 Bids For:  Location:   Pleasant Creek State Recreation Area  Date: 4/21/2016  Project No.  
  Shoreline Stabilization - Contract  County:   LINN  Time: 11:00 AM  15-06-57-03

 

 
1
2
3
Estimated Cost: $2,700,000.00
Contractor: 
PETERSON CONTRACTORS INC (PCI-REINBECK)CJ Moyna & Sons IncCornerstone Excavating, Inc.
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management104 Blackhawk St
Box A
8710 Earhart Ln SW
1320 West Main Street
PO Box 928
Reinbeck IA  50669Cedar Rapids IA  52404Washington IA  52353
Plan Sets Requested: 14
Quantities
319-345-2713319-841-9260319-653
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EXCAVATION, CLASS 1037207C.Y.$3.15$117,202.05 $2.50$93,017.50 $1.95$72,553.65 
2REVETMENT, CLASS E - SHORELINE47318Tons$32.00$1,514,176.00 $37.50$1,774,425.00 $36.70$1,736,570.60 
3REVETMENT, CLASS E - ISLAND1330Tons$36.00$47,880.00 $37.50$49,875.00 $36.70$48,811.00 
4ENGINEERING FABRIC - SHORELINE15310S.Y.$1.50$22,965.00 $1.27$19,443.70 $1.35$20,668.50 
5ENGINEERING FABRIC - ISLAND3356S.Y.$1.70$5,705.20 $1.50$5,034.00 $1.35$4,530.60 
6ENGINEERING FABRIC - HABITAT1010S.Y.$1.80$1,818.00 $1.50$1,515.00 $1.35$1,363.50 
7CONCRETE GROUT334C.Y.$191.00$63,794.00 $235.00$78,490.00 $205.00$68,470.00 
8SHOT ROCK - WASTE POINTS4120Tons$21.65$89,198.00 $17.50$72,100.00 $19.45$80,134.00 
9SHOT ROCK - HABITAT2990Tons$26.00$77,740.00 $16.00$47,840.00 $19.45$58,155.50 
103/8" MINUS CRUSHED STONE51Tons$24.00$1,224.00 $15.00$765.00 $12.25$624.75 
116" STRUCTURAL CONCRETE - BOAT RAMP1314S.Y.$50.00$65,700.00 $48.24$63,387.36 $75.00$98,550.00 
126" PCC SIDEWALK72S.Y.$54.00$3,888.00 $45.09$3,246.48 $65.00$4,680.00 
13CLASS A CRUSHED STONE3734Tons$14.75$55,076.50 $16.00$59,744.00 $13.25$49,475.50 
14ROAD GRADING5069L.F.$0.35$1,774.15 $1.50$7,603.50 $2.00$10,138.00 
15DITCH CLEANOUT10138L.F.$1.15$11,658.70 $1.00$10,138.00 $2.85$28,893.30 
16PAVEMENT REMOVAL955S.Y.$3.15$3,008.25 $3.50$3,342.50 $4.00$3,820.00 
17GEOCELL, 6"8388S.F.$2.00$16,776.00 $3.00$25,164.00 $3.40$28,519.20 
18POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL614Tons$25.50$15,657.00 $29.00$17,806.00 $27.00$16,578.00 
19SHEET PILE940S.F.$31.47$29,581.80 $40.00$37,600.00 $27.50$25,850.00 
20BRIDGE PLANKS282L.F.$31.50$8,883.00 $25.00$7,050.00 $36.00$10,152.00 
21ALUMINUM RAIL SECTION5Each$966.80$4,834.00 $3,000.00$15,000.00 $1,250.00$6,250.00 
22RELOCATE POWER POLE1Each$800.00$800.00 $1,500.00$1,500.00 $3,150.00$3,150.00 
23SITE RESTORATION1L.S.$23,000.00$23,000.00 $35,000.00$35,000.00 $20,000.00$20,000.00 
24CONSTRUCTION SURVEY1L.S.$14,000.00$14,000.00 $5,000.00$5,000.00 $10,000.00$10,000.00 
25MOBILIZATION1L.S.$34,200.00$34,200.00 $25,000.00$25,000.00 $75,000.00$75,000.00 
      $2,230,539.65  $2,459,087.04  $2,482,938.10 
 
4
5
6
Estimated Cost: $2,700,000.00
Contractor: 
LANGMAN CONSTRUCTION INCLegacy Corporation of IllinoisConnolly Construction Inc
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management220 - 34TH AVENUE
16322 Barstow Road
18409 N Cascade Rd
PO Box 68
ROCK ISLAND IL  61201East Moline IL  61244Peosta IA  52068
Plan Sets Requested: 14
Quantities
(309)786-8885 309-203-1094563-876-3225
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EXCAVATION, CLASS 1037207C.Y.$2.00$74,414.00 $4.00$148,828.00 $4.38$162,966.66 
2REVETMENT, CLASS E - SHORELINE47318Tons$36.50$1,727,107.00 $36.00$1,703,448.00 $40.05$1,895,085.90 
3REVETMENT, CLASS E - ISLAND1330Tons$36.50$48,545.00 $36.00$47,880.00 $44.28$58,892.40 
4ENGINEERING FABRIC - SHORELINE15310S.Y.$1.00$15,310.00 $2.00$30,620.00 $1.41$21,587.10 
5ENGINEERING FABRIC - ISLAND3356S.Y.$1.00$3,356.00 $2.00$6,712.00 $1.40$4,698.40 
6ENGINEERING FABRIC - HABITAT1010S.Y.$1.00$1,010.00 $2.00$2,020.00 $1.17$1,181.70 
7CONCRETE GROUT334C.Y.$125.00$41,750.00 $225.00$75,150.00 $194.40$64,929.60 
8SHOT ROCK - WASTE POINTS4120Tons$19.00$78,280.00 $19.50$80,340.00 $24.23$99,827.60 
9SHOT ROCK - HABITAT2990Tons$19.00$56,810.00 $19.50$58,305.00 $23.62$70,623.80 
103/8" MINUS CRUSHED STONE51Tons$30.00$1,530.00 $50.00$2,550.00 $26.96$1,374.96 
116" STRUCTURAL CONCRETE - BOAT RAMP1314S.Y.$60.00$78,840.00 $83.00$109,062.00 $98.58$129,534.12 
126" PCC SIDEWALK72S.Y.$60.00$4,320.00 $72.00$5,184.00 $66.55$4,791.60 
13CLASS A CRUSHED STONE3734Tons$15.00$56,010.00 $17.00$63,478.00 $17.46$65,195.64 
14ROAD GRADING5069L.F.$0.60$3,041.40 $2.50$12,672.50 $1.17$5,930.73 
15DITCH CLEANOUT10138L.F.$1.00$10,138.00 $3.25$32,948.50 $2.97$30,109.86 
16PAVEMENT REMOVAL955S.Y.$3.00$2,865.00 $8.50$8,117.50 $4.98$4,755.90 
17GEOCELL, 6"8388S.F.$1.25$10,485.00 $3.00$25,164.00 $2.20$18,453.60 
18POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL614Tons$28.00$17,192.00 $34.00$20,876.00 $36.76$22,570.64 
19SHEET PILE940S.F.$25.00$23,500.00 $30.00$28,200.00 $22.04$20,717.60 
20BRIDGE PLANKS282L.F.$6.00$1,692.00 $25.00$7,050.00 $16.49$4,650.18 
21ALUMINUM RAIL SECTION5Each$1,000.00$5,000.00 $500.00$2,500.00 $1,399.78$6,998.90 
22RELOCATE POWER POLE1Each$400.00$400.00 $5,000.00$5,000.00 $2,214.12$2,214.12 
23SITE RESTORATION1L.S.$1,000.00$1,000.00 $10,000.00$10,000.00 $30,444.81$30,444.81 
24CONSTRUCTION SURVEY1L.S.$1,000.00$1,000.00 $15,000.00$15,000.00 $9,609.09$9,609.09 
25MOBILIZATION1L.S.$251,500.00$251,500.00 $140,000.00$140,000.00 $73,625.70$73,625.70 
      $2,515,095.40  $2,641,105.50  $2,810,770.61 
 
7
8
9
Estimated Cost: $2,700,000.00
Contractor: 
Landwehr Construction, IncCole Construction Company IncGehrke Inc.
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management
PO Box 1086
24100 Queen Ave
1405 - 21st Ave
St. Cloud MN  56302Keosauqua IA  525658329Eldora IA  50627
Plan Sets Requested: 14
Quantities
320-252-1494319-592-3103641-858-3821
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EXCAVATION, CLASS 1037207C.Y.$3.90$145,107.30 $2.85$106,039.95 $6.65$247,426.55 
2REVETMENT, CLASS E - SHORELINE47318Tons$45.25$2,141,139.50 $43.25$2,046,503.50 $38.90$1,840,670.20 
3REVETMENT, CLASS E - ISLAND1330Tons$55.00$73,150.00 $43.25$57,522.50 $44.23$58,825.90 
4ENGINEERING FABRIC - SHORELINE15310S.Y.$1.50$22,965.00 $2.10$32,151.00 $1.93$29,548.30 
5ENGINEERING FABRIC - ISLAND3356S.Y.$1.50$5,034.00 $2.10$7,047.60 $2.60$8,725.60 
6ENGINEERING FABRIC - HABITAT1010S.Y.$2.50$2,525.00 $2.10$2,121.00 $2.60$2,626.00 
7CONCRETE GROUT334C.Y.$150.00$50,100.00 $350.00$116,900.00 $150.00$50,100.00 
8SHOT ROCK - WASTE POINTS4120Tons$27.06$111,487.20 $25.50$105,060.00 $28.45$117,214.00 
9SHOT ROCK - HABITAT2990Tons$27.06$80,909.40 $25.50$76,245.00 $28.45$85,065.50 
103/8" MINUS CRUSHED STONE51Tons$29.00$1,479.00 $17.25$879.75 $36.12$1,842.12 
116" STRUCTURAL CONCRETE - BOAT RAMP1314S.Y.$10.00$13,140.00 $48.24$63,387.36 $67.00$88,038.00 
126" PCC SIDEWALK72S.Y.$25.00$1,800.00 $45.09$3,246.48 $67.00$4,824.00 
13CLASS A CRUSHED STONE3734Tons$15.10$56,383.40 $19.50$72,813.00 $20.50$76,547.00 
14ROAD GRADING5069L.F.$1.50$7,603.50 $2.96$15,004.24 $2.70$13,686.30 
15DITCH CLEANOUT10138L.F.$2.50$25,345.00 $3.00$30,414.00 $3.94$39,943.72 
16PAVEMENT REMOVAL955S.Y.$3.00$2,865.00 $7.00$6,685.00 $12.00$11,460.00 
17GEOCELL, 6"8388S.F.$2.50$20,970.00 $4.90$41,101.20 $2.50$20,970.00 
18POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL614Tons$36.71$22,539.94 $40.00$24,560.00 $43.50$26,709.00 
19SHEET PILE940S.F.$37.00$34,780.00 $50.00$47,000.00 $66.00$62,040.00 
20BRIDGE PLANKS282L.F.$20.53$5,789.46 $40.00$11,280.00 $46.00$12,972.00 
21ALUMINUM RAIL SECTION5Each$1,000.00$5,000.00 $845.00$4,225.00 $4,000.00$20,000.00 
22RELOCATE POWER POLE1Each$2,000.00$2,000.00 $2,500.00$2,500.00 $2,500.00$2,500.00 
23SITE RESTORATION1L.S.$30,000.00$30,000.00 $15,000.00$15,000.00 $42,000.00$42,000.00 
24CONSTRUCTION SURVEY1L.S.$15,000.00$15,000.00 $5,000.00$5,000.00 $10,000.00$10,000.00 
25MOBILIZATION1L.S.$18,000.00$18,000.00 $95,000.00$95,000.00 $167,000.00$167,000.00 
      $2,895,112.70  $2,987,686.58  $3,040,734.19 
 
10
11
12
Estimated Cost: $2,700,000.00
Contractor: 
Miller Trucking & Excav
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management3033 John Deere Rd


Silvis IL  61282    
Plan Sets Requested: 14
Quantities
(309) 755-7644
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1EXCAVATION, CLASS 1037207C.Y.$5.00$186,035.00 $0.00 $0.00 
2REVETMENT, CLASS E - SHORELINE47318Tons$45.00$2,129,310.00 $0.00 $0.00 
3REVETMENT, CLASS E - ISLAND1330Tons$45.00$59,850.00 $0.00 $0.00 
4ENGINEERING FABRIC - SHORELINE15310S.Y.$1.00$15,310.00 $0.00 $0.00 
5ENGINEERING FABRIC - ISLAND3356S.Y.$1.00$3,356.00 $0.00 $0.00 
6ENGINEERING FABRIC - HABITAT1010S.Y.$1.00$1,010.00 $0.00 $0.00 
7CONCRETE GROUT334C.Y.$160.00$53,440.00 $0.00 $0.00 
8SHOT ROCK - WASTE POINTS4120Tons$25.00$103,000.00 $0.00 $0.00 
9SHOT ROCK - HABITAT2990Tons$25.00$74,750.00 $0.00 $0.00 
103/8" MINUS CRUSHED STONE51Tons$25.00$1,275.00 $0.00 $0.00 
116" STRUCTURAL CONCRETE - BOAT RAMP1314S.Y.$50.00$65,700.00 $0.00 $0.00 
126" PCC SIDEWALK72S.Y.$50.00$3,600.00 $0.00 $0.00 
13CLASS A CRUSHED STONE3734Tons$15.00$56,010.00 $0.00 $0.00 
14ROAD GRADING5069L.F.$4.00$20,276.00 $0.00 $0.00 
15DITCH CLEANOUT10138L.F.$6.00$60,828.00 $0.00 $0.00 
16PAVEMENT REMOVAL955S.Y.$10.00$9,550.00 $0.00 $0.00 
17GEOCELL, 6"8388S.F.$3.00$25,164.00 $0.00 $0.00 
18POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL614Tons$40.00$24,560.00 $0.00 $0.00 
19SHEET PILE940S.F.$40.00$37,600.00 $0.00 $0.00 
20BRIDGE PLANKS282L.F.$45.00$12,690.00 $0.00 $0.00 
21ALUMINUM RAIL SECTION5Each$1,200.00$6,000.00 $0.00 $0.00 
22RELOCATE POWER POLE1Each$1,500.00$1,500.00 $0.00 $0.00 
23SITE RESTORATION1L.S.$45,000.00$45,000.00 $0.00 $0.00 
24CONSTRUCTION SURVEY1L.S.$20,000.00$20,000.00 $0.00 $0.00 
25MOBILIZATION1L.S.$75,000.00$75,000.00 $0.00 $0.00 
      $3,090,814.00  $0.00  $0.00 
 



 