IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Fairport Recreation Area  Date: 8/20/2015  Project No.  
  campground electric upgrade  County:   MUSCATINE  Time: 11:00 a.m.  15-06-70-01

 

 
1
2
3
Estimated Cost: $157,702.00
Contractor: 
Triple B ConstructionHome Town Plumbing & HeatingSmith Seeding Inc
Funding Source: 100% Infrastructure 2015, 2272 Spicer Ave
13606 118th Ave
219 N 1st Street
Wilton IA  52778Davenport IA  52804Eldridge IA  52748
Plan Sets Requested: 2
Quantities
563-299-2399(563) 381-4800563-285-2604
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Demolition1L.S.$2,500.00$2,500.00 $6,405.00$6,405.00 $7,000.00$7,000.00 
21-inch HDPE Pipe979L.F.$16.00$15,664.00 $14.65$14,342.35 $13.00$12,727.00 
31.5-inch HDPE Pipe291L.F.$18.00$5,238.00 $20.20$5,878.20 $13.00$3,783.00 
4Woodford Model S-3 Sanitary Yard Hydrants11Each$2,200.00$24,200.00 $1,958.00$21,538.00 $2,000.00$22,000.00 
51x1x1 HDPE Tee5Each$100.00$500.00 $480.00$2,400.00 $150.00$750.00 
61.5x1.5x1.5 HDPE Tee5Each$200.00$1,000.00 $525.00$2,625.00 $150.00$750.00 
71.5x1 HDPE Reducers6Each$100.00$600.00 $330.00$1,980.00 $150.00$900.00 
81.5-inch Curb Stop1Each$650.00$650.00 $525.00$525.00 $900.00$900.00 
91-inch Watertight Cap1Each$50.00$50.00 $530.00$530.00 $150.00$150.00 
10Disinfection1L.S.$1,500.00$1,500.00 $1,410.00$1,410.00 $1,500.00$1,500.00 
11Electrical Improvements1L.S.$82,475.00$82,475.00 $101,300.00$101,300.00 $100,000.00$100,000.00 
12Seeding, Fertilizing and Mulching1L.S.$7,000.00$7,000.00 $3,300.00$3,300.00 $3,000.00$3,000.00 
13Traffic Control1L.S.$1,000.00$1,000.00 $1,100.00$1,100.00 $1,500.00$1,500.00 
14Construction Survey Staking1L.S.$5,000.00$5,000.00 $4,410.00$4,410.00 $4,500.00$4,500.00 
15Mobilization1L.S.$13,000.00$13,000.00 $9,430.00$9,430.00 $19,000.00$19,000.00 
      $160,377.00  $177,173.55  $178,460.00 
 
 
4
5
6
Estimated Cost: $157,702.00
Contractor: 
Nelson Electric, IncMiller Trucking & Excav
Funding Source: 100% Infrastructure 2015, 703 Clay Street
3033 John Deere Rd

Muscatine IA  52761Silvis IL  61282  
Plan Sets Requested: 2
Quantities
563-203-7319(309) 755-7644
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Demolition1L.S.$2,000.00$2,000.00 $15,000.00$15,000.00 $0.00 
21-inch HDPE Pipe979L.F.$10.00$9,790.00 $35.00$34,265.00 $0.00 
31.5-inch HDPE Pipe291L.F.$10.25$2,982.75 $40.00$11,640.00 $0.00 
4Woodford Model S-3 Sanitary Yard Hydrants11Each$1,500.00$16,500.00 $1,800.00$19,800.00 $0.00 
51x1x1 HDPE Tee5Each$350.00$1,750.00 $64.00$320.00 $0.00 
61.5x1.5x1.5 HDPE Tee5Each$350.00$1,750.00 $72.00$360.00 $0.00 
71.5x1 HDPE Reducers6Each$36.00$216.00 $69.00$414.00 $0.00 
81.5-inch Curb Stop1Each$1,500.00$1,500.00 $470.00$470.00 $0.00 
91-inch Watertight Cap1Each$350.00$350.00 $60.00$60.00 $0.00 
10Disinfection1L.S.$2,500.00$2,500.00 $1,200.00$1,200.00 $0.00 
11Electrical Improvements1L.S.$129,000.00$129,000.00 $115,000.00$115,000.00 $0.00 
12Seeding, Fertilizing and Mulching1L.S.$2,500.00$2,500.00 $8,000.00$8,000.00 $0.00 
13Traffic Control1L.S.$200.00$200.00 $1,400.00$1,400.00 $0.00 
14Construction Survey Staking1L.S.$1,500.00$1,500.00 $4,800.00$4,800.00 $0.00 
15Mobilization1L.S.$15,896.25$15,896.25 $20,000.00$20,000.00 $0.00 
      $188,435.00  $232,729.00  $0.00 
 



 