IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Macbride State Park  Date: 4/23/2015  Project No.  
  Fuel Barrel Replacement  County:   JOHNSON  Time: 3:00 p.m.  15-06-52-03

 

 
1
2
3
Estimated Cost: $25,000.00
Contractor: 
Acterra Group, Inc.CAJ Enterprises Inc.Unified Contracting Services, Inc.
Funding Source: 100% Infrastructure 2015, Corporate Centre 200
PO Box 160
263 260th St
2425 NE 46th Ave
Marion IA  52303-0160West Branch IA  52358Des Moines IA  50317
Plan Sets Requested: 0
Quantities
319-377-6357319-643-7487515-266-5700
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Remove Fuel Barrels (Including removal and disposal of existing concrete pads, bollards, fuel tanks, pumps, and disconnecting electric) 1L.S.$9,689.00$9,689.00 $1,385.00$1,385.00 $4,000.00$4,000.00 
2New Fuel Tanks, 500 Gal. (Per Plans)2Each$0.00$0.00 $8,135.00$16,270.00 $5,246.60$10,493.20 
3Bollards (Per Plans)10Each$0.00$0.00 $215.20$2,152.00 $350.00$3,500.00 
4Site Restoration (Including minor grading as needed, removing and replacing topsoil, additional topsoil in area of concrete pad removal, and seeding)1L.S.$6,500.00$6,500.00 $3,200.00$3,200.00 $6,000.00$6,000.00 
      $16,189.00  $23,007.00  $23,993.20 
 
 
4
5
6
Estimated Cost: $25,000.00
Contractor: 
Triple B Construction Corporation
Funding Source: 100% Infrastructure 2015, 2272 Spicer Ave


Wilton IA  52778    
Plan Sets Requested: 0
Quantities
319-631-0320
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Remove Fuel Barrels (Including removal and disposal of existing concrete pads, bollards, fuel tanks, pumps, and disconnecting electric) 1L.S.$2,000.00$2,000.00 $0.00 $0.00 
2New Fuel Tanks, 500 Gal. (Per Plans)2Each$12,330.00$24,660.00 $0.00 $0.00 
3Bollards (Per Plans)10Each$375.00$3,750.00 $0.00 $0.00 
4Site Restoration (Including minor grading as needed, removing and replacing topsoil, additional topsoil in area of concrete pad removal, and seeding)1L.S.$2,000.00$2,000.00 $0.00 $0.00 
      $32,410.00  $0.00  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Acterra Group, Inc., Marion, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.