IOWA DEPARTMENT OF NATURAL RESOURCES |
|
Bids For: | Location: | Pleasant Creek State Recreation Area | Date: 4/21/2016 | Project No. |
Shoreline Stabilization - Contract | County: | LINN | Time: 11:00 AM | 15-06-57-03 |
![]() | 1 | 2 | 3 | ![]() | |||||||||
Estimated Cost: $2,700,000.00 | Contractor: | ![]() | PETERSON CONTRACTORS INC (PCI-REINBECK) | CJ Moyna & Sons Inc | Cornerstone Excavating, Inc. | ![]() | |||||||
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management | ![]() | 104 Blackhawk St Box A | ![]() | 8710 Earhart Ln SW | ![]() | 1320 West Main Street PO Box 928 | ![]() | ||||||
![]() | Reinbeck IA 50669 | ![]() | Cedar Rapids IA 52404 | ![]() | Washington IA 52353 | ![]() | |||||||
Plan Sets Requested: 14 | Quantities | ![]() | 319-345-2713 | ![]() | 319-841-9260 | ![]() | 319-653 | ![]() | |||||
No. | Description: | No. | Unit | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
1 | EXCAVATION, CLASS 10 | 37207 | C.Y. | ![]() | $3.15 | $117,202.05 | ![]() | $2.50 | $93,017.50 | ![]() | $1.95 | $72,553.65 | ![]() |
2 | REVETMENT, CLASS E - SHORELINE | 47318 | Tons | ![]() | $32.00 | $1,514,176.00 | ![]() | $37.50 | $1,774,425.00 | ![]() | $36.70 | $1,736,570.60 | ![]() |
3 | REVETMENT, CLASS E - ISLAND | 1330 | Tons | ![]() | $36.00 | $47,880.00 | ![]() | $37.50 | $49,875.00 | ![]() | $36.70 | $48,811.00 | ![]() |
4 | ENGINEERING FABRIC - SHORELINE | 15310 | S.Y. | ![]() | $1.50 | $22,965.00 | ![]() | $1.27 | $19,443.70 | ![]() | $1.35 | $20,668.50 | ![]() |
5 | ENGINEERING FABRIC - ISLAND | 3356 | S.Y. | ![]() | $1.70 | $5,705.20 | ![]() | $1.50 | $5,034.00 | ![]() | $1.35 | $4,530.60 | ![]() |
6 | ENGINEERING FABRIC - HABITAT | 1010 | S.Y. | ![]() | $1.80 | $1,818.00 | ![]() | $1.50 | $1,515.00 | ![]() | $1.35 | $1,363.50 | ![]() |
7 | CONCRETE GROUT | 334 | C.Y. | ![]() | $191.00 | $63,794.00 | ![]() | $235.00 | $78,490.00 | ![]() | $205.00 | $68,470.00 | ![]() |
8 | SHOT ROCK - WASTE POINTS | 4120 | Tons | ![]() | $21.65 | $89,198.00 | ![]() | $17.50 | $72,100.00 | ![]() | $19.45 | $80,134.00 | ![]() |
9 | SHOT ROCK - HABITAT | 2990 | Tons | ![]() | $26.00 | $77,740.00 | ![]() | $16.00 | $47,840.00 | ![]() | $19.45 | $58,155.50 | ![]() |
10 | 3/8" MINUS CRUSHED STONE | 51 | Tons | ![]() | $24.00 | $1,224.00 | ![]() | $15.00 | $765.00 | ![]() | $12.25 | $624.75 | ![]() |
11 | 6" STRUCTURAL CONCRETE - BOAT RAMP | 1314 | S.Y. | ![]() | $50.00 | $65,700.00 | ![]() | $48.24 | $63,387.36 | ![]() | $75.00 | $98,550.00 | ![]() |
12 | 6" PCC SIDEWALK | 72 | S.Y. | ![]() | $54.00 | $3,888.00 | ![]() | $45.09 | $3,246.48 | ![]() | $65.00 | $4,680.00 | ![]() |
13 | CLASS A CRUSHED STONE | 3734 | Tons | ![]() | $14.75 | $55,076.50 | ![]() | $16.00 | $59,744.00 | ![]() | $13.25 | $49,475.50 | ![]() |
14 | ROAD GRADING | 5069 | L.F. | ![]() | $0.35 | $1,774.15 | ![]() | $1.50 | $7,603.50 | ![]() | $2.00 | $10,138.00 | ![]() |
15 | DITCH CLEANOUT | 10138 | L.F. | ![]() | $1.15 | $11,658.70 | ![]() | $1.00 | $10,138.00 | ![]() | $2.85 | $28,893.30 | ![]() |
16 | PAVEMENT REMOVAL | 955 | S.Y. | ![]() | $3.15 | $3,008.25 | ![]() | $3.50 | $3,342.50 | ![]() | $4.00 | $3,820.00 | ![]() |
17 | GEOCELL, 6" | 8388 | S.F. | ![]() | $2.00 | $16,776.00 | ![]() | $3.00 | $25,164.00 | ![]() | $3.40 | $28,519.20 | ![]() |
18 | POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL | 614 | Tons | ![]() | $25.50 | $15,657.00 | ![]() | $29.00 | $17,806.00 | ![]() | $27.00 | $16,578.00 | ![]() |
19 | SHEET PILE | 940 | S.F. | ![]() | $31.47 | $29,581.80 | ![]() | $40.00 | $37,600.00 | ![]() | $27.50 | $25,850.00 | ![]() |
20 | BRIDGE PLANKS | 282 | L.F. | ![]() | $31.50 | $8,883.00 | ![]() | $25.00 | $7,050.00 | ![]() | $36.00 | $10,152.00 | ![]() |
21 | ALUMINUM RAIL SECTION | 5 | Each | ![]() | $966.80 | $4,834.00 | ![]() | $3,000.00 | $15,000.00 | ![]() | $1,250.00 | $6,250.00 | ![]() |
22 | RELOCATE POWER POLE | 1 | Each | ![]() | $800.00 | $800.00 | ![]() | $1,500.00 | $1,500.00 | ![]() | $3,150.00 | $3,150.00 | ![]() |
23 | SITE RESTORATION | 1 | L.S. | ![]() | $23,000.00 | $23,000.00 | ![]() | $35,000.00 | $35,000.00 | ![]() | $20,000.00 | $20,000.00 | ![]() |
24 | CONSTRUCTION SURVEY | 1 | L.S. | ![]() | $14,000.00 | $14,000.00 | ![]() | $5,000.00 | $5,000.00 | ![]() | $10,000.00 | $10,000.00 | ![]() |
25 | MOBILIZATION | 1 | L.S. | ![]() | $34,200.00 | $34,200.00 | ![]() | $25,000.00 | $25,000.00 | ![]() | $75,000.00 | $75,000.00 | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
$2,230,539.65 | ![]() | $2,459,087.04 | ![]() | $2,482,938.10 | ![]() | ||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | 4 | 5 | 6 | ![]() | |||||||||
Estimated Cost: $2,700,000.00 | Contractor: | ![]() | LANGMAN CONSTRUCTION INC | Legacy Corporation of Illinois | Connolly Construction Inc | ![]() | |||||||
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management | ![]() | 220 - 34TH AVENUE | ![]() | 16322 Barstow Road | ![]() | 18409 N Cascade Rd PO Box 68 | ![]() | ||||||
![]() | ROCK ISLAND IL 61201 | ![]() | East Moline IL 61244 | ![]() | Peosta IA 52068 | ![]() | |||||||
Plan Sets Requested: 14 | Quantities | ![]() | (309)786-8885 | ![]() | 309-203-1094 | ![]() | 563-876-3225 | ![]() | |||||
No. | Description: | No. | Unit | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
1 | EXCAVATION, CLASS 10 | 37207 | C.Y. | ![]() | $2.00 | $74,414.00 | ![]() | $4.00 | $148,828.00 | ![]() | $4.38 | $162,966.66 | ![]() |
2 | REVETMENT, CLASS E - SHORELINE | 47318 | Tons | ![]() | $36.50 | $1,727,107.00 | ![]() | $36.00 | $1,703,448.00 | ![]() | $40.05 | $1,895,085.90 | ![]() |
3 | REVETMENT, CLASS E - ISLAND | 1330 | Tons | ![]() | $36.50 | $48,545.00 | ![]() | $36.00 | $47,880.00 | ![]() | $44.28 | $58,892.40 | ![]() |
4 | ENGINEERING FABRIC - SHORELINE | 15310 | S.Y. | ![]() | $1.00 | $15,310.00 | ![]() | $2.00 | $30,620.00 | ![]() | $1.41 | $21,587.10 | ![]() |
5 | ENGINEERING FABRIC - ISLAND | 3356 | S.Y. | ![]() | $1.00 | $3,356.00 | ![]() | $2.00 | $6,712.00 | ![]() | $1.40 | $4,698.40 | ![]() |
6 | ENGINEERING FABRIC - HABITAT | 1010 | S.Y. | ![]() | $1.00 | $1,010.00 | ![]() | $2.00 | $2,020.00 | ![]() | $1.17 | $1,181.70 | ![]() |
7 | CONCRETE GROUT | 334 | C.Y. | ![]() | $125.00 | $41,750.00 | ![]() | $225.00 | $75,150.00 | ![]() | $194.40 | $64,929.60 | ![]() |
8 | SHOT ROCK - WASTE POINTS | 4120 | Tons | ![]() | $19.00 | $78,280.00 | ![]() | $19.50 | $80,340.00 | ![]() | $24.23 | $99,827.60 | ![]() |
9 | SHOT ROCK - HABITAT | 2990 | Tons | ![]() | $19.00 | $56,810.00 | ![]() | $19.50 | $58,305.00 | ![]() | $23.62 | $70,623.80 | ![]() |
10 | 3/8" MINUS CRUSHED STONE | 51 | Tons | ![]() | $30.00 | $1,530.00 | ![]() | $50.00 | $2,550.00 | ![]() | $26.96 | $1,374.96 | ![]() |
11 | 6" STRUCTURAL CONCRETE - BOAT RAMP | 1314 | S.Y. | ![]() | $60.00 | $78,840.00 | ![]() | $83.00 | $109,062.00 | ![]() | $98.58 | $129,534.12 | ![]() |
12 | 6" PCC SIDEWALK | 72 | S.Y. | ![]() | $60.00 | $4,320.00 | ![]() | $72.00 | $5,184.00 | ![]() | $66.55 | $4,791.60 | ![]() |
13 | CLASS A CRUSHED STONE | 3734 | Tons | ![]() | $15.00 | $56,010.00 | ![]() | $17.00 | $63,478.00 | ![]() | $17.46 | $65,195.64 | ![]() |
14 | ROAD GRADING | 5069 | L.F. | ![]() | $0.60 | $3,041.40 | ![]() | $2.50 | $12,672.50 | ![]() | $1.17 | $5,930.73 | ![]() |
15 | DITCH CLEANOUT | 10138 | L.F. | ![]() | $1.00 | $10,138.00 | ![]() | $3.25 | $32,948.50 | ![]() | $2.97 | $30,109.86 | ![]() |
16 | PAVEMENT REMOVAL | 955 | S.Y. | ![]() | $3.00 | $2,865.00 | ![]() | $8.50 | $8,117.50 | ![]() | $4.98 | $4,755.90 | ![]() |
17 | GEOCELL, 6" | 8388 | S.F. | ![]() | $1.25 | $10,485.00 | ![]() | $3.00 | $25,164.00 | ![]() | $2.20 | $18,453.60 | ![]() |
18 | POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL | 614 | Tons | ![]() | $28.00 | $17,192.00 | ![]() | $34.00 | $20,876.00 | ![]() | $36.76 | $22,570.64 | ![]() |
19 | SHEET PILE | 940 | S.F. | ![]() | $25.00 | $23,500.00 | ![]() | $30.00 | $28,200.00 | ![]() | $22.04 | $20,717.60 | ![]() |
20 | BRIDGE PLANKS | 282 | L.F. | ![]() | $6.00 | $1,692.00 | ![]() | $25.00 | $7,050.00 | ![]() | $16.49 | $4,650.18 | ![]() |
21 | ALUMINUM RAIL SECTION | 5 | Each | ![]() | $1,000.00 | $5,000.00 | ![]() | $500.00 | $2,500.00 | ![]() | $1,399.78 | $6,998.90 | ![]() |
22 | RELOCATE POWER POLE | 1 | Each | ![]() | $400.00 | $400.00 | ![]() | $5,000.00 | $5,000.00 | ![]() | $2,214.12 | $2,214.12 | ![]() |
23 | SITE RESTORATION | 1 | L.S. | ![]() | $1,000.00 | $1,000.00 | ![]() | $10,000.00 | $10,000.00 | ![]() | $30,444.81 | $30,444.81 | ![]() |
24 | CONSTRUCTION SURVEY | 1 | L.S. | ![]() | $1,000.00 | $1,000.00 | ![]() | $15,000.00 | $15,000.00 | ![]() | $9,609.09 | $9,609.09 | ![]() |
25 | MOBILIZATION | 1 | L.S. | ![]() | $251,500.00 | $251,500.00 | ![]() | $140,000.00 | $140,000.00 | ![]() | $73,625.70 | $73,625.70 | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
$2,515,095.40 | ![]() | $2,641,105.50 | ![]() | $2,810,770.61 | ![]() | ||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | 7 | 8 | 9 | ![]() | |||||||||
Estimated Cost: $2,700,000.00 | Contractor: | ![]() | Landwehr Construction, Inc | Cole Construction Company Inc | Gehrke Inc. | ![]() | |||||||
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management | ![]() | PO Box 1086 | ![]() | 24100 Queen Ave | ![]() | 1405 - 21st Ave | ![]() | ||||||
![]() | St. Cloud MN 56302 | ![]() | Keosauqua IA 525658329 | ![]() | Eldora IA 50627 | ![]() | |||||||
Plan Sets Requested: 14 | Quantities | ![]() | 320-252-1494 | ![]() | 319-592-3103 | ![]() | 641-858-3821 | ![]() | |||||
No. | Description: | No. | Unit | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
1 | EXCAVATION, CLASS 10 | 37207 | C.Y. | ![]() | $3.90 | $145,107.30 | ![]() | $2.85 | $106,039.95 | ![]() | $6.65 | $247,426.55 | ![]() |
2 | REVETMENT, CLASS E - SHORELINE | 47318 | Tons | ![]() | $45.25 | $2,141,139.50 | ![]() | $43.25 | $2,046,503.50 | ![]() | $38.90 | $1,840,670.20 | ![]() |
3 | REVETMENT, CLASS E - ISLAND | 1330 | Tons | ![]() | $55.00 | $73,150.00 | ![]() | $43.25 | $57,522.50 | ![]() | $44.23 | $58,825.90 | ![]() |
4 | ENGINEERING FABRIC - SHORELINE | 15310 | S.Y. | ![]() | $1.50 | $22,965.00 | ![]() | $2.10 | $32,151.00 | ![]() | $1.93 | $29,548.30 | ![]() |
5 | ENGINEERING FABRIC - ISLAND | 3356 | S.Y. | ![]() | $1.50 | $5,034.00 | ![]() | $2.10 | $7,047.60 | ![]() | $2.60 | $8,725.60 | ![]() |
6 | ENGINEERING FABRIC - HABITAT | 1010 | S.Y. | ![]() | $2.50 | $2,525.00 | ![]() | $2.10 | $2,121.00 | ![]() | $2.60 | $2,626.00 | ![]() |
7 | CONCRETE GROUT | 334 | C.Y. | ![]() | $150.00 | $50,100.00 | ![]() | $350.00 | $116,900.00 | ![]() | $150.00 | $50,100.00 | ![]() |
8 | SHOT ROCK - WASTE POINTS | 4120 | Tons | ![]() | $27.06 | $111,487.20 | ![]() | $25.50 | $105,060.00 | ![]() | $28.45 | $117,214.00 | ![]() |
9 | SHOT ROCK - HABITAT | 2990 | Tons | ![]() | $27.06 | $80,909.40 | ![]() | $25.50 | $76,245.00 | ![]() | $28.45 | $85,065.50 | ![]() |
10 | 3/8" MINUS CRUSHED STONE | 51 | Tons | ![]() | $29.00 | $1,479.00 | ![]() | $17.25 | $879.75 | ![]() | $36.12 | $1,842.12 | ![]() |
11 | 6" STRUCTURAL CONCRETE - BOAT RAMP | 1314 | S.Y. | ![]() | $10.00 | $13,140.00 | ![]() | $48.24 | $63,387.36 | ![]() | $67.00 | $88,038.00 | ![]() |
12 | 6" PCC SIDEWALK | 72 | S.Y. | ![]() | $25.00 | $1,800.00 | ![]() | $45.09 | $3,246.48 | ![]() | $67.00 | $4,824.00 | ![]() |
13 | CLASS A CRUSHED STONE | 3734 | Tons | ![]() | $15.10 | $56,383.40 | ![]() | $19.50 | $72,813.00 | ![]() | $20.50 | $76,547.00 | ![]() |
14 | ROAD GRADING | 5069 | L.F. | ![]() | $1.50 | $7,603.50 | ![]() | $2.96 | $15,004.24 | ![]() | $2.70 | $13,686.30 | ![]() |
15 | DITCH CLEANOUT | 10138 | L.F. | ![]() | $2.50 | $25,345.00 | ![]() | $3.00 | $30,414.00 | ![]() | $3.94 | $39,943.72 | ![]() |
16 | PAVEMENT REMOVAL | 955 | S.Y. | ![]() | $3.00 | $2,865.00 | ![]() | $7.00 | $6,685.00 | ![]() | $12.00 | $11,460.00 | ![]() |
17 | GEOCELL, 6" | 8388 | S.F. | ![]() | $2.50 | $20,970.00 | ![]() | $4.90 | $41,101.20 | ![]() | $2.50 | $20,970.00 | ![]() |
18 | POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL | 614 | Tons | ![]() | $36.71 | $22,539.94 | ![]() | $40.00 | $24,560.00 | ![]() | $43.50 | $26,709.00 | ![]() |
19 | SHEET PILE | 940 | S.F. | ![]() | $37.00 | $34,780.00 | ![]() | $50.00 | $47,000.00 | ![]() | $66.00 | $62,040.00 | ![]() |
20 | BRIDGE PLANKS | 282 | L.F. | ![]() | $20.53 | $5,789.46 | ![]() | $40.00 | $11,280.00 | ![]() | $46.00 | $12,972.00 | ![]() |
21 | ALUMINUM RAIL SECTION | 5 | Each | ![]() | $1,000.00 | $5,000.00 | ![]() | $845.00 | $4,225.00 | ![]() | $4,000.00 | $20,000.00 | ![]() |
22 | RELOCATE POWER POLE | 1 | Each | ![]() | $2,000.00 | $2,000.00 | ![]() | $2,500.00 | $2,500.00 | ![]() | $2,500.00 | $2,500.00 | ![]() |
23 | SITE RESTORATION | 1 | L.S. | ![]() | $30,000.00 | $30,000.00 | ![]() | $15,000.00 | $15,000.00 | ![]() | $42,000.00 | $42,000.00 | ![]() |
24 | CONSTRUCTION SURVEY | 1 | L.S. | ![]() | $15,000.00 | $15,000.00 | ![]() | $5,000.00 | $5,000.00 | ![]() | $10,000.00 | $10,000.00 | ![]() |
25 | MOBILIZATION | 1 | L.S. | ![]() | $18,000.00 | $18,000.00 | ![]() | $95,000.00 | $95,000.00 | ![]() | $167,000.00 | $167,000.00 | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
$2,895,112.70 | ![]() | $2,987,686.58 | ![]() | $3,040,734.19 | ![]() | ||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | 10 | 11 | 12 | ![]() | |||||||||
Estimated Cost: $2,700,000.00 | Contractor: | ![]() | Miller Trucking & Excav | ![]() | |||||||||
Funding Source: 45% Lake Restoration, 25% Marine Fuel Tax, 25% Federal-Boat Safety (Coast Guard), 5% REAP Land Management | ![]() | 3033 John Deere Rd | ![]() | ![]() | ![]() | ||||||||
![]() | Silvis IL 61282 | ![]() | ![]() | ![]() | |||||||||
Plan Sets Requested: 14 | Quantities | ![]() | (309) 755-7644 | ![]() | ![]() | ![]() | |||||||
No. | Description: | No. | Unit | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() | Unit Price | Amount | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
1 | EXCAVATION, CLASS 10 | 37207 | C.Y. | ![]() | $5.00 | $186,035.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
2 | REVETMENT, CLASS E - SHORELINE | 47318 | Tons | ![]() | $45.00 | $2,129,310.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
3 | REVETMENT, CLASS E - ISLAND | 1330 | Tons | ![]() | $45.00 | $59,850.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
4 | ENGINEERING FABRIC - SHORELINE | 15310 | S.Y. | ![]() | $1.00 | $15,310.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
5 | ENGINEERING FABRIC - ISLAND | 3356 | S.Y. | ![]() | $1.00 | $3,356.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
6 | ENGINEERING FABRIC - HABITAT | 1010 | S.Y. | ![]() | $1.00 | $1,010.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
7 | CONCRETE GROUT | 334 | C.Y. | ![]() | $160.00 | $53,440.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
8 | SHOT ROCK - WASTE POINTS | 4120 | Tons | ![]() | $25.00 | $103,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
9 | SHOT ROCK - HABITAT | 2990 | Tons | ![]() | $25.00 | $74,750.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
10 | 3/8" MINUS CRUSHED STONE | 51 | Tons | ![]() | $25.00 | $1,275.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
11 | 6" STRUCTURAL CONCRETE - BOAT RAMP | 1314 | S.Y. | ![]() | $50.00 | $65,700.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
12 | 6" PCC SIDEWALK | 72 | S.Y. | ![]() | $50.00 | $3,600.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
13 | CLASS A CRUSHED STONE | 3734 | Tons | ![]() | $15.00 | $56,010.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
14 | ROAD GRADING | 5069 | L.F. | ![]() | $4.00 | $20,276.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
15 | DITCH CLEANOUT | 10138 | L.F. | ![]() | $6.00 | $60,828.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
16 | PAVEMENT REMOVAL | 955 | S.Y. | ![]() | $10.00 | $9,550.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
17 | GEOCELL, 6" | 8388 | S.F. | ![]() | $3.00 | $25,164.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
18 | POROUS BACKFILL (IDOT GRAD. 20, 21) PEA GRAVEL | 614 | Tons | ![]() | $40.00 | $24,560.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
19 | SHEET PILE | 940 | S.F. | ![]() | $40.00 | $37,600.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
20 | BRIDGE PLANKS | 282 | L.F. | ![]() | $45.00 | $12,690.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
21 | ALUMINUM RAIL SECTION | 5 | Each | ![]() | $1,200.00 | $6,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
22 | RELOCATE POWER POLE | 1 | Each | ![]() | $1,500.00 | $1,500.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
23 | SITE RESTORATION | 1 | L.S. | ![]() | $45,000.00 | $45,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
24 | CONSTRUCTION SURVEY | 1 | L.S. | ![]() | $20,000.00 | $20,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
25 | MOBILIZATION | 1 | L.S. | ![]() | $75,000.00 | $75,000.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
$3,090,814.00 | ![]() | $0.00 | ![]() | $0.00 | ![]() | ||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |