
11Special Backfill-Roadways1027Tons$17.85$18,331.95 $20.75$21,310.25 $20.00$20,540.00 
127-inch Non-Reinforced PCC6237S.Y.$34.00$212,058.00 $36.00$224,532.00 $43.60$271,933.20 
136-inch Non-Reinforced PCC669.2S.Y.$31.50$21,079.80 $35.50$23,756.60 $33.00$22,083.60 
145-inch Reinforced PCC Sidewalk425S.Y.$41.00$17,425.00 $39.75$16,893.75 $65.25$27,731.25 
155-inch Non-Reinforced PCC Trail48S.Y.$38.00$1,824.00 $36.00$1,728.00 $62.50$3,000.00 
165-inch Reinforced PCC Trail1675.9S.Y.$35.50$59,494.45 $34.50$57,818.55 $44.00$73,739.60 
176-inch Standard Curb764L.F.$5.00$3,820.00 $16.00$12,224.00 $2.60$1,986.40 
18Granular Subbase-Non Road Pavement Areas942.1Tons$24.00$22,610.40 $19.75$18,606.475 $26.00$24,494.60 
194-inch PVC SDR 35 Pipe60L.F.$19.50$1,170.00 $32.00$1,920.00 $6.50$390.00 
2012-inch RCP Class III148L.F.$49.00$7,252.00 $43.50$6,438.00 $62.00$9,176.00 
2112-inch RCP Class III FES W/Footing & Apron Guards5Each$2,500.00$12,500.00 $1,710.00$8,550.00 $1,300.00$6,500.00 
2215-inch RCP Class III185L.F.$53.00$9,805.00 $45.00$8,325.00 $62.75$11,608.75 
2315-inch RCP Class III FES W/Footing & Apron Guards1Each$2,675.00$2,675.00 $2,775.00$2,775.00 $1,385.00$1,385.00 
24SW-501 Single Grate Intake W/SW-603 Type 'R' Casting2Each$3,080.00$6,160.00 $1,235.00$2,470.00 $2,725.00$5,450.00 
25SW-503 Single Intake W/MH W/SW-602 Type "E' & SW-603 Type 'R' Castings1Each$4,625.00$4,625.00 $1,865.00$1,865.00 $4,560.00$4,560.00 
26Paint Striping-Cabin & Sw Parking, HC Markings, & 2 Truncated Domes1L.S.$495.00$495.00 $1,720.00$1,720.00 $2,000.00$2,000.00 
27Precast Concrete Parking Wheel Stops18Each$145.00$2,610.00 $80.00$1,440.00 $145.00$2,610.00 
28Signage-HC Signs for Parking Spaces, Road Closure, & 2 Trail Stop Signs1L.S.$1,725.00$1,725.00 $1,200.00$1,200.00 $1,725.00$1,725.00 
29Utility Adjustments-Cabin Area1L.S.$5,500.00$5,500.00 $2,500.00$2,500.00 $1,425.00$1,425.00 
30Oil & Sand Separator-Boat Ramp Parking Area1Each$17,900.00$17,900.00 $29,000.00$29,000.00 $26,375.00$26,375.00 
31Trench Drain-Boat Ramp Parking Area19L.F.$160.00$3,040.00 $100.00$1,900.00 $90.00$1,710.00 
32Paint Striping of Boat Ramp Parking Area Spaces675L.F.$1.40$945.00 $0.75$506.25 $1.25$843.75 
33Handicap Parking Space Pavement Marking-Boat Ramp Parking Location1Each$85.00$85.00 $78.00$78.00 $85.00$85.00 
34Handicap Parking Cross Hatching-Boat Ramp Parking Location1Each$250.00$250.00 $65.00$65.00 $250.00$250.00 
35Stop Sign @ Boat Ramp Parking Area Exit1Each$200.00$200.00 $450.00$450.00 $200.00$200.00 
36Single Pit Latrine, Boat Ramp Parking Area1Each$35,500.00$35,500.00 $33,500.00$33,500.00 $36,000.00$36,000.00 
37NPDES General Permit #2 & SWPPP1L.S.$1,650.00$1,650.00 $2,500.00$2,500.00 $3,500.00$3,500.00 
38Finish Grading-Access Road & West Spur1L.S.$5,400.00$5,400.00 $10,000.00$10,000.00 $9,250.00$9,250.00 
39Finish Grading-Non Road Areas1L.S.$7,200.00$7,200.00 $8,600.00$8,600.00 $11,500.00$11,500.00 
40Seeding, Fertilizing and Mulching-Access Road & West Spur1L.S.$5,600.00$5,600.00 $6,150.00$6,150.00 $5,000.00$5,000.00 
41Seeding, Fertilizing and Mulching-Non Road Areas1L.S.$5,600.00$5,600.00 $7,100.00$7,100.00 $3,500.00$3,500.00 
42Construction Staking-Access Road & West Spur1L.S.$6,450.00$6,450.00 $10,000.00$10,000.00 $10,000.00$10,000.00 
43Construction Staking-Non Road Areas1L.S.$6,450.00$6,450.00 $5,000.00$5,000.00 $5,000.00$5,000.00 
44Mobilization1L.S.$28,500.00$28,500.00 $29,000.00$29,000.00 $0.00$0.00 
      $579,919.60  $627,741.875  $649,348.15 
 
4
5
6
Estimated Cost: $661,683.00
Contractor: 
Spring Lake Construction
Funding Source: 97% Infrastructure 2016, 1% Park & Institutional Road Fund, 1% Marine Fuel Tax, 1% Federal-Boat Safety (Coast Guard)4123 NW 95th Place


Polk City IA  50226    
Plan Sets Requested: 9
Quantities
712-830-4515
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing-Cabin Access Road & West Spur1L.S.$14,000.00$14,000.00 $0.00 $0.00 
2Clearing and Grubbing-Non Road Areas1L.S.$10,000.00$10,000.00 $0.00 $0.00 
3Full Depth Saw Cut46L.F.$20.00$920.00 $0.00 $0.00 
4HMA Pavement Removal1214S.Y.$6.00$7,284.00 $0.00 $0.00 
5PCC Pavement Removal48S.Y.$12.00$576.00 $0.00 $0.00 
6Demolition-2 Existing Culverts & Pit Latrine1L.S.$1,400.00$1,400.00 $0.00 $0.00 
7Grading-Cabin Access Road & West Spur1L.S.$17,000.00$17,000.00 $0.00 $0.00 
8Grading-Non Road Areas1L.S.$11,000.00$11,000.00 $0.00 $0.00 
98-inch Filter Sock88L.F.$2.00$176.00 $0.00 $0.00 
10ScourStop Outlet Protection48S.F.$17.00$816.00 $0.00 $0.00 
11Special Backfill-Roadways1027Tons$16.00$16,432.00 $0.00 $0.00 
127-inch Non-Reinforced PCC6237S.Y.$42.00$261,954.00 $0.00 $0.00 
136-inch Non-Reinforced PCC669.2S.Y.$35.00$23,422.00 $0.00 $0.00 
145-inch Reinforced PCC Sidewalk425S.Y.$38.00$16,150.00 $0.00 $0.00 
155-inch Non-Reinforced PCC Trail48S.Y.$33.00$1,584.00 $0.00 $0.00 
165-inch Reinforced PCC Trail1675.9S.Y.$57.00$95,526.30 $0.00 $0.00 
176-inch Standard Curb764L.F.$17.00$12,988.00 $0.00 $0.00 
18Granular Subbase-Non Road Pavement Areas942.1Tons$17.00$16,015.70 $0.00 $0.00 
194-inch PVC SDR 35 Pipe60L.F.$37.00$2,220.00 $0.00 $0.00 
2012-inch RCP Class III148L.F.$39.00$5,772.00 $0.00 $0.00 
2112-inch RCP Class III FES W/Footing & Apron Guards5Each$2,200.00$11,000.00 $0.00 $0.00 
2215-inch RCP Class III185L.F.$47.00$8,695.00 $0.00 $0.00 
2315-inch RCP Class III FES W/Footing & Apron Guards1Each$2,700.00$2,700.00 $0.00 $0.00 
24SW-501 Single Grate Intake W/SW-603 Type 'R' Casting2Each$1,800.00$3,600.00 $0.00 $0.00 
25SW-503 Single Intake W/MH W/SW-602 Type "E' & SW-603 Type 'R' Castings1Each$4,000.00$4,000.00 $0.00 $0.00 
26Paint Striping-Cabin & Sw Parking, HC Markings, & 2 Truncated Domes1L.S.$500.00$500.00 $0.00 $0.00 
27Precast Concrete Parking Wheel Stops18Each$150.00$2,700.00 $0.00 $0.00 
28Signage-HC Signs for Parking Spaces, Road Closure, & 2 Trail Stop Signs1L.S.$750.00$750.00 $0.00 $0.00 
29Utility Adjustments-Cabin Area1L.S.$1,000.00$1,000.00 $0.00 $0.00 
30Oil & Sand Separator-Boat Ramp Parking Area1Each$30,000.00$30,000.00 $0.00 $0.00 
31Trench Drain-Boat Ramp Parking Area19L.F.$100.00$1,900.00 $0.00 $0.00 
32Paint Striping of Boat Ramp Parking Area Spaces675L.F.$1.45$978.75 $0.00 $0.00 
33Handicap Parking Space Pavement Marking-Boat Ramp Parking Location1Each$85.00$85.00 $0.00 $0.00 
34Handicap Parking Cross Hatching-Boat Ramp Parking Location1Each$250.00$250.00 $0.00 $0.00 
35Stop Sign @ Boat Ramp Parking Area Exit1Each$200.00$200.00 $0.00 $0.00 
36Single Pit Latrine, Boat Ramp Parking Area1Each$24,000.00$24,000.00 $0.00 $0.00 
37NPDES General Permit #2 & SWPPP1L.S.$300.00$300.00 $0.00 $0.00 
38Finish Grading-Access Road & West Spur1L.S.$2,000.00$2,000.00 $0.00 $0.00 
39Finish Grading-Non Road Areas1L.S.$2,000.00$2,000.00 $0.00 $0.00 
40Seeding, Fertilizing and Mulching-Access Road & West Spur1L.S.$2,500.00$2,500.00 $0.00 $0.00 
41Seeding, Fertilizing and Mulching-Non Road Areas1L.S.$2,000.00$2,000.00 $0.00 $0.00 
42Construction Staking-Access Road & West Spur1L.S.$8,000.00$8,000.00 $0.00 $0.00 
43Construction Staking-Non Road Areas1L.S.$8,000.00$8,000.00 $0.00 $0.00 
44Mobilization1L.S.$114,000.00$114,000.00 $0.00 $0.00 
      $746,394.75  $0.00  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Spring Lake Construction, Polk City, IA
J & L Construction, LLC, Washington, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.