IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Olofson Shooting Range | Date: 9/22/2016 | Project No. |
Training Center & Range Renovation | County: | POLK | Time: 11:00 a.m. | 16-02-77-02 |
1 | 2 | 3 | |||||||||||
Estimated Cost: $728,786.00 | Contractor: | Midwest Pipeline Solutions, LLC | Vieco Development & Construction | Henning Paric Commercial, LLC | |||||||||
Funding Source: 75% Federal-PR, 25% REAP OS Acquisition & Development, | 1704 Timberlane Dr | 5180 SE 70th Rd | 5800 Merle Hay Rd, #14 | ||||||||||
Boone IA 50036 | St Joseph MO 64507 | Johnston IA 50131 | |||||||||||
Plan Sets Requested: 1 | Quantities | 515-401-3661 | 816-387-1884 | 515-253-0943 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Grading | 1 | L.S. | $60,000.00 | $60,000.00 | $38,000.00 | $38,000.00 | $93,800.00 | $93,800.00 | ||||
2 | Seeding, Fertilizing and Mulching | 4 | Acres | $1,500.00 | $6,000.00 | $3,000.00 | $12,000.00 | $3,850.00 | $15,400.00 | ||||
3 | ScourStop Outlet Protection | 16 | S.F. | $815.00 | $13,040.00 | $30.00 | $480.00 | $39.69 | $635.04 | ||||
4 | 8-inch Filter Sock | 100 | L.F. | $1.89 | $189.00 | $5.00 | $500.00 | $5.00 | $500.00 | ||||
5 | 5-inch Reinforced PCC Sidewalk | 166.5 | S.Y. | $140.00 | $23,310.00 | $52.00 | $8,658.00 | $6.61 | $1,100.565 | ||||
6 | Granular Subbase for PCC Sidewalk | 34 | Tons | $31.50 | $1,071.00 | $40.00 | $1,360.00 | $30.00 | $1,020.00 | ||||
7 | 6-inch PVC SDR 35 Pipe | 98 | L.F. | $4.00 | $392.00 | $12.00 | $1,176.00 | $35.72 | $3,500.56 | ||||
8 | 8-inch PVC SDR 35 Pipe | 261 | L.F. | $5.50 | $1,435.50 | $14.00 | $3,654.00 | $45.97 | $11,998.17 | ||||
9 | 10-inch PVC SDR 35 Pipe | 198 | L.F. | $7.00 | $1,386.00 | $16.00 | $3,168.00 | $40.90 | $8,098.20 | ||||
10 | 12-inch Diameter Nyloplast Drain Basin | 3 | Each | $25.00 | $75.00 | $1,280.00 | $3,840.00 | $1,433.33 | $4,299.99 | ||||
11 | 10-inch Diameter Nyloplast Drain Basin | 6 | Each | $25.00 | $150.00 | $1,100.00 | $6,600.00 | $1,250.00 | $7,500.00 | ||||
12 | 6-inch Diameter Rat Guard | 4 | Each | $25.00 | $100.00 | $20.00 | $80.00 | $150.00 | $600.00 | ||||
13 | 10-inch Diameter Rat Guard | 1 | Each | $35.00 | $35.00 | $50.00 | $50.00 | $150.00 | $150.00 | ||||
14 | Replace Grate with Solid Manhole Lid | 1 | Each | $150.00 | $150.00 | $820.00 | $820.00 | $1,100.00 | $1,100.00 | ||||
15 | 2-inch HDPE Water Pipe | 37 | L.F. | $0.95 | $35.15 | $30.00 | $1,110.00 | $81.08 | $2,999.96 | ||||
16 | 2-inch Curb Stop | 1 | Each | $285.00 | $285.00 | $700.00 | $700.00 | $1,100.00 | $1,100.00 | ||||
17 | Paint Striping and Markings | 1 | L.S. | $1,000.00 | $1,000.00 | $1,500.00 | $1,500.00 | $800.00 | $800.00 | ||||
18 | Precast Concrete Parking Wheel Stops | 11 | Each | $75.00 | $825.00 | $100.00 | $1,100.00 | $145.45 | $1,599.95 | ||||
19 | Signage-HC Signs for Parking Spaces | 1 | L.S. | $1,300.00 | $1,300.00 | $700.00 | $700.00 | $350.00 | $350.00 | ||||
20 | Black PVC Coated Chain Link Fencing | 1 | L.S. | $20,585.08 | $20,585.08 | $13,200.00 | $13,200.00 | $14,500.00 | $14,500.00 | ||||
21 | NPDES General Permit #2 & SWPPP | 1 | L.S. | $2,500.00 | $2,500.00 | $6,500.00 | $6,500.00 | $7,200.00 | $7,200.00 | ||||
22 | Construction Staking | 1 | L.S. | $10,000.00 | $10,000.00 | $6,000.00 | $6,000.00 | $4,500.00 | $4,500.00 | ||||
23 | Mobilization | 1 | L.S. | $50,000.00 | $50,000.00 | $19,000.00 | $19,000.00 | $15,000.00 | $15,000.00 | ||||
24 | Electrical Service (Main Bldg & Stubs to Alternates) | 1 | L.S. | $55,168.19 | $55,168.19 | $15,000.00 | $15,000.00 | $115,000.00 | $115,000.00 | ||||
25 | Training Center Building | 1 | L.S. | $241,456.03 | $241,456.03 | $497,000.00 | $497,000.00 | $460,000.00 | $460,000.00 | ||||
$490,487.95 | $642,196.00 | $772,752.435 | |||||||||||
Alternate | |||||||||||||
26 | Storage Garage & Tank Enclosure | 1 | L.S. | $38,447.88 | $38,447.88 | $54,000.00 | $54,000.00 | $67,280.00 | $67,280.00 | ||||
Alternate | |||||||||||||
27 | Class 'A' Crushed Stone | 39 | Tons | $34.15 | $1,331.85 | $40.00 | $1,560.00 | $57.95 | $2,260.05 | ||||
Alternate | |||||||||||||
28 | Shooting Structure #1 (Incl. Interior Electrical) | 1 | L.S. | $64,968.48 | $64,968.48 | $68,500.00 | $68,500.00 | $136,000.00 | $136,000.00 | ||||
Alternate | |||||||||||||
29 | Road Gravel | 9.2 | Tons | $45.00 | $414.00 | $40.00 | $368.00 | $99.05 | $911.26 | ||||
Alternate | |||||||||||||
30 | 5-inch Reinforced PCC Sidewalk | 24 | S.Y. | $135.00 | $3,240.00 | $60.00 | $1,440.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
31 | Granular Subbase for PCC Sidewalk | 5 | Tons | $29.45 | $147.25 | $40.00 | $200.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
32 | Shooting Structure #2 (Incl. Interior Electrical) | 1 | L.S. | $60,259.00 | $60,259.00 | $65,000.00 | $65,000.00 | $141,000.00 | $141,000.00 | ||||
Alternate | |||||||||||||
33 | Road Gravel | 9.2 | Tons | $45.00 | $414.00 | $40.00 | $368.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
34 | 5-inch Reinforced PCC Sidewalk | 14 | S.Y. | $135.00 | $1,890.00 | $70.00 | $980.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
35 | Granular Subbase for PCC Sidewalk | 3 | Tons | $29.45 | $88.35 | $40.00 | $120.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
36 | Shooting Structure #3 (Incl. Interior Electrical) | 1 | L.S. | $67,790.72 | $67,790.72 | $61,500.00 | $61,500.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
37 | Road Gravel | 9.2 | Tons | $45.00 | $414.00 | $40.00 | $368.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
38 | 5-inch Reinforced PCC Sidewalk | 24 | S.Y. | $135.00 | $3,240.00 | $70.00 | $1,680.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
39 | Granular Subbase for PCC Sidewalk | 5 | Tons | $29.45 | $147.25 | $40.00 | $200.00 | $0.00 | $0.00 | ||||
Alternate | |||||||||||||
40 | Stone Entry Portal | 1 | L.S. | $35,000.00 | $35,000.00 | $64,000.00 | $64,000.00 | $0.00 | $0.00 | ||||
$768,280.73 | $962,480.00 | $1,120,203.745 | |||||||||||
4 | 5 | 6 | |||||||||||
Estimated Cost: $728,786.00 | Contractor: | Blue Ribbon Builders, LLC | Rochon Corporation of Iowa, Inc. | Lansink Construction, Inc. | |||||||||
Funding Source: 75% Federal-PR, 25% REAP OS Acquisition & Development, | 19228 365th St | 3401 106th Circle | 5907 Merle Hay Rd | ||||||||||
Earlham IA 50072 | Urbandale IA 50322 | Johnston IA 50131 | |||||||||||
Plan Sets Requested: 1 | Quantities | 515-290-3023 | 515-278-9446 | 515-270-8506 | |||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Grading | 1 | L.S. | $90,000.00 | $90,000.00 | $67,000.00 | $67,000.00 | $66,000.00 | $66,000.00 | ||||
2 | Seeding, Fertilizing and Mulching | 4 | Acres | $4,500.00 | $18,000.00 | $3,000.00 | $12,000.00 | $3,850.00 | $15,400.00 | ||||
3 | ScourStop Outlet Protection | 16 | S.F. | $30.00 | $480.00 | $18.00 | $288.00 | $25.00 | $400.00 | ||||
4 | 8-inch Filter Sock | 100 | L.F. | $5.90 | $590.00 | $4.25 | $425.00 | $5.00 | $500.00 | ||||
5 | 5-inch Reinforced PCC Sidewalk | 166.5 | S.Y. | $52.00 | $8,658.00 | $50.00 | $8,325.00 | $50.00 | $8,325.00 | ||||
6 | Granular Subbase for PCC Sidewalk | 34 | Tons | $32.00 | $1,088.00 | $40.00 | $1,360.00 | $30.00 | $1,020.00 | ||||
7 | 6-inch PVC SDR 35 Pipe | 98 | L.F. | $24.00 | $2,352.00 | $80.00 | $7,840.00 | $53.40 | $5,233.20 | ||||
8 | 8-inch PVC SDR 35 Pipe | 261 | L.F. | $26.00 | $6,786.00 | $90.00 | $23,490.00 | $64.50 | $16,834.50 | ||||
9 | 10-inch PVC SDR 35 Pipe | 198 | L.F. | $33.00 | $6,534.00 | $110.00 | $21,780.00 | $58.50 | $11,583.00 | ||||
10 | 12-inch Diameter Nyloplast Drain Basin | 3 | Each | $1,130.00 | $3,390.00 | $1,200.00 | $3,600.00 | $823.00 | $2,469.00 | ||||
11 | 10-inch Diameter Nyloplast Drain Basin | 6 | Each | $940.00 | $5,640.00 | $900.00 | $5,400.00 | $680.00 | $4,080.00 | ||||
12 | 6-inch Diameter Rat Guard | 4 | Each | $65.00 | $260.00 | $500.00 | $2,000.00 | $90.00 | $360.00 | ||||
13 | 10-inch Diameter Rat Guard | 1 | Each | $98.00 | $98.00 | $500.00 | $500.00 | $100.00 | $100.00 | ||||
14 | Replace Grate with Solid Manhole Lid | 1 | Each | $330.00 | $330.00 | $1,500.00 | $1,500.00 | $730.00 | $730.00 | ||||
15 | 2-inch HDPE Water Pipe | 37 | L.F. | $12.00 | $444.00 | $100.00 | $3,700.00 | $112.00 | $4,144.00 | ||||
16 | 2-inch Curb Stop | 1 | Each | $2,900.00 | $2,900.00 | $2,000.00 | $2,000.00 | $1,460.00 | $1,460.00 | ||||
17 | Paint Striping and Markings | 1 | L.S. | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 | $595.00 | $595.00 | ||||
18 | Precast Concrete Parking Wheel Stops | 11 | Each | $75.00 | $825.00 | $100.00 | $1,100.00 | $115.00 | $1,265.00 | ||||
19 | Signage-HC Signs for Parking Spaces | 1 | L.S. | $260.00 | $260.00 | $300.00 | $300.00 | $290.00 | $290.00 | ||||
20 | Black PVC Coated Chain Link Fencing | 1 | L.S. | $13,450.00 | $13,450.00 | $9,800.00 | $9,800.00 | $11,400.00 | $11,400.00 | ||||
21 | NPDES General Permit #2 & SWPPP | 1 | L.S. | $7,670.00 | $7,670.00 | $5,000.00 | $5,000.00 | $6,500.00 | $6,500.00 | ||||
22 | Construction Staking | 1 | L.S. | $2,900.00 | $2,900.00 | $4,000.00 | $4,000.00 | $3,500.00 | $3,500.00 | ||||
23 | Mobilization | 1 | L.S. | $13,000.00 | $13,000.00 | $15,000.00 | $15,000.00 | $200,000.00 | $200,000.00 | ||||
24 | Electrical Service (Main Bldg & Stubs to Alternates) | 1 | L.S. | $7,500.00 | $7,500.00 | $28,000.00 | $28,000.00 | $90,000.00 | $90,000.00 | ||||
25 | Training Center Building | 1 | L.S. | $535,000.00 | $535,000.00 | $570,000.00 | $570,000.00 | $410,000.00 | $410,000.00 | ||||
Alternate | |||||||||||||
26 | Storage Garage & Tank Enclosure | 1 | L.S. | $60,000.00 | $60,000.00 | $63,000.00 | $63,000.00 | $57,000.00 | $57,000.00 | ||||
Alternate | |||||||||||||
27 | Class 'A' Crushed Stone | 39 | Tons | $32.00 | $1,248.00 | $400.00 | $15,600.00 | $58.00 | $2,262.00 | ||||
Alternate | |||||||||||||
28 | Shooting Structure #1 (Incl. Interior Electrical) | 1 | L.S. | $108,000.00 | $108,000.00 | $110,000.00 | $110,000.00 | $115,000.00 | $115,000.00 | ||||
Alternate | |||||||||||||
29 | Road Gravel | 9.2 | Tons | $40.00 | $368.00 | $40.00 | $368.00 | $105.00 | $966.00 | ||||
Alternate | |||||||||||||
30 | 5-inch Reinforced PCC Sidewalk | 24 | S.Y. | $53.00 | $1,272.00 | $50.00 | $1,200.00 | $50.00 | $1,200.00 | ||||
Alternate | |||||||||||||
31 | Granular Subbase for PCC Sidewalk | 5 | Tons | $32.00 | $160.00 | $40.00 | $200.00 | $30.00 | $150.00 | ||||
Alternate | |||||||||||||
32 | Shooting Structure #2 (Incl. Interior Electrical) | 1 | L.S. | $104,000.00 | $104,000.00 | $103,000.00 | $103,000.00 | $121,000.00 | $121,000.00 | ||||
Alternate | |||||||||||||
33 | Road Gravel | 9.2 | Tons | $40.00 | $368.00 | $40.00 | $368.00 | $105.00 | $966.00 | ||||
Alternate | |||||||||||||
34 | 5-inch Reinforced PCC Sidewalk | 14 | S.Y. | $53.00 | $742.00 | $50.00 | $700.00 | $50.00 | $700.00 | ||||
Alternate | |||||||||||||
35 | Granular Subbase for PCC Sidewalk | 3 | Tons | $32.00 | $96.00 | $40.00 | $120.00 | $30.00 | $90.00 | ||||
Alternate | |||||||||||||
36 | Shooting Structure #3 (Incl. Interior Electrical) | 1 | L.S. | $90,000.00 | $90,000.00 | $94,000.00 | $94,000.00 | $108,000.00 | $108,000.00 | ||||
Alternate | |||||||||||||
37 | Road Gravel | 9.2 | Tons | $40.00 | $368.00 | $40.00 | $368.00 | $105.00 | $966.00 | ||||
Alternate | |||||||||||||
38 | 5-inch Reinforced PCC Sidewalk | 24 | S.Y. | $53.00 | $1,272.00 | $50.00 | $1,200.00 | $50.00 | $1,200.00 | ||||
Alternate | |||||||||||||
39 | Granular Subbase for PCC Sidewalk | 5 | Tons | $32.00 | $160.00 | $40.00 | $200.00 | $30.00 | $150.00 | ||||
Alternate | |||||||||||||
40 | Stone Entry Portal | 1 | L.S. | $43,000.00 | $43,000.00 | $60,000.00 | $60,000.00 | $45,000.00 | $45,000.00 | ||||
$1,141,109.00 | $1,246,632.00 | $1,316,838.70 | |||||||||||
7 | 8 | 9 | |||||||||||
Estimated Cost: $728,786.00 | Contractor: | Ball Team LLC | Edge Commercial, LLC | ||||||||||
Funding Source: 75% Federal-PR, 25% REAP OS Acquisition & Development, | 10550 New York Ave, Ste 100 | 3155 SE Miehe Dr, Ste 2 | |||||||||||
Urbandale IA 50322 | Grimes IA 50111 | ||||||||||||
Plan Sets Requested: 1 | Quantities | 515-440-4544 | 515-986-2229 | ||||||||||
No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
1 | Grading | 1 | L.S. | $73,928.00 | $73,928.00 | $177,000.00 | $177,000.00 | $0.00 | |||||
2 | Seeding, Fertilizing and Mulching | 4 | Acres | $3,850.00 | $15,400.00 | $5,000.00 | $20,000.00 | $0.00 | |||||
3 | ScourStop Outlet Protection | 16 | S.F. | $25.00 | $400.00 | $31.25 | $500.00 | $0.00 | |||||
4 | 8-inch Filter Sock | 100 | L.F. | $5.00 | $500.00 | $6.00 | $600.00 | $0.00 | |||||
5 | 5-inch Reinforced PCC Sidewalk | 166.5 | S.Y. | $60.00 | $9,990.00 | $72.07 | $11,999.655 | $0.00 | |||||
6 | Granular Subbase for PCC Sidewalk | 34 | Tons | $35.00 | $1,190.00 | $44.12 | $1,500.08 | $0.00 | |||||
7 | 6-inch PVC SDR 35 Pipe | 98 | L.F. | $42.00 | $4,116.00 | $42.86 | $4,200.28 | $0.00 | |||||
8 | 8-inch PVC SDR 35 Pipe | 261 | L.F. | $44.00 | $11,484.00 | $42.15 | $11,001.15 | $0.00 | |||||
9 | 10-inch PVC SDR 35 Pipe | 198 | L.F. | $46.00 | $9,108.00 | $47.98 | $9,500.04 | $0.00 | |||||
10 | 12-inch Diameter Nyloplast Drain Basin | 3 | Each | $1,400.00 | $4,200.00 | $2,167.00 | $6,501.00 | $0.00 | |||||
11 | 10-inch Diameter Nyloplast Drain Basin | 6 | Each | $1,250.00 | $7,500.00 | $2,167.00 | $13,002.00 | $0.00 | |||||
12 | 6-inch Diameter Rat Guard | 4 | Each | $110.00 | $440.00 | $37.50 | $150.00 | $0.00 | |||||
13 | 10-inch Diameter Rat Guard | 1 | Each | $120.00 | $120.00 | $150.00 | $150.00 | $0.00 | |||||
14 | Replace Grate with Solid Manhole Lid | 1 | Each | $500.00 | $500.00 | $1,200.00 | $1,200.00 | $0.00 | |||||
15 | 2-inch HDPE Water Pipe | 37 | L.F. | $40.00 | $1,480.00 | $32.43 | $1,199.91 | $0.00 | |||||
16 | 2-inch Curb Stop | 1 | Each | $1,050.00 | $1,050.00 | $600.00 | $600.00 | $0.00 | |||||
17 | Paint Striping and Markings | 1 | L.S. | $395.00 | $395.00 | $1,200.00 | $1,200.00 | $0.00 | |||||
18 | Precast Concrete Parking Wheel Stops | 11 | Each | $110.00 | $1,210.00 | $300.00 | $3,300.00 | $0.00 | |||||
19 | Signage-HC Signs for Parking Spaces | 1 | L.S. | $300.00 | $300.00 | $600.00 | $600.00 | $0.00 | |||||
20 | Black PVC Coated Chain Link Fencing | 1 | L.S. | $11,400.00 | $11,400.00 | $14,200.00 | $14,200.00 | $0.00 | |||||
21 | NPDES General Permit #2 & SWPPP | 1 | L.S. | $6,500.00 | $6,500.00 | $11,000.00 | $11,000.00 | $0.00 | |||||
22 | Construction Staking | 1 | L.S. | $3,500.00 | $3,500.00 | $6,000.00 | $6,000.00 | $0.00 | |||||
23 | Mobilization | 1 | L.S. | $6,000.00 | $6,000.00 | $85,000.00 | $85,000.00 | $0.00 | |||||
24 | Electrical Service (Main Bldg & Stubs to Alternates) | 1 | L.S. | $90,000.00 | $90,000.00 | $105,000.00 | $105,000.00 | $0.00 | |||||
25 | Training Center Building | 1 | L.S. | $843,000.00 | $843,000.00 | $512,500.00 | $512,500.00 | $0.00 | |||||
Alternate | |||||||||||||
26 | Storage Garage & Tank Enclosure | 1 | L.S. | $77,700.00 | $77,700.00 | $101,120.00 | $101,120.00 | $0.00 | |||||
Alternate | |||||||||||||
27 | Class 'A' Crushed Stone | 39 | Tons | $40.00 | $1,560.00 | $31.00 | $1,209.00 | $0.00 | |||||
Alternate | |||||||||||||
28 | Shooting Structure #1 (Incl. Interior Electrical) | 1 | L.S. | $134,000.00 | $134,000.00 | $165,010.00 | $165,010.00 | $0.00 | |||||
Alternate | |||||||||||||
29 | Road Gravel | 9.2 | Tons | $105.00 | $966.00 | $32.60 | $299.92 | $0.00 | |||||
Alternate | |||||||||||||
30 | 5-inch Reinforced PCC Sidewalk | 24 | S.Y. | $60.00 | $1,440.00 | $62.50 | $1,500.00 | $0.00 | |||||
Alternate | |||||||||||||
31 | Granular Subbase for PCC Sidewalk | 5 | Tons | $40.00 | $200.00 | $30.00 | $150.00 | $0.00 | |||||
Alternate | |||||||||||||
32 | Shooting Structure #2 (Incl. Interior Electrical) | 1 | L.S. | $135,000.00 | $135,000.00 | $173,960.00 | $173,960.00 | $0.00 | |||||
Alternate | |||||||||||||
33 | Road Gravel | 9.2 | Tons | $105.00 | $966.00 | $32.60 | $299.92 | $0.00 | |||||
Alternate | |||||||||||||
34 | 5-inch Reinforced PCC Sidewalk | 14 | S.Y. | $60.00 | $840.00 | $60.71 | $849.94 | $0.00 | |||||
Alternate | |||||||||||||
35 | Granular Subbase for PCC Sidewalk | 3 | Tons | $40.00 | $120.00 | $30.00 | $90.00 | $0.00 | |||||
Alternate | |||||||||||||
36 | Shooting Structure #3 (Incl. Interior Electrical) | 1 | L.S. | $119,000.00 | $119,000.00 | $147,000.00 | $147,000.00 | $0.00 | |||||
Alternate | |||||||||||||
37 | Road Gravel | 9.2 | Tons | $105.00 | $966.00 | $32.60 | $299.92 | $0.00 | |||||
Alternate | |||||||||||||
38 | 5-inch Reinforced PCC Sidewalk | 24 | S.Y. | $60.00 | $1,440.00 | $62.50 | $1,500.00 | $0.00 | |||||
Alternate | |||||||||||||
39 | Granular Subbase for PCC Sidewalk | 5 | Tons | $40.00 | $200.00 | $40.00 | $200.00 | $0.00 | |||||
Alternate | |||||||||||||
40 | Stone Entry Portal | 1 | L.S. | $40,600.00 | $40,600.00 | $60,000.00 | $60,000.00 | $0.00 | |||||
$1,618,709.00 | $1,651,392.815 | $0.00 | |||||||||||
Midwest Pipeline Solutions, LLC, Boone, IA
Henning Paric Commercial, LLC, Johnston , IA
5/19/2024