IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lost Grove Lake WMA  Date: 3/24/2016  Project No.  
  PCC Road and Parking  County:   SCOTT  Time: 11:00 A.M.  16-06-82-01

 

 
1
2
3
Estimated Cost: $590,000.00
Contractor: 
BWC Excavating, LCN.J. Miller, Inc.Valley Construction Company
Funding Source: 50% Marine Fuel Tax, 25% Funding Source 1, 25% Funding Source 2, 1303 Hickory Hollow Rd
450 Devils Glen Rd
3610 78th Ave West
PO Box 2020
Solon IA  52333Bettendorf IA  52722Rock Island IL  61204
Plan Sets Requested: 8
Quantities
319-848-7513563-391-1021309-787-0292
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
17" PCC6164S.Y.$33.00$203,412.00 $41.50$255,806.00 $44.00$271,216.00 
2Special Backfill1191Tons$18.00$21,438.00 $20.00$23,820.00 $24.00$28,584.00 
3Granular Shoulders316Tons$22.00$6,952.00 $40.00$12,640.00 $40.00$12,640.00 
4Fishing Abutment3Each$1,500.00$4,500.00 $2,400.00$7,200.00 $1,665.00$4,995.00 
5Re-Grade Ditch1L.S.$9,000.00$9,000.00 $4,000.00$4,000.00 $1,500.00$1,500.00 
6Ditch Check Dam30Each$375.00$11,250.00 $200.00$6,000.00 $100.00$3,000.00 
7Remove Existing Silt Fence100L.F.$1.00$100.00 $2.00$200.00 $2.00$200.00 
8Remove and Salvage Gate and Posts1L.S.$125.00$125.00 $200.00$200.00 $550.00$550.00 
9Roadway Gate1Each$5,250.00$5,250.00 $7,200.00$7,200.00 $4,100.00$4,100.00 
10Signs9Each$375.00$3,375.00 $250.00$2,250.00 $375.00$3,375.00 
115" PCC312S.Y.$45.00$14,040.00 $40.00$12,480.00 $70.00$21,840.00 
12Filter Sock880L.F.$3.50$3,080.00 $2.00$1,760.00 $2.00$1,760.00 
13Site Restoration1L.S.$5,000.00$5,000.00 $8,000.00$8,000.00 $4,000.00$4,000.00 
14Detectable Warning Panel40S.F.$30.00$1,200.00 $60.00$2,400.00 $40.00$1,600.00 
15Pavement Removal393S.Y.$8.00$3,144.00 $16.00$6,288.00 $12.00$4,716.00 
16Move Existing Signs3Each$250.00$750.00 $200.00$600.00 $125.00$375.00 
17Site Work1L.S.$4,250.00$4,250.00 $2,500.00$2,500.00 $1,200.00$1,200.00 
18Double Pit Latrine1Each$50,000.00$50,000.00 $45,000.00$45,000.00 $40,000.00$40,000.00 
1918" RCP32L.F.$46.00$1,472.00 $62.00$1,984.00 $55.00$1,760.00 
2018" RCP Apron2Each$1,800.00$3,600.00 $900.00$1,800.00 $700.00$1,400.00 
21Topsoil, Furnish and Place45C.Y.$50.00$2,250.00 $50.00$2,250.00 $50.00$2,250.00 
22Parking Post Removal13Each$125.00$1,625.00 $40.00$520.00 $30.00$390.00 
23Cable Gate1Each$5,000.00$5,000.00 $2,000.00$2,000.00 $2,150.00$2,150.00 
246" Sloped Curb and Gutter48L.F.$22.00$1,056.00 $50.00$2,400.00 $36.00$1,728.00 
25Reset Parking Posts15Each$150.00$2,250.00 $70.00$1,050.00 $50.00$750.00 
26Class A Crushed Stone60Tons$23.00$1,380.00 $35.00$2,100.00 $19.00$1,140.00 
273/8" Minus Crushed Stone10Tons$24.00$240.00 $75.00$750.00 $25.00$250.00 
28Modify Existing Parking Posts2Each$100.00$200.00 $100.00$200.00 $50.00$100.00 
29Striping360L.F.$1.00$360.00 $2.00$720.00 $1.50$540.00 
30Access Aisle2Each$100.00$200.00 $50.00$100.00 $150.00$300.00 
31Grade Preparation1L.S.$12,000.00$12,000.00 $1,200.00$1,200.00 $1,800.00$1,800.00 
32Parking Post, Furnish and Install12Each$200.00$2,400.00 $125.00$1,500.00 $100.00$1,200.00 
33Rock Chute1L.S.$1,500.00$1,500.00 $3,000.00$3,000.00 $1,350.00$1,350.00 
34Move Boulders1L.S.$350.00$350.00 $200.00$200.00 $100.00$100.00 
35Traffic Control1L.S.$3,000.00$3,000.00 $2,500.00$2,500.00 $2,500.00$2,500.00 
36Mobilization1L.S.$25,000.00$25,000.00 $5,500.00$5,500.00 $30,000.00$30,000.00 
      $410,749.00  $428,118.00  $455,359.00 
Alternate        
377" PCC1874S.Y.$33.00$61,842.00 $41.50$77,771.00 $41.00$76,834.00 
Alternate        
38Special Backfill434Tons$17.00$7,378.00 $20.00$8,680.00 $22.00$9,548.00 
Alternate        
39Granular Shoulders228Tons$24.00$5,472.00 $44.00$10,032.00 $22.00$5,016.00 
Alternate        
407" PCC1168S.Y.$33.00$38,544.00 $41.50$48,472.00 $41.00$47,888.00 
Alternate        
41Special Backfill266Tons$20.00$5,320.00 $20.00$5,320.00 $22.00$5,852.00 
Alternate        
42Granular Shoulders140Tons$25.00$3,500.00 $44.00$6,160.00 $22.00$3,080.00 
      $532,805.00  $584,553.00  $603,577.00 
 
4
5
6
Estimated Cost: $590,000.00
Contractor: 
Triple B Construction CorporationHorsfield Construction, Inc.Miller Trucking & Excavating
Funding Source: 50% Marine Fuel Tax, 25% Funding Source 1, 25% Funding Source 2, 2272 Spicer Ave
505 East Main St
3303 John Deere Rd
Wilton IA  52778Epworth IA  52045Silvis IL  61282
Plan Sets Requested: 8
Quantities
319-631-0320563-876-3335309-755-7644
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
17" PCC6164S.Y.$34.50$212,658.00 $43.00$265,052.00 $54.00$332,856.00 
2Special Backfill1191Tons$25.00$29,775.00 $26.00$30,966.00 $30.00$35,730.00 
3Granular Shoulders316Tons$28.00$8,848.00 $32.00$10,112.00 $32.00$10,112.00 
4Fishing Abutment3Each$1,200.00$3,600.00 $6,000.00$18,000.00 $815.00$2,445.00 
5Re-Grade Ditch1L.S.$11,500.00$11,500.00 $5,000.00$5,000.00 $5,000.00$5,000.00 
6Ditch Check Dam30Each$450.00$13,500.00 $900.00$27,000.00 $550.00$16,500.00 
7Remove Existing Silt Fence100L.F.$2.00$200.00 $5.00$500.00 $1.00$100.00 
8Remove and Salvage Gate and Posts1L.S.$400.00$400.00 $2,500.00$2,500.00 $270.00$270.00 
9Roadway Gate1Each$4,500.00$4,500.00 $10,000.00$10,000.00 $650.00$650.00 
10Signs9Each$160.00$1,440.00 $150.00$1,350.00 $400.00$3,600.00 
115" PCC312S.Y.$41.00$12,792.00 $58.00$18,096.00 $58.00$18,096.00 
12Filter Sock880L.F.$5.00$4,400.00 $5.00$4,400.00 $3.00$2,640.00 
13Site Restoration1L.S.$10,500.00$10,500.00 $5,000.00$5,000.00 $17,000.00$17,000.00 
14Detectable Warning Panel40S.F.$35.00$1,400.00 $40.00$1,600.00 $42.00$1,680.00 
15Pavement Removal393S.Y.$12.00$4,716.00 $18.00$7,074.00 $15.00$5,895.00 
16Move Existing Signs3Each$315.00$945.00 $100.00$300.00 $50.00$150.00 
17Site Work1L.S.$10,000.00$10,000.00 $7,500.00$7,500.00 $15,000.00$15,000.00 
18Double Pit Latrine1Each$51,000.00$51,000.00 $50,000.00$50,000.00 $49,330.00$49,330.00 
1918" RCP32L.F.$100.00$3,200.00 $115.00$3,680.00 $75.00$2,400.00 
2018" RCP Apron2Each$2,100.00$4,200.00 $1,500.00$3,000.00 $1,035.00$2,070.00 
21Topsoil, Furnish and Place45C.Y.$55.00$2,475.00 $50.00$2,250.00 $60.00$2,700.00 
22Parking Post Removal13Each$25.00$325.00 $100.00$1,300.00 $40.00$520.00 
23Cable Gate1Each$2,500.00$2,500.00 $5,000.00$5,000.00 $1,060.00$1,060.00 
246" Sloped Curb and Gutter48L.F.$34.00$1,632.00 $50.00$2,400.00 $48.00$2,304.00 
25Reset Parking Posts15Each$50.00$750.00 $115.00$1,725.00 $25.00$375.00 
26Class A Crushed Stone60Tons$30.00$1,800.00 $35.00$2,100.00 $30.00$1,800.00 
273/8" Minus Crushed Stone10Tons$22.00$220.00 $45.00$450.00 $50.00$500.00 
28Modify Existing Parking Posts2Each$50.00$100.00 $100.00$200.00 $25.00$50.00 
29Striping360L.F.$9.50$3,420.00 $6.00$2,160.00 $3.25$1,170.00 
30Access Aisle2Each$150.00$300.00 $250.00$500.00 $120.00$240.00 
31Grade Preparation1L.S.$3,100.00$3,100.00 $15,000.00$15,000.00 $11,375.00$11,375.00 
32Parking Post, Furnish and Install12Each$100.00$1,200.00 $450.00$5,400.00 $75.00$900.00 
33Rock Chute1L.S.$3,950.00$3,950.00 $5,000.00$5,000.00 $1,630.00$1,630.00 
34Move Boulders1L.S.$200.00$200.00 $1,000.00$1,000.00 $350.00$350.00 
35Traffic Control1L.S.$4,000.00$4,000.00 $5,000.00$5,000.00 $8,000.00$8,000.00 
36Mobilization1L.S.$90,000.00$90,000.00 $77,000.00$77,000.00 $15,000.00$15,000.00 
Alternate        
377" PCC1874S.Y.$33.50$62,779.00 $43.00$80,582.00 $54.00$101,196.00 
Alternate        
38Special Backfill434Tons$25.00$10,850.00 $26.00$11,284.00 $30.00$13,020.00 
Alternate        
39Granular Shoulders228Tons$28.00$6,384.00 $32.00$7,296.00 $32.00$7,296.00 
Alternate        
407" PCC1168S.Y.$33.50$39,128.00 $43.00$50,224.00 $52.00$60,736.00 
Alternate        
41Special Backfill266Tons$25.00$6,650.00 $26.00$6,916.00 $30.00$7,980.00 
Alternate        
42Granular Shoulders140Tons$28.00$3,920.00 $32.00$4,480.00 $32.00$4,480.00 
      $635,257.00  $758,397.00  $764,206.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Horsfield Construction, Inc., Epworth, IA
Triple B Construction Corporation, Wilton, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.