IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Bowstring Bridge Canoe Access  Date: 7/21/2016  Project No.  
  Canoe Access and Parking Lot  County:   WINNESHIEK  Time: 11:00 a.m.  16-03-96-01

 

 
1
2
3
Estimated Cost: $384,000.00
Contractor: 
Skyline Construction Inc.Wicks Construction IncBacon Concrete, LLC
Funding Source: 100% Marine Fuel Tax, 900 Montgomery St
PO Box 428
370 N Bancroft St
Decorah IA  52101Decorah IA  52101Postville IA  52162-0188
Plan Sets Requested: 8
Quantities
563-382-2933563-382-2325563-864-7602
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1CLEARING AND GRUBBING1L.S.$3,500.00$3,500.00 $3,500.00$3,500.00 $500.00$500.00 
2REMOVAL OF PAVEMENT1546S.Y.$6.66$10,296.36 $6.65$10,280.90 $4.00$6,184.00 
3REMOVAL OF EXISTING ROCK SURFACING863S.Y.$1.00$863.00 $1.00$863.00 $3.20$2,761.60 
4PAVING, P.C. CONCRETE, 7"3317S.Y.$31.00$102,827.00 $41.50$137,655.50 $48.00$159,216.00 
5GRANULAR SUBBASE4194S.Y.$6.25$26,212.50 $6.25$26,212.50 $6.85$28,728.90 
6CLASS "A" CRUSHED STONE134Tons$18.95$2,539.30 $18.95$2,539.30 $15.75$2,110.50 
72" CRUSHED STONE107Tons$10.00$1,070.00 $10.00$1,070.00 $7.80$834.60 
8ENGINEERING FABRIC1226S.Y.$2.25$2,758.50 $2.25$2,758.50 $1.30$1,593.80 
9PAVING, P.C. CONCRETE TRAIL, 6"196S.Y.$40.00$7,840.00 $57.35$11,240.60 $44.00$8,624.00 
10SIGNING15Each$210.00$3,150.00 $250.00$3,750.00 $375.00$5,625.00 
11SITE WORK1L.S.$15,000.00$15,000.00 $14,000.00$14,000.00 $15,000.00$15,000.00 
12REVETMENT, CLASS E809Tons$18.95$15,330.55 $18.95$15,330.55 $21.90$17,717.10 
13VEGETATED FILTER STRIP0.1Acres$30,000.00$3,000.00 $30,000.00$3,000.00 $4,000.00$400.00 
14EROSION CONTROL1010L.F.$10.50$10,605.00 $2.85$2,878.50 $2.30$2,323.00 
15PAINTED PAVEMENT MARKINGS, WATERBORNE/SOLVENT1L.S.$2,800.00$2,800.00 $2,000.00$2,000.00 $1,200.00$1,200.00 
16PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASED6Each$79.00$474.00 $100.00$600.00 $50.00$300.00 
17TEMPORARY TRAIL1L.S.$5,000.00$5,000.00 $4,000.00$4,000.00 $3,700.00$3,700.00 
18TRAFFIC CONTROL1L.S.$2,500.00$2,500.00 $4,000.00$4,000.00 $5,500.00$5,500.00 
19CONSTRUCTION STAKING1L.S.$5,500.00$5,500.00 $6,000.00$6,000.00 $3,500.00$3,500.00 
20MOBILIZATION1L.S.$30,100.00$30,100.00 $5,000.00$5,000.00 $24,000.00$24,000.00 
21EXCAVATION, CLASS 10, ROADWAY AND BORROW3300C.Y.$8.55$28,215.00 $8.55$28,215.00 $10.65$35,145.00 
      $279,581.21  $284,894.35  $324,963.50 
 
4
5
6
Estimated Cost: $384,000.00
Contractor: 
H & H Construction & Dev. LLCRiehm Construction
Funding Source: 100% Marine Fuel Tax, 60559 HWY 64
2340 9th St SW

Sabula IA  52070Waukon IA  52172  
Plan Sets Requested: 8
Quantities
563-357-1849563-568-3314
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1CLEARING AND GRUBBING1L.S.$6,100.00$6,100.00 $2,000.00$2,000.00 $0.00 
2REMOVAL OF PAVEMENT1546S.Y.$4.85$7,498.10 $10.00$15,460.00 $0.00 
3REMOVAL OF EXISTING ROCK SURFACING863S.Y.$1.00$863.00 $5.00$4,315.00 $0.00 
4PAVING, P.C. CONCRETE, 7"3317S.Y.$42.50$140,972.50 $47.00$155,899.00 $0.00 
5GRANULAR SUBBASE4194S.Y.$9.25$38,794.50 $4.45$18,663.30 $0.00 
6CLASS "A" CRUSHED STONE134Tons$17.00$2,278.00 $17.55$2,351.70 $0.00 
72" CRUSHED STONE107Tons$20.00$2,140.00 $18.90$2,022.30 $0.00 
8ENGINEERING FABRIC1226S.Y.$1.85$2,268.10 $1.50$1,839.00 $0.00 
9PAVING, P.C. CONCRETE TRAIL, 6"196S.Y.$57.35$11,240.60 $41.00$8,036.00 $0.00 
10SIGNING15Each$175.00$2,625.00 $275.00$4,125.00 $0.00 
11SITE WORK1L.S.$11,000.00$11,000.00 $16,000.00$16,000.00 $0.00 
12REVETMENT, CLASS E809Tons$21.00$16,989.00 $24.05$19,456.45 $0.00 
13VEGETATED FILTER STRIP0.1Acres$2,000.00$200.00 $2,000.00$200.00 $0.00 
14EROSION CONTROL1010L.F.$3.95$3,989.50 $4.95$4,999.50 $0.00 
15PAINTED PAVEMENT MARKINGS, WATERBORNE/SOLVENT1L.S.$950.00$950.00 $1,200.00$1,200.00 $0.00 
16PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT-BASED6Each$40.00$240.00 $100.00$600.00 $0.00 
17TEMPORARY TRAIL1L.S.$8,500.00$8,500.00 $11,000.00$11,000.00 $0.00 
18TRAFFIC CONTROL1L.S.$3,800.00$3,800.00 $18,000.00$18,000.00 $0.00 
19CONSTRUCTION STAKING1L.S.$3,500.00$3,500.00 $9,775.00$9,775.00 $0.00 
20MOBILIZATION1L.S.$28,150.00$28,150.00 $18,000.00$18,000.00 $0.00 
21EXCAVATION, CLASS 10, ROADWAY AND BORROW3300C.Y.$12.00$39,600.00 $9.25$30,525.00 $0.00 
      $331,698.30  $344,467.25  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Bacon Concrete, LLC, Postville, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.

9/27/2024