IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Box Car Access  Date: 3/19/2015  Project No.  
  Roadway Reconstruction  County:   MARION  Time: 11:00 A.M.  15-05-63-03

 

 
1
2
3
Estimated Cost: $127,000.00
Contractor: 
Savage Dirt Works LLCRW Excavating & DozingH & H Construction & Development LLC
Funding Source: 100% Marine Fuel Tax, 48499 Hy-Vee Rd
13293 S 88th Ave W
60559 Hwy 64
Chariton IA  50049Prairie City IA  50228Sabula IA  52070
Plan Sets Requested: 7
Quantities
641-203-2357515-994-2648563-357-1849
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization & Miscellaneous1L.S.$5,000.00$5,000.00 $10,000.00$10,000.00 $21,500.00$21,500.00 
2Traffic Control / Signage1L.S.$700.00$700.00 $1,000.00$1,000.00 $1,250.00$1,250.00 
3Construction Survey1L.S.$4,800.00$4,800.00 $3,000.00$3,000.00 $5,000.00$5,000.00 
4Excavation3000C.Y.$5.00$15,000.00 $2.60$7,800.00 $14.86$44,580.00 
5Erosion Control1L.S.$2,500.00$2,500.00 $8,000.00$8,000.00 $12,000.00$12,000.00 
6Subgrade Preparation (+2' on either side of granular surfacing)7400S.Y.$2.00$14,800.00 $1.23$9,102.00 $0.30$2,220.00 
7Erosion Stone1500Tons$20.30$30,450.00 $22.50$33,750.00 $26.30$39,450.00 
8Granular Surfacing1900Tons$17.05$32,395.00 $19.20$36,480.00 $23.55$44,745.00 
9Topsoil: Strip, Stockpile & Respread (4")450C.Y.$7.50$3,375.00 $4.50$2,025.00 $5.50$2,475.00 
10Seeding - Stabilization Crop4000S.Y.$0.625$2,500.00 $1.00$4,000.00 $0.87$3,480.00 
      $111,520.00  $115,157.00  $176,700.00 
 
 
4
5
6
Estimated Cost: $127,000.00
Contractor: 
Kevin Kent ConstructionSandstone Management LTDTK Concrete Inc
Funding Source: 100% Marine Fuel Tax, 15157 US Hwy 34
15 School St
1608 Fifield Rd
Lucas IA  50151Carlisle IA  50047Pella IA  50219
Plan Sets Requested: 7
Quantities
641-766-6126(515) 989-0557641-628-4590
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization & Miscellaneous1L.S.$10,000.00$10,000.00 $6,096.00$6,096.00 $90,000.00$90,000.00 
2Traffic Control / Signage1L.S.$1,000.00$1,000.00 $1,524.00$1,524.00 $5,000.00$5,000.00 
3Construction Survey1L.S.$7,500.00$7,500.00 $8,385.00$8,385.00 $10,000.00$10,000.00 
4Excavation3000C.Y.$18.00$54,000.00 $15.31$45,930.00 $20.00$60,000.00 
5Erosion Control1L.S.$7,800.00$7,800.00 $8,723.00$8,723.00 $10,000.00$10,000.00 
6Subgrade Preparation (+2' on either side of granular surfacing)7400S.Y.$2.00$14,800.00 $1.19$8,806.00 $2.75$20,350.00 
7Erosion Stone1500Tons$30.00$45,000.00 $30.48$45,720.00 $32.50$48,750.00 
8Granular Surfacing1900Tons$21.25$40,375.00 $23.37$44,403.00 $30.00$57,000.00 
9Topsoil: Strip, Stockpile & Respread (4")450C.Y.$10.00$4,500.00 $38.68$17,406.00 $22.50$10,125.00 
10Seeding - Stabilization Crop4000S.Y.$1.00$4,000.00 $1.02$4,080.00 $1.10$4,400.00 
      $188,975.00  $191,073.00  $315,625.00 
 



 

5/3/2024