IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Springbrook  Date: 7/23/2015  Project No.  
  Bridge, Road & Culvert Project  County:   GUTHRIE  Time: 3:00 p.m.  15-04-39-02

 

 
1
2
3
Estimated Cost: $974,086.00
Contractor: 
Godbersen-Smith Construction Company IncMurphy Heavy Contracting IncGraves Construction Co., Inc.
Funding Source: 100% Park & Institutional Road Fund, 5784 State Hwy 175
PO Box 33
101 Roosevelt Street
PO BOX 148
1810 340th Street
PO Box 1417
Ida Grove IA  51445Anita IA  50020Spencer IA  51301
Plan Sets Requested: 7
Quantities
712-364-3388712-762-3386712-262-2403
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Removal of Existing Structures1L.S.$5,000.00$5,000.00 $5,000.00$5,000.00 $5,125.00$5,125.00 
2Clearing and Grubbing1L.S.$20,000.00$20,000.00 $2,500.00$2,500.00 $18,025.00$18,025.00 
3Full Depth Saw Cut3704L.F.$6.00$22,224.00 $4.00$14,816.00 $2.55$9,445.20 
4HMA Pavement Removal1055S.Y.$14.00$14,770.00 $12.00$12,660.00 $15.45$16,299.75 
512-inch RCP Class III1204L.F.$56.00$67,424.00 $60.00$72,240.00 $61.20$73,684.80 
615-inch RCP Class III435L.F.$57.25$24,903.75 $65.00$28,275.00 $67.32$29,284.20 
718-inch RCP Class III60L.F.$90.50$5,430.00 $90.00$5,400.00 $81.60$4,896.00 
8SW-501 Single Grate Intake w/SW-603 Type ‘R’ Casting10Each$2,400.00$24,000.00 $2,500.00$25,000.00 $3,162.00$31,620.00 
9SW-512 Circular Area Intake (24” Riser) w/SW-604 Type ‘3B’ Casting1Each$1,500.00$1,500.00 $1,500.00$1,500.00 $2,040.00$2,040.00 
10SW-512 Circular Area Intake (18” Riser) w/SW-604 Type ‘3B’ Casting4Each$1,250.00$5,000.00 $1,250.00$5,000.00 $2,040.00$8,160.00 
11SW-513 4’X4’ Open Sided Intake w/SW-602 Type ‘G’ Casting1Each$3,000.00$3,000.00 $3,250.00$3,250.00 $5,610.00$5,610.00 
12Special Backfill409Tons$35.00$14,315.00 $100.00$40,900.00 $45.90$18,773.10 
13Granular Shoulder126Tons$34.00$4,284.00 $100.00$12,600.00 $35.70$4,498.20 
14Surface Preparation3303S.Y.$10.00$33,030.00 $1.00$3,303.00 $12.24$40,428.72 
15PCC Pavement Placement4539S.Y.$13.50$61,276.50 $16.00$72,624.00 $32.64$148,152.96 
16Iowa DOT Class ‘C’ Concrete1011C.Y.$110.00$111,210.00 $115.00$116,265.00 $127.50$128,902.50 
1736-inch #4 Epoxy Coated Reinforcing Bar714Each$7.50$5,355.00 $1.50$1,071.00 $8.16$5,826.24 
18Finish Grading1L.S.$30,000.00$30,000.00 $20,000.00$20,000.00 $17,000.00$17,000.00 
19Seeding, Fertilizing and Mulching1L.S.$15,000.00$15,000.00 $3,650.00$3,650.00 $7,500.00$7,500.00 
208-inch Filter Sock100L.F.$3.50$350.00 $5.00$500.00 $7.00$700.00 
21Traffic Control1L.S.$2,500.00$2,500.00 $1,000.00$1,000.00 $2,000.00$2,000.00 
22Construction Survey Staking1L.S.$14,000.00$14,000.00 $10,800.00$10,800.00 $10,800.00$10,800.00 
23Mobilization1L.S.$110,000.00$110,000.00 $50,000.00$50,000.00 $95,000.00$95,000.00 
24Excavation, Class 10, Channel444C.Y.$7.00$3,108.00 $16.00$7,104.00 $5.00$2,220.00 
25Removal of Existing Structures1L.S.$15,000.00$15,000.00 $25,000.00$25,000.00 $14,000.00$14,000.00 
26Excavation, Class 2073C.Y.$35.00$2,555.00 $25.00$1,825.00 $80.00$5,840.00 
27Structural Concrete (Bridge)152.2C.Y.$650.00$98,930.00 $575.00$87,515.00 $560.00$85,232.00 
28Reinforcing Steel102LB.$2.00$204.00 $2.00$204.00 $5.00$510.00 
29Reinforcing Steel, Epoxy Coated38439LB.$1.10$42,282.90 $1.30$49,970.70 $1.00$38,439.00 
30Reinforcing Steel, Stainless Steel1834LB.$4.00$7,336.00 $5.00$9,170.00 $5.00$9,170.00 
31Concrete Open Railing, TL-4162L.F.$65.00$10,530.00 $85.00$13,770.00 $70.00$11,340.00 
32Piles, Steel, HP 10 X 42790L.F.$46.00$36,340.00 $40.00$31,600.00 $48.00$37,920.00 
33Concrete Encasement of Steel H-Piles, HP 10X42 (PIOL Type 3)146.3L.F.$75.00$10,972.50 $110.00$16,093.00 $240.00$35,112.00 
34Engineering Fabric399.5S.Y.$3.50$1,398.25 $3.00$1,198.50 $3.00$1,198.50 
35Revetment, Class ‘E’361.9Tons$55.00$19,904.50 $50.00$18,095.00 $50.00$18,095.00 
36Mobilization1L.S.$65,000.00$65,000.00 $40,000.00$40,000.00 $45,000.00$45,000.00 
37Clearing and Grubbing3.3Units$200.00$660.00 $500.00$1,650.00 $412.00$1,359.60 
38Special Backfill94Tons$40.00$3,760.00 $100.00$9,400.00 $40.80$3,835.20 
39Embankment-in-Place62C.Y.$22.00$1,364.00 $20.00$1,240.00 $30.60$1,897.20 
40Excavation, Class 10, Roadway and Borrow107C.Y.$15.00$1,605.00 $15.00$1,605.00 $30.60$3,274.20 
41Excavation, Class 12, Boulders or Rock Fragments10C.Y.$25.00$250.00 $300.00$3,000.00 $100.00$1,000.00 
42Topsoil, Strip, Salvage and Spread173C.Y.$14.00$2,422.00 $20.00$3,460.00 $30.60$5,293.80 
43Granular Shoulders, Type A63.4Tons$35.00$2,219.00 $100.00$6,340.00 $35.70$2,263.38 
44Shoulder Construction, Earth3.7STA.$450.00$1,665.00 $2,000.00$7,400.00 $408.00$1,509.60 
45Bridge Approach, Two Lane267S.Y.$165.00$44,055.00 $200.00$53,400.00 $182.00$48,594.00 
46Standard or Slip Form Portland Cement Concrete Pavement, Class C, Class 2, Durability, 7 in249.5S.Y.$68.00$16,966.00 $150.00$37,425.00 $87.00$21,706.50 
47Removal of Pavement620S.Y.$14.00$8,680.00 $20.00$12,400.00 $15.45$9,579.00 
48Safety Closure3Each$150.00$450.00 $150.00$450.00 $250.00$750.00 
49Field Laboratory1Each$6,500.00$6,500.00 $10,000.00$10,000.00 $5,000.00$5,000.00 
50Remove and Reinstall Sign as Per Plan4Each$200.00$800.00 $200.00$800.00 $200.00$800.00 
51Construction Survey1L.S.$6,500.00$6,500.00 $5,100.00$5,100.00 $5,100.00$5,100.00 
52Traffic Control1L.S.$4,500.00$4,500.00 $2,750.00$2,750.00 $4,550.00$4,550.00 
53Silt Fence290L.F.$2.25$652.50 $3.00$870.00 $7.00$2,030.00 
54Silt Fence for Ditch Checks120L.F.$2.50$300.00 $4.00$480.00 $7.00$840.00 
55Removal of Silt Fence or Silt Fence for Ditch Checks410L.F.$1.00$410.00 $1.00$410.00 $1.00$410.00 
56Maintenance of Silt Fence or Silt Fence for Ditch Check40L.F.$1.00$40.00 $1.50$60.00 $1.00$40.00 
57Floating Silt Curtain (Hanging)200L.F.$28.00$5,600.00 $35.00$7,000.00 $30.00$6,000.00 
58Maintenance of Floating Silt Curtain100L.F.$10.00$1,000.00 $10.00$1,000.00 $1.00$100.00 
59Perimeter and Slope Sediment Control Device, 12 in Dia200L.F.$4.00$800.00 $3.50$700.00 $5.00$1,000.00 
60Perimeter and Slope Sediment Control Device, 20 in Dia200L.F.$4.50$900.00 $5.00$1,000.00 $5.00$1,000.00 
61Removal of Perimeter and Slope Sediment Control Device400L.F.$1.00$400.00 $1.50$600.00 $1.00$400.00 
62Mobilizations, Erosion Control1Each$750.00$750.00 $500.00$500.00 $500.00$500.00 
63Mobilizations, Emergency Erosion Control1Each$1,000.00$1,000.00 $1,000.00$1,000.00 $500.00$500.00 
64Excavation, Class 10, Channel217C.Y.$7.00$1,519.00 $40.00$8,680.00 $5.00$1,085.00 
65Granular Material for Blanket and Subdrain59.3C.Y.$65.00$3,854.50 $100.00$5,930.00 $50.00$2,965.00 
66Subgrade Stabilization Material, Polymer Grid191.6S.Y.$5.50$1,053.80 $4.00$766.40 $5.00$958.00 
67Removal of Existing Structures1L.S.$10,000.00$10,000.00 $25,000.00$25,000.00 $6,000.00$6,000.00 
68Excavation, Class 20489C.Y.$25.00$12,225.00 $40.00$19,560.00 $30.00$14,670.00 
69Structural Concrete (RCB Culvert)142C.Y.$575.00$81,650.00 $700.00$99,400.00 $460.00$65,320.00 
70Reinforcing Steel, Epoxy Coated19376LB.$1.10$21,313.60 $1.50$29,064.00 $1.10$21,313.60 
71Reinforcing Steel, Stainless Steel1510LB.$4.00$6,040.00 $5.00$7,550.00 $4.00$6,040.00 
72Concrete Open Railing, TL-474.8L.F.$68.00$5,086.40 $200.00$14,960.00 $100.00$7,480.00 
73Engineering Fabric440S.Y.$4.00$1,760.00 $3.00$1,320.00 $3.00$1,320.00 
74Revetment, Class ‘E’334.3Tons$55.00$18,386.50 $50.00$16,715.00 $50.00$16,715.00 
75Mobilization1L.S.$45,000.00$45,000.00 $35,000.00$35,000.00 $35,000.00$35,000.00 
76Clearing and Grubbing4.1Units$200.00$820.00 $500.00$2,050.00 $335.00$1,373.50 
77Special Backfill26Tons$40.00$1,040.00 $100.00$2,600.00 $40.80$1,060.80 
78Excavation, Class 10, Roadway and Borrow277C.Y.$15.00$4,155.00 $20.00$5,540.00 $30.60$8,476.20 
79Excavation, Class 12, Boulders or Rock Fragments15C.Y.$25.00$375.00 $300.00$4,500.00 $100.00$1,500.00 
80Topsoil, Strip, Salvage and Spread102C.Y.$14.00$1,428.00 $20.00$2,040.00 $30.60$3,121.20 
81Granular Shoulders, Type A26Tons$35.00$910.00 $100.00$2,600.00 $35.70$928.20 
82Shoulder Construction, Earth2.9STA.$550.00$1,595.00 $2,000.00$5,800.00 $408.00$1,183.20 
83Bridge Approach, Two Lane405.8S.Y.$155.00$62,899.00 $200.00$81,160.00 $151.00$61,275.80 
84Standard or Slip Form Portland Cement Concrete Pavement, Class C, Class 2, Durability, 7 in71.4S.Y.$68.00$4,855.20 $150.00$10,710.00 $51.00$3,641.40 
85Erosion Stone25Tons$50.00$1,250.00 $100.00$2,500.00 $60.00$1,500.00 
86Removal of Pavement424.6S.Y.$14.00$5,944.40 $20.00$8,492.00 $15.45$6,560.07 
87Safety Closure3Each$150.00$450.00 $150.00$450.00 $250.00$750.00 
88Field Laboratory1Each$6,500.00$6,500.00 $10,000.00$10,000.00 $5,000.00$5,000.00 
89Remove and Reinstall Sign as Per Plan1Each$200.00$200.00 $200.00$200.00 $200.00$200.00 
90Object Marker, Type 34Each$200.00$800.00 $200.00$800.00 $200.00$800.00 
91Construction Survey1L.S.$3,500.00$3,500.00 $2,720.00$2,720.00 $2,720.00$2,720.00 
92Traffic Control1L.S.$4,500.00$4,500.00 $2,750.00$2,750.00 $4,550.00$4,550.00 
93Silt Fence260L.F.$2.25$585.00 $3.50$910.00 $7.00$1,820.00 
94Silt Fence for Ditch Checks180L.F.$2.50$450.00 $5.00$900.00 $7.00$1,260.00 
95Removal of Silt Fence or Silt Fence for Ditch Checks440L.F.$1.00$440.00 $1.00$440.00 $1.00$440.00 
96Maintenance of Silt Fence or Silt Fence for Ditch Check45L.F.$1.00$45.00 $1.50$67.50 $1.00$45.00 
97Floating Silt Curtain (Hanging)200L.F.$28.00$5,600.00 $30.00$6,000.00 $18.00$3,600.00 
98Maintenance of Floating Silt Curtain100L.F.$10.00$1,000.00 $10.00$1,000.00 $1.00$100.00 
99Perimeter and Slope Sediment Control Device, 12 in Dia410L.F.$4.00$1,640.00 $5.00$2,050.00 $5.00$2,050.00 
100Perimeter and Slope Sediment Control Device, 20 in Dia200L.F.$4.50$900.00 $10.00$2,000.00 $5.00$1,000.00 
101Removal of Perimeter and Slope Sediment Control Device610L.F.$1.00$610.00 $2.00$1,220.00 $1.00$610.00 
102Mobilizations, Erosion Control1Each$750.00$750.00 $500.00$500.00 $500.00$500.00 
103Mobilizations, Emergency Erosion Control1Each$1,000.00$1,000.00 $1,000.00$1,000.00 $500.00$500.00 
      $1,344,512.30  $1,404,884.10  $1,412,612.62 
 
4
5
6
Estimated Cost: $974,086.00
Contractor: 
Hawkins Construction Company
Funding Source: 100% Park & Institutional Road Fund, 2516 Deer Park Blvd


Omaha NE  68105    
Plan Sets Requested: 7
Quantities
402-342-1607
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Removal of Existing Structures1L.S.$13,680.13$13,680.13 $0.00 $0.00 
2Clearing and Grubbing1L.S.$20,399.63$20,399.63 $0.00 $0.00 
3Full Depth Saw Cut3704L.F.$4.32$16,001.28 $0.00 $0.00 
4HMA Pavement Removal1055S.Y.$16.41$17,312.55 $0.00 $0.00 
512-inch RCP Class III1204L.F.$29.80$35,879.20 $0.00 $0.00 
615-inch RCP Class III435L.F.$32.82$14,276.70 $0.00 $0.00 
718-inch RCP Class III60L.F.$46.06$2,763.60 $0.00 $0.00 
8SW-501 Single Grate Intake w/SW-603 Type ‘R’ Casting10Each$2,746.17$27,461.70 $0.00 $0.00 
9SW-512 Circular Area Intake (24” Riser) w/SW-604 Type ‘3B’ Casting1Each$2,167.99$2,167.99 $0.00 $0.00 
10SW-512 Circular Area Intake (18” Riser) w/SW-604 Type ‘3B’ Casting4Each$2,041.91$8,167.64 $0.00 $0.00 
11SW-513 4’X4’ Open Sided Intake w/SW-602 Type ‘G’ Casting1Each$4,096.87$4,096.87 $0.00 $0.00 
12Special Backfill409Tons$40.93$16,740.37 $0.00 $0.00 
13Granular Shoulder126Tons$42.77$5,389.02 $0.00 $0.00 
14Surface Preparation3303S.Y.$7.06$23,319.18 $0.00 $0.00 
15PCC Pavement Placement4539S.Y.$9.65$43,801.35 $0.00 $0.00 
16Iowa DOT Class ‘C’ Concrete1011C.Y.$144.67$146,261.37 $0.00 $0.00 
1736-inch #4 Epoxy Coated Reinforcing Bar714Each$7.13$5,090.82 $0.00 $0.00 
18Finish Grading1L.S.$13,688.91$13,688.91 $0.00 $0.00 
19Seeding, Fertilizing and Mulching1L.S.$1,846.39$1,846.39 $0.00 $0.00 
208-inch Filter Sock100L.F.$15.83$1,583.00 $0.00 $0.00 
21Traffic Control1L.S.$1,055.08$1,055.08 $0.00 $0.00 
22Construction Survey Staking1L.S.$11,922.38$11,922.38 $0.00 $0.00 
23Mobilization1L.S.$108,500.00$108,500.00 $0.00 $0.00 
24Excavation, Class 10, Channel444C.Y.$21.77$9,665.88 $0.00 $0.00 
25Removal of Existing Structures1L.S.$17,528.02$17,528.02 $0.00 $0.00 
26Excavation, Class 2073C.Y.$29.90$2,182.70 $0.00 $0.00 
27Structural Concrete (Bridge)152.2C.Y.$741.49$112,854.778 $0.00 $0.00 
28Reinforcing Steel102LB.$6.71$684.42 $0.00 $0.00 
29Reinforcing Steel, Epoxy Coated38439LB.$1.29$49,586.31 $0.00 $0.00 
30Reinforcing Steel, Stainless Steel1834LB.$4.43$8,124.62 $0.00 $0.00 
31Concrete Open Railing, TL-4162L.F.$54.25$8,788.50 $0.00 $0.00 
32Piles, Steel, HP 10 X 42790L.F.$32.32$25,532.80 $0.00 $0.00 
33Concrete Encasement of Steel H-Piles, HP 10X42 (PIOL Type 3)146.3L.F.$210.30$30,766.89 $0.00 $0.00 
34Engineering Fabric399.5S.Y.$3.58$1,430.21 $0.00 $0.00 
35Revetment, Class ‘E’361.9Tons$57.34$20,751.346 $0.00 $0.00 
36Mobilization1L.S.$145,000.00$145,000.00 $0.00 $0.00 
37Clearing and Grubbing3.3Units$254.79$840.807 $0.00 $0.00 
38Special Backfill94Tons$40.56$3,812.64 $0.00 $0.00 
39Embankment-in-Place62C.Y.$5.09$315.58 $0.00 $0.00 
40Excavation, Class 10, Roadway and Borrow107C.Y.$25.00$2,675.00 $0.00 $0.00 
41Excavation, Class 12, Boulders or Rock Fragments10C.Y.$30.94$309.40 $0.00 $0.00 
42Topsoil, Strip, Salvage and Spread173C.Y.$9.19$1,589.87 $0.00 $0.00 
43Granular Shoulders, Type A63.4Tons$52.69$3,340.546 $0.00 $0.00 
44Shoulder Construction, Earth3.7STA.$346.68$1,282.716 $0.00 $0.00 
45Bridge Approach, Two Lane267S.Y.$171.79$45,867.93 $0.00 $0.00 
46Standard or Slip Form Portland Cement Concrete Pavement, Class C, Class 2, Durability, 7 in249.5S.Y.$52.49$13,096.255 $0.00 $0.00 
47Removal of Pavement620S.Y.$9.36$5,803.20 $0.00 $0.00 
48Safety Closure3Each$158.26$474.78 $0.00 $0.00 
49Field Laboratory1Each$1,709.78$1,709.78 $0.00 $0.00 
50Remove and Reinstall Sign as Per Plan4Each$150.02$600.08 $0.00 $0.00 
51Construction Survey1L.S.$5,908.44$5,908.44 $0.00 $0.00 
52Traffic Control1L.S.$2,901.46$2,901.46 $0.00 $0.00 
53Silt Fence290L.F.$5.28$1,531.20 $0.00 $0.00 
54Silt Fence for Ditch Checks120L.F.$6.33$759.60 $0.00 $0.00 
55Removal of Silt Fence or Silt Fence for Ditch Checks410L.F.$2.11$865.10 $0.00 $0.00 
56Maintenance of Silt Fence or Silt Fence for Ditch Check40L.F.$5.28$211.20 $0.00 $0.00 
57Floating Silt Curtain (Hanging)200L.F.$36.93$7,386.00 $0.00 $0.00 
58Maintenance of Floating Silt Curtain100L.F.$3.17$317.00 $0.00 $0.00 
59Perimeter and Slope Sediment Control Device, 12 in Dia200L.F.$5.28$1,056.00 $0.00 $0.00 
60Perimeter and Slope Sediment Control Device, 20 in Dia200L.F.$6.33$1,266.00 $0.00 $0.00 
61Removal of Perimeter and Slope Sediment Control Device400L.F.$1.85$740.00 $0.00 $0.00 
62Mobilizations, Erosion Control1Each$527.54$527.54 $0.00 $0.00 
63Mobilizations, Emergency Erosion Control1Each$1,055.08$1,055.08 $0.00 $0.00 
64Excavation, Class 10, Channel217C.Y.$26.74$5,802.58 $0.00 $0.00 
65Granular Material for Blanket and Subdrain59.3C.Y.$61.92$3,671.856 $0.00 $0.00 
66Subgrade Stabilization Material, Polymer Grid191.6S.Y.$3.38$647.608 $0.00 $0.00 
67Removal of Existing Structures1L.S.$15,780.74$15,780.74 $0.00 $0.00 
68Excavation, Class 20489C.Y.$16.32$7,980.48 $0.00 $0.00 
69Structural Concrete (RCB Culvert)142C.Y.$436.93$62,044.06 $0.00 $0.00 
70Reinforcing Steel, Epoxy Coated19376LB.$1.43$27,707.68 $0.00 $0.00 
71Reinforcing Steel, Stainless Steel1510LB.$4.42$6,674.20 $0.00 $0.00 
72Concrete Open Railing, TL-474.8L.F.$55.54$4,154.392 $0.00 $0.00 
73Engineering Fabric440S.Y.$3.58$1,575.20 $0.00 $0.00 
74Revetment, Class ‘E’334.3Tons$57.74$19,302.482 $0.00 $0.00 
75Mobilization1L.S.$84,858.00$84,858.00 $0.00 $0.00 
76Clearing and Grubbing4.1Units$113.93$467.113 $0.00 $0.00 
77Special Backfill26Tons$36.73$954.98 $0.00 $0.00 
78Excavation, Class 10, Roadway and Borrow277C.Y.$5.09$1,409.93 $0.00 $0.00 
79Excavation, Class 12, Boulders or Rock Fragments15C.Y.$30.94$464.10 $0.00 $0.00 
80Topsoil, Strip, Salvage and Spread102C.Y.$8.43$859.86 $0.00 $0.00 
81Granular Shoulders, Type A26Tons$40.18$1,044.68 $0.00 $0.00 
82Shoulder Construction, Earth2.9STA.$346.68$1,005.372 $0.00 $0.00 
83Bridge Approach, Two Lane405.8S.Y.$148.10$60,098.98 $0.00 $0.00 
84Standard or Slip Form Portland Cement Concrete Pavement, Class C, Class 2, Durability, 7 in71.4S.Y.$52.58$3,754.212 $0.00 $0.00 
85Erosion Stone25Tons$103.61$2,590.25 $0.00 $0.00 
86Removal of Pavement424.6S.Y.$11.08$4,704.568 $0.00 $0.00 
87Safety Closure3Each$158.26$474.78 $0.00 $0.00 
88Field Laboratory1Each$1,709.78$1,709.78 $0.00 $0.00 
89Remove and Reinstall Sign as Per Plan1Each$150.02$150.02 $0.00 $0.00 
90Object Marker, Type 34Each$211.02$844.08 $0.00 $0.00 
91Construction Survey1L.S.$3,397.35$3,397.35 $0.00 $0.00 
92Traffic Control1L.S.$2,901.46$2,901.46 $0.00 $0.00 
93Silt Fence260L.F.$5.28$1,372.80 $0.00 $0.00 
94Silt Fence for Ditch Checks180L.F.$6.33$1,139.40 $0.00 $0.00 
95Removal of Silt Fence or Silt Fence for Ditch Checks440L.F.$2.11$928.40 $0.00 $0.00 
96Maintenance of Silt Fence or Silt Fence for Ditch Check45L.F.$5.28$237.60 $0.00 $0.00 
97Floating Silt Curtain (Hanging)200L.F.$36.93$7,386.00 $0.00 $0.00 
98Maintenance of Floating Silt Curtain100L.F.$3.17$317.00 $0.00 $0.00 
99Perimeter and Slope Sediment Control Device, 12 in Dia410L.F.$5.28$2,164.80 $0.00 $0.00 
100Perimeter and Slope Sediment Control Device, 20 in Dia200L.F.$6.33$1,266.00 $0.00 $0.00 
101Removal of Perimeter and Slope Sediment Control Device610L.F.$1.85$1,128.50 $0.00 $0.00 
102Mobilizations, Erosion Control1Each$527.54$527.54 $0.00 $0.00 
103Mobilizations, Emergency Erosion Control1Each$1,055.08$1,055.08 $0.00 $0.00 
      $1,425,098.751  $0.00  $0.00 
 



 