IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Palisades-Kepler | Date: 11/20/2014 | Project No. |
| Cabin Floor Replacement | County: | LINN | Time: 11:00 a.m. | 15-06-57-01 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $60,000.00 | Contractor: | Sheets Design Build LLC | Jonas Raber Construction | Dan's Custom Homes | |||||||||
| Funding Source: 100% Infrastructure 2015, | 18284 Hwy 64 West | 1296 145th St | 1617 Meadow Ridge Ct | ||||||||||
| Maquoketa IA 52060 | Fairbank IA 50629 | Anamosa IA 52205 | |||||||||||
| Plan Sets Requested: 1 | Quantities | 563-652-8399 | 319-551-9346 | 319-560-5284 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | DEMOLITION AND REMOVAL OF ENTIRE FLOOR SURFACE INCLUDING SUB-FLOOR, UNDERLAYMENT, INSULATION AND FINISHES. INCLUDE ALL DISINFECTION OF FLOOR JOISTS A | 1 | L.S. | $7,815.00 | $7,815.00 | $16,700.00 | $16,700.00 | $8,228.00 | $8,228.00 | ||||
| 2 | REMOVAL OF TOILET, WATER HEATER, BASE TRIM, FURNITURE, DOORS AND ALL ITEMS TO BE REINSTALLED AFTER FLOOR REPLACEMENT | 1 | L.S. | $7,771.00 | $7,771.00 | $13,560.00 | $13,560.00 | $2,904.00 | $2,904.00 | ||||
| 3 | 4" CLOSED-CELL SPRAY FOAM INSULATION | 1 | L.S. | $7,218.00 | $7,218.00 | $5,430.00 | $5,430.00 | $10,780.00 | $10,780.00 | ||||
| 4 | NEW STEEL DOCK LADDER AND ACCESS HATCH PLUG DOOR | 1 | L.S. | $3,236.00 | $3,236.00 | $2,463.00 | $2,463.00 | $6,000.00 | $6,000.00 | ||||
| 5 | NEW SUB-FLOOR, VINYL FLOOR COVERING AND BASE SHOE | 1 | L.S. | $13,567.00 | $13,567.00 | $6,413.00 | $6,413.00 | $16,400.00 | $16,400.00 | ||||
| 6 | NEW ELECTRICAL PIPE HEATING ELEMENT AND PIPE INSULATION | 1 | L.S. | $2,675.00 | $2,675.00 | $1,792.00 | $1,792.00 | $4,365.00 | $4,365.00 | ||||
| 7 | NEW ELECTRICAL LIGHT AND SWITCH | 1 | L.S. | $3,822.00 | $3,822.00 | $850.00 | $850.00 | $2,420.00 | $2,420.00 | ||||
| 8 | NEW CRAWL SPACE FAN WITH DE-HUMIDISTAT | 1 | L.S. | $2,746.00 | $2,746.00 | $1,740.00 | $1,740.00 | $7,260.00 | $7,260.00 | ||||
| $48,850.00 | $48,948.00 | $58,357.00 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $60,000.00 | Contractor: | Garling Construction | Apex Construction Inc | ||||||||||
| Funding Source: 100% Infrastructure 2015, | 1120 11th St. | 4218 Yvette St. SW, Bldg A | |||||||||||
| Belle Plaine IA 52208 | Iowa City IA 52244 | ||||||||||||
| Plan Sets Requested: 1 | Quantities | 319-444-3409 | 319-339-1543 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | DEMOLITION AND REMOVAL OF ENTIRE FLOOR SURFACE INCLUDING SUB-FLOOR, UNDERLAYMENT, INSULATION AND FINISHES. INCLUDE ALL DISINFECTION OF FLOOR JOISTS A | 1 | L.S. | $14,830.00 | $14,830.00 | $17,352.00 | $17,352.00 | $0.00 | |||||
| 2 | REMOVAL OF TOILET, WATER HEATER, BASE TRIM, FURNITURE, DOORS AND ALL ITEMS TO BE REINSTALLED AFTER FLOOR REPLACEMENT | 1 | L.S. | $6,050.00 | $6,050.00 | $18,950.00 | $18,950.00 | $0.00 | |||||
| 3 | 4" CLOSED-CELL SPRAY FOAM INSULATION | 1 | L.S. | $7,780.00 | $7,780.00 | $8,379.00 | $8,379.00 | $0.00 | |||||
| 4 | NEW STEEL DOCK LADDER AND ACCESS HATCH PLUG DOOR | 1 | L.S. | $5,170.00 | $5,170.00 | $5,827.00 | $5,827.00 | $0.00 | |||||
| 5 | NEW SUB-FLOOR, VINYL FLOOR COVERING AND BASE SHOE | 1 | L.S. | $20,900.00 | $20,900.00 | $21,190.00 | $21,190.00 | $0.00 | |||||
| 6 | NEW ELECTRICAL PIPE HEATING ELEMENT AND PIPE INSULATION | 1 | L.S. | $4,000.00 | $4,000.00 | $3,746.00 | $3,746.00 | $0.00 | |||||
| 7 | NEW ELECTRICAL LIGHT AND SWITCH | 1 | L.S. | $1,560.00 | $1,560.00 | $4,076.00 | $4,076.00 | $0.00 | |||||
| 8 | NEW CRAWL SPACE FAN WITH DE-HUMIDISTAT | 1 | L.S. | $5,230.00 | $5,230.00 | $5,700.00 | $5,700.00 | $0.00 | |||||
| $65,520.00 | $85,220.00 | $0.00 | |||||||||||
Dan's Custom Homes, Anamosa, IA
12/20/2025