|
IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Honey Creek Resort | Date: 5/12/2016 | Project No. |
| Storm Water Improvements & Raingarden | County: | APPANOOSE | Time: 3:00 p.m. | 15-05-04-06 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $18,418.00 | Contractor: | Hymbaugh Construction | McGee Concrete and Landscaping | All Terrain Seeding | |||||||||
| Funding Source: 100% Federal-EPA, | 821 Quiet Harbor | 219 N Fryer St | 2 Schwartz Dr | ||||||||||
| Creston IA 50801 | Russell IA 50238 | Ottumwa IA 52501 | |||||||||||
| Plan Sets Requested: 0 | Quantities | 641-340-0232 | 641-203-0717 | 641-777-1011 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Sand (25 Tons) | 1 | L.S. | $40.00 | $40.00 | $800.00 | $800.00 | $687.25 | $687.25 | ||||
| 2 | 3/8" Clean Chips (3 Tons) | 1 | L.S. | $600.00 | $600.00 | $275.00 | $275.00 | $223.50 | $223.50 | ||||
| 3 | 6" Perforated Subdrain | 226 | L.F. | $10.00 | $2,260.00 | $9.40 | $2,124.40 | $7.80 | $1,762.80 | ||||
| 4 | Roto Tilling Rain Garden | 700 | S.F. | $1.00 | $700.00 | $1.00 | $700.00 | $0.75 | $525.00 | ||||
| 5 | 6" PVC | 260 | L.F. | $10.00 | $2,600.00 | $11.55 | $3,003.00 | $11.45 | $2,977.00 | ||||
| 6 | Roof Drain Connections | 3 | Each | $200.00 | $600.00 | $66.70 | $200.10 | $27.00 | $81.00 | ||||
| 7 | 6" PVC Standpipe | 1 | Each | $800.00 | $800.00 | $100.00 | $100.00 | $129.00 | $129.00 | ||||
| 8 | Shredded Hardwood Mulch | 5 | C.Y. | $100.00 | $500.00 | $90.00 | $450.00 | $53.00 | $265.00 | ||||
| 9 | Topsoil (4 CY) | 1 | L.S. | $800.00 | $800.00 | $400.00 | $400.00 | $148.00 | $148.00 | ||||
| 10 | Kentucky Bluegrass Seeding, Fertilizer, Mulch | 1 | L.S. | $400.00 | $400.00 | $850.00 | $850.00 | $2,615.00 | $2,615.00 | ||||
| 11 | Prairie Dropseed Plugs | 108 | Each | $5.00 | $540.00 | $6.50 | $702.00 | $5.72 | $617.76 | ||||
| 12 | Little Bluestem Plugs | 225 | Each | $5.00 | $1,125.00 | $8.50 | $1,912.50 | $5.72 | $1,287.00 | ||||
| 13 | Rain Garden Earthwork | 1 | L.S. | $2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 | $830.00 | $830.00 | ||||
| 14 | Sidewalk Panel Removal & Disposal | 22 | S.Y. | $20.00 | $440.00 | $36.40 | $800.80 | $29.25 | $643.50 | ||||
| 15 | Sidewalk Panel Replacement (8") | 22 | S.Y. | $60.00 | $1,320.00 | $81.85 | $1,800.70 | $119.10 | $2,620.20 | ||||
| 16 | Trench Drain | 14 | L.F. | $100.00 | $1,400.00 | $66.10 | $925.40 | $129.00 | $1,806.00 | ||||
| 17 | 6" Rodent Guards | 4 | Each | $25.00 | $100.00 | $41.25 | $165.00 | $26.85 | $107.40 | ||||
| 18 | Diversion Ditches | 5 | Each | $400.00 | $2,000.00 | $480.00 | $2,400.00 | $385.00 | $1,925.00 | ||||
| 19 | Mobilization | 1 | L.S. | $500.00 | $500.00 | $1,000.00 | $1,000.00 | $2,550.00 | $2,550.00 | ||||
| $18,725.00 | $19,608.90 | $21,800.41 | |||||||||||
12/17/2025