IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Nine Eagles  Date: 11/20/2014  Project No.  
  shower building replacement  County:   DECATUR  Time: 11:00 a.m.  15-05-27-01

 

 
1
2
3
Estimated Cost: $300,000.00
Contractor: 
Caliber Concrete LLC
Funding Source: 100% Infrastructure 2015, 309 Audubon St


Adair IA  50002    
Plan Sets Requested: 0
Quantities
515-979-2004
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1CLEARING AND GRUBBING1L.S.$1,200.00$1,200.00 $0.00 $0.00 
2GRADING1L.S.$1,200.00$1,200.00 $0.00 $0.00 
3SEEDING, FERTILIZING AND MULCHING1L.S.$2,500.00$2,500.00 $0.00 $0.00 
4DEMOLITION OF EXISTING SHOWER BUILDING AND SIDEWALKS1L.S.$12,000.00$12,000.00 $0.00 $0.00 
52" WATER SERVICE1L.S.$4,000.00$4,000.00 $0.00 $0.00 
64" SCHEDULE 40 PVC SANITARY SEWER AND CLEANOUT1L.S.$15,112.00$15,112.00 $0.00 $0.00 
7WATER DRAIN-DOWN PIT AND ALL ACCESSORIES1Each$4,000.00$4,000.00 $0.00 $0.00 
85" REINFORCED PCC SIDEWALK PAVEMENT1L.S.$9,816.00$9,816.00 $0.00 $0.00 
9NEENAH CAST IRON ADA DETECTION TILES8Each$200.00$1,600.00 $0.00 $0.00 
10ELECTRICAL SERVICE1L.S.$19,529.00$19,529.00 $0.00 $0.00 
11NEW HUFFCUTT IOWA STANDARD SHOWER BUILDING1L.S.$204,312.00$204,312.00 $0.00 $0.00 
12CONSTRUCTION STAKING1L.S.$2,500.00$2,500.00 $0.00 $0.00 
13MOBILIZATION1L.S.$24,200.00$24,200.00 $0.00 $0.00 
      $301,969.00  $0.00  $0.00 
 



 

12/20/2025