IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Lake Macbride State Park | Date: 4/23/2015 | Project No. |
| Fuel Barrel Replacement | County: | JOHNSON | Time: 3:00 p.m. | 15-06-52-03 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $25,000.00 | Contractor: | Acterra Group, Inc. | CAJ Enterprises Inc. | Unified Contracting Services, Inc. | |||||||||
| Funding Source: 100% Infrastructure 2015, | Corporate Centre 200 PO Box 160 | 263 260th St | 2425 NE 46th Ave | ||||||||||
| Marion IA 52303-0160 | West Branch IA 52358 | Des Moines IA 50317 | |||||||||||
| Plan Sets Requested: 0 | Quantities | 319-377-6357 | 319-643-7487 | 515-266-5700 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Remove Fuel Barrels (Including removal and disposal of existing concrete pads, bollards, fuel tanks, pumps, and disconnecting electric) | 1 | L.S. | $9,689.00 | $9,689.00 | $1,385.00 | $1,385.00 | $4,000.00 | $4,000.00 | ||||
| 2 | New Fuel Tanks, 500 Gal. (Per Plans) | 2 | Each | $0.00 | $0.00 | $8,135.00 | $16,270.00 | $5,246.60 | $10,493.20 | ||||
| 3 | Bollards (Per Plans) | 10 | Each | $0.00 | $0.00 | $215.20 | $2,152.00 | $350.00 | $3,500.00 | ||||
| 4 | Site Restoration (Including minor grading as needed, removing and replacing topsoil, additional topsoil in area of concrete pad removal, and seeding) | 1 | L.S. | $6,500.00 | $6,500.00 | $3,200.00 | $3,200.00 | $6,000.00 | $6,000.00 | ||||
| $16,189.00 | $23,007.00 | $23,993.20 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $25,000.00 | Contractor: | Triple B Construction Corporation | |||||||||||
| Funding Source: 100% Infrastructure 2015, | 2272 Spicer Ave | ||||||||||||
| Wilton IA 52778 | |||||||||||||
| Plan Sets Requested: 0 | Quantities | 319-631-0320 | |||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Remove Fuel Barrels (Including removal and disposal of existing concrete pads, bollards, fuel tanks, pumps, and disconnecting electric) | 1 | L.S. | $2,000.00 | $2,000.00 | $0.00 | $0.00 | ||||||
| 2 | New Fuel Tanks, 500 Gal. (Per Plans) | 2 | Each | $12,330.00 | $24,660.00 | $0.00 | $0.00 | ||||||
| 3 | Bollards (Per Plans) | 10 | Each | $375.00 | $3,750.00 | $0.00 | $0.00 | ||||||
| 4 | Site Restoration (Including minor grading as needed, removing and replacing topsoil, additional topsoil in area of concrete pad removal, and seeding) | 1 | L.S. | $2,000.00 | $2,000.00 | $0.00 | $0.00 | ||||||
| $32,410.00 | $0.00 | $0.00 | |||||||||||
Acterra Group, Inc., Marion, IA