IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Sweet Marsh WMA  Date: 5/28/2015  Project No.  
  PCC Observation Deck  County:   BREMER  Time: 3:00 p.m.  14-03-09-01

 

 
1
2
3
Estimated Cost: $15,000.00
Contractor: 
Lansing Brothers Construction Co. Inc.Nate Moeller ConstMatt Construction Inc.
Funding Source: 100% Federal-SWG, 101 East 1st St
PO Box 36
706 7th Ave SW
203 Y Ave
Luxemburg IA  52056Tripoli IA  50676Sumner IA  50674
Plan Sets Requested: 0
Quantities
563-543-7360319-882-3600563-578-8418
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$2,500.00$2,500.00 $500.00$500.00 $2,000.00$2,000.00 
2Tree Removal27Units$30.00$810.00 $50.00$1,350.00 $20.00$540.00 
3Site Grading1L.S.$1,000.00$1,000.00 $2,500.00$2,500.00 $2,500.00$2,500.00 
4Limestone Fill Material400Tons$10.00$4,000.00 $10.50$4,200.00 $11.00$4,400.00 
5PC Deck Concrete, 6" Class C, Fiber Reinforced573S.F.$8.00$4,584.00 $8.25$4,727.25 $7.00$4,011.00 
6Top Soil, Furnish & Spread55C.Y.$20.00$1,100.00 $40.00$2,200.00 $32.00$1,760.00 
7Cr. Stone Surfacing24Tons$25.00$600.00 $15.00$360.00 $23.00$552.00 
8Stabilizing Crop Seeding1L.S.$1,000.00$1,000.00 $1,200.00$1,200.00 $2,500.00$2,500.00 
      $15,594.00  $17,037.25  $18,263.00 
 
 
4
5
6
Estimated Cost: $15,000.00
Contractor: 
Boulder Contracting, LLCJonas Raber Construction LLCBacon Concrete, LLC
Funding Source: 100% Federal-SWG, 25789 N Ave
1296 145th St
370 N Bancroft St
Grundy Center IA  50638Fairbank IA  50629Postville IA  52162-0188
Plan Sets Requested: 0
Quantities
319-269-8680319-551-9346563-864-7602
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$1,500.00$1,500.00 $1,250.00$1,250.00 $1,800.00$1,800.00 
2Tree Removal27Units$40.00$1,080.00 $20.00$540.00 $100.00$2,700.00 
3Site Grading1L.S.$2,500.00$2,500.00 $3,650.00$3,650.00 $2,000.00$2,000.00 
4Limestone Fill Material400Tons$15.00$6,000.00 $10.50$4,200.00 $18.50$7,400.00 
5PC Deck Concrete, 6" Class C, Fiber Reinforced573S.F.$6.00$3,438.00 $14.29$8,188.17 $7.20$4,125.60 
6Top Soil, Furnish & Spread55C.Y.$50.00$2,750.00 $19.00$1,045.00 $27.50$1,512.50 
7Cr. Stone Surfacing24Tons$50.00$1,200.00 $14.25$342.00 $20.00$480.00 
8Stabilizing Crop Seeding1L.S.$1,000.00$1,000.00 $500.00$500.00 $1,000.00$1,000.00 
      $19,468.00  $19,715.17  $21,018.10 
 
7
8
9
Estimated Cost: $15,000.00
Contractor: 
Chad Heim Excavating and Trucking
Funding Source: 100% Federal-SWG, 1920 Joy Ave


Waverly IA  50677    
Plan Sets Requested: 0
Quantities
319-230-0153
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$800.00$800.00 $0.00 $0.00 
2Tree Removal27Units$60.00$1,620.00 $0.00 $0.00 
3Site Grading1L.S.$4,800.00$4,800.00 $0.00 $0.00 
4Limestone Fill Material400Tons$9.625$3,850.00 $0.00 $0.00 
5PC Deck Concrete, 6" Class C, Fiber Reinforced573S.F.$8.00$4,584.00 $0.00 $0.00 
6Top Soil, Furnish & Spread55C.Y.$25.00$1,375.00 $0.00 $0.00 
7Cr. Stone Surfacing24Tons$28.00$672.00 $0.00 $0.00 
8Stabilizing Crop Seeding1L.S.$3,800.00$3,800.00 $0.00 $0.00 
      $21,501.00  $0.00  $0.00 
 


The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.


Jonas Raber Construction LLC, Fairbank, IA
 

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.