IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Easter Lake  Date: 11/16/2017  Project No.  
  Contract 3 - Lake Grading, Fish Habitat, Shoreline Restoration  County:   POLK  Time: 11:00 AM  14-06-77-08

 

 
1
2
3
Estimated Cost: $4,100,000.00
Contractor: 
RW ExcavatingHendrickson Transportation, LLCCJ Moyna & Sons Inc
Funding Source: 99% Lake Restoration, 1% Other, 13293 S 88th Ave W
2762 310th Street
8710 Earhart Ln SW
Prairie City IA  50228Hamburg IA  51640Cedar Rapids IA  52404
Plan Sets Requested: 4
Quantities
515-994-2648712-382-1505319-841-9260
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$40,000.00$40,000.00 $16,000.00$16,000.00 $195,000.00$195,000.00 
2Excavation, Class 10211000B.C.Y.$4.53$955,830.00 $6.00$1,266,000.00 $5.40$1,139,400.00 
3Storm Sewer, Trenched, RCP, 18 in224L.F.$24.51$5,490.24 $50.00$11,200.00 $62.00$13,888.00 
4Storm Sewer, Trenched, RCP, 24 in216L.F.$38.56$8,328.96 $75.00$16,200.00 $78.00$16,848.00 
5Pipe Apron, RCP, 18 in1Each$1,606.40$1,606.40 $1,000.00$1,000.00 $1,600.00$1,600.00 
6Pipe Apron, RCP, 24 in1Each$2,067.20$2,067.20 $1,500.00$1,500.00 $1,900.00$1,900.00 
7Manhole Adjustment, Major3Each$2,000.00$6,000.00 $3,000.00$9,000.00 $1,900.00$5,700.00 
8Overlay, HMA, 2 in3550S.Y.$23.00$81,650.00 $30.00$106,500.00 $26.50$94,075.00 
9Removal of Shared Use Path120S.Y.$20.00$2,400.00 $30.00$3,600.00 $22.00$2,640.00 
10Shared Use Path, PCC, 6 in120S.Y.$55.00$6,600.00 $200.00$24,000.00 $83.00$9,960.00 
11Full Depth Patches150S.Y.$100.00$15,000.00 $200.00$30,000.00 $128.00$19,200.00 
12Seeding, Native Mix3Acres$6,500.00$19,500.00 $4,500.00$13,500.00 $7,860.00$23,580.00 
13Seeding, Erosion Control Mix23Acres$4,000.00$92,000.00 $4,500.00$103,500.00 $3,950.00$90,850.00 
14Seeding, Offsite7Acres$4,000.00$28,000.00 $4,500.00$31,500.00 $3,900.00$27,300.00 
15Relocate Tree3Each$650.00$1,950.00 $1,000.00$3,000.00 $450.00$1,350.00 
16SWPPP Management1L.S.$6,500.00$6,500.00 $10,000.00$10,000.00 $4,000.00$4,000.00 
17Filter Sock, Install6000L.F.$2.50$15,000.00 $3.00$18,000.00 $1.50$9,000.00 
18Filter Sock, Removal6000L.F.$1.00$6,000.00 $1.00$6,000.00 $0.20$1,200.00 
19Silt Fence, Install2000L.F.$2.50$5,000.00 $5.00$10,000.00 $1.50$3,000.00 
20Silt Fence, Removal2000L.F.$1.00$2,000.00 $3.00$6,000.00 $0.20$400.00 
21Temporary RECP, Type 2B1800S.Y.$3.00$5,400.00 $6.00$10,800.00 $1.50$2,700.00 
22TRM, Type 2120S.F.$3.50$420.00 $10.00$1,200.00 $4.25$510.00 
23Check Dam, Rock90Tons$53.60$4,824.00 $45.00$4,050.00 $63.90$5,751.00 
24Rip Rap, Class D430Tons$53.60$23,048.00 $60.00$25,800.00 $53.90$23,177.00 
25Rip Rap, Class E55Tons$53.60$2,948.00 $60.00$3,300.00 $63.90$3,514.50 
26Rip Rap, Recycled Concrete50Tons$30.00$1,500.00 $25.00$1,250.00 $39.90$1,995.00 
27Shoreline Treatment, Type 1, Rip Rap10230L.F.$68.10$696,663.00 $70.00$716,100.00 $94.30$964,689.00 
28Shoreline Treatment, Type 2, Flexamat6765L.F.$44.24$299,283.60 $56.00$378,840.00 $42.90$290,218.50 
29Shoreline Treatment, Type 3, Fiber Log7130L.F.$13.09$93,331.70 $20.00$142,600.00 $14.00$99,820.00 
30Repurposed Granite Stone Feature8Each$1,500.00$12,000.00 $1,000.00$8,000.00 $1,150.00$9,200.00 
31Repurposed Sandstone Feature25Each$800.00$20,000.00 $1,000.00$25,000.00 $1,850.00$46,250.00 
32Stabilized Construction Entrance140Tons$32.00$4,480.00 $45.00$6,300.00 $35.90$5,026.00 
33Stabilized Construction Entrance, Removal4Each$500.00$2,000.00 $500.00$2,000.00 $1,500.00$6,000.00 
34Crushed Rock, Access Road350Tons$32.00$11,200.00 $45.00$15,750.00 $35.90$12,565.00 
35Access Road Removal1L.S.$1,000.00$1,000.00 $5,000.00$5,000.00 $0.01$0.01 
36Mobilization1L.S.$150,000.00$150,000.00 $100,000.00$100,000.00 $590,000.00$590,000.00 
37Type A Fish Habitat2Each$800.00$1,600.00 $3,000.00$6,000.00 $1,950.00$3,900.00 
38Type B Fish Habitat19Each$800.00$15,200.00 $1,500.00$28,500.00 $2,350.00$44,650.00 
39Type C Fish Habitat17Each$400.00$6,800.00 $1,500.00$25,500.00 $1,000.00$17,000.00 
40Type E Fish Habitat30Each$200.00$6,000.00 $100.00$3,000.00 $400.00$12,000.00 
41Type F Fish Habitat9Each$500.00$4,500.00 $1,500.00$13,500.00 $1,550.00$13,950.00 
42Type G Fish Habitat19Each$400.00$7,600.00 $500.00$9,500.00 $1,100.00$20,900.00 
43Type H Fish Habitat14Each$500.00$7,000.00 $2,000.00$28,000.00 $1,500.00$21,000.00 
44Type J Fish Habitat4Each$860.00$3,440.00 $3,000.00$12,000.00 $2,300.00$9,200.00 
45Impoundment Discharge1L.S.$5,000.00$5,000.00 $15,000.00$15,000.00 $0.01$0.01 
46Offsite Waste Disposal375Tons$60.00$22,500.00 $50.00$18,750.00 $85.00$31,875.00 
      $2,708,661.10  $3,292,240.00  $3,896,782.02 
Alternate        
47Borrow Excavation, Class 1060000B.C.Y.$2.30$138,000.00 $3.00$180,000.00 $5.20$312,000.00 
Alternate        
48Borrow Excavation, Hauling60000B.C.Y.$11.25$675,000.00 $8.00$480,000.00 $6.40$384,000.00 
      $3,521,661.10  $3,952,240.00  $4,592,782.02 
 
4
5
6
Estimated Cost: $4,100,000.00
Contractor: 
Veit & Company, Inc. Peterson Contractors, Inc.US SiteWork, Inc.
Funding Source: 99% Lake Restoration, 1% Other, 14000 Veit Place
104 Blackhawk St.
11040 183rd Circle NW, Buite B
Rogers MN  55374Reinbeck IA  50669Elk River MN  55330
Plan Sets Requested: 4
Quantities
7634282242319-345-2713763-280-8508
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$59,400.00$59,400.00 $180,000.00$180,000.00 $165,000.00$165,000.00 
2Excavation, Class 10211000B.C.Y.$5.85$1,234,350.00 $8.00$1,688,000.00 $5.90$1,244,900.00 
3Storm Sewer, Trenched, RCP, 18 in224L.F.$84.00$18,816.00 $60.00$13,440.00 $52.50$11,760.00 
4Storm Sewer, Trenched, RCP, 24 in216L.F.$84.00$18,144.00 $72.00$15,552.00 $62.50$13,500.00 
5Pipe Apron, RCP, 18 in1Each$2,100.00$2,100.00 $2,750.00$2,750.00 $1,990.00$1,990.00 
6Pipe Apron, RCP, 24 in1Each$2,600.00$2,600.00 $3,000.00$3,000.00 $2,175.00$2,175.00 
7Manhole Adjustment, Major3Each$2,900.00$8,700.00 $1,500.00$4,500.00 $1,540.00$4,620.00 
8Overlay, HMA, 2 in3550S.Y.$25.50$90,525.00 $30.00$106,500.00 $25.50$90,525.00 
9Removal of Shared Use Path120S.Y.$8.00$960.00 $20.00$2,400.00 $9.50$1,140.00 
10Shared Use Path, PCC, 6 in120S.Y.$72.00$8,640.00 $55.00$6,600.00 $180.00$21,600.00 
11Full Depth Patches150S.Y.$127.00$19,050.00 $75.00$11,250.00 $217.00$32,550.00 
12Seeding, Native Mix3Acres$8,798.00$26,394.00 $7,860.00$23,580.00 $8,555.00$25,665.00 
13Seeding, Erosion Control Mix23Acres$4,422.00$101,706.00 $3,950.00$90,850.00 $4,300.00$98,900.00 
14Seeding, Offsite7Acres$4,366.00$30,562.00 $3,900.00$27,300.00 $4,245.00$29,715.00 
15Relocate Tree3Each$504.00$1,512.00 $450.00$1,350.00 $490.00$1,470.00 
16SWPPP Management1L.S.$4,477.00$4,477.00 $4,000.00$4,000.00 $38,900.00$38,900.00 
17Filter Sock, Install6000L.F.$1.70$10,200.00 $1.50$9,000.00 $1.60$9,600.00 
18Filter Sock, Removal6000L.F.$0.25$1,500.00 $0.20$1,200.00 $0.20$1,200.00 
19Silt Fence, Install2000L.F.$1.70$3,400.00 $1.50$3,000.00 $1.60$3,200.00 
20Silt Fence, Removal2000L.F.$0.25$500.00 $0.20$400.00 $0.20$400.00 
21Temporary RECP, Type 2B1800S.Y.$1.70$3,060.00 $1.50$2,700.00 $1.60$2,880.00 
22TRM, Type 2120S.F.$0.60$72.00 $4.25$510.00 $27.00$3,240.00 
23Check Dam, Rock90Tons$66.00$5,940.00 $75.00$6,750.00 $37.00$3,330.00 
24Rip Rap, Class D430Tons$62.00$26,660.00 $50.00$21,500.00 $57.50$24,725.00 
25Rip Rap, Class E55Tons$68.00$3,740.00 $50.00$2,750.00 $57.50$3,162.50 
26Rip Rap, Recycled Concrete50Tons$40.00$2,000.00 $25.00$1,250.00 $19.50$975.00 
27Shoreline Treatment, Type 1, Rip Rap10230L.F.$75.00$767,250.00 $100.00$1,023,000.00 $66.00$675,180.00 
28Shoreline Treatment, Type 2, Flexamat6765L.F.$63.00$426,195.00 $52.50$355,162.50 $102.00$690,030.00 
29Shoreline Treatment, Type 3, Fiber Log7130L.F.$24.00$171,120.00 $18.00$128,340.00 $13.50$96,255.00 
30Repurposed Granite Stone Feature8Each$1,400.00$11,200.00 $4,500.00$36,000.00 $7,355.00$58,840.00 
31Repurposed Sandstone Feature25Each$900.00$22,500.00 $2,500.00$62,500.00 $7,040.00$176,000.00 
32Stabilized Construction Entrance140Tons$30.00$4,200.00 $45.00$6,300.00 $34.00$4,760.00 
33Stabilized Construction Entrance, Removal4Each$450.00$1,800.00 $500.00$2,000.00 $484.00$1,936.00 
34Crushed Rock, Access Road350Tons$27.50$9,625.00 $30.00$10,500.00 $40.00$14,000.00 
35Access Road Removal1L.S.$1,100.00$1,100.00 $5,000.00$5,000.00 $4,280.00$4,280.00 
36Mobilization1L.S.$485,000.00$485,000.00 $150,000.00$150,000.00 $811,150.00$811,150.00 
37Type A Fish Habitat2Each$1,200.00$2,400.00 $2,000.00$4,000.00 $2,000.00$4,000.00 
38Type B Fish Habitat19Each$1,100.00$20,900.00 $2,000.00$38,000.00 $2,080.00$39,520.00 
39Type C Fish Habitat17Each$600.00$10,200.00 $2,100.00$35,700.00 $2,225.00$37,825.00 
40Type E Fish Habitat30Each$150.00$4,500.00 $1,000.00$30,000.00 $1,440.00$43,200.00 
41Type F Fish Habitat9Each$1,200.00$10,800.00 $1,000.00$9,000.00 $1,815.00$16,335.00 
42Type G Fish Habitat19Each$600.00$11,400.00 $1,000.00$19,000.00 $2,060.00$39,140.00 
43Type H Fish Habitat14Each$1,100.00$15,400.00 $2,100.00$29,400.00 $1,470.00$20,580.00 
44Type J Fish Habitat4Each$2,200.00$8,800.00 $2,500.00$10,000.00 $2,690.00$10,760.00 
45Impoundment Discharge1L.S.$43,600.00$43,600.00 $25,000.00$25,000.00 $17,980.00$17,980.00 
46Offsite Waste Disposal375Tons$200.00$75,000.00 $150.00$56,250.00 $70.00$26,250.00 
Alternate        
47Borrow Excavation, Class 1060000B.C.Y.$5.85$351,000.00 $4.50$270,000.00 $0.85$51,000.00 
Alternate        
48Borrow Excavation, Hauling60000B.C.Y.$10.90$654,000.00 $6.00$360,000.00 $8.30$498,000.00 
      $4,792,998.00  $4,895,284.50  $5,174,143.50 
 
7
8
9
Estimated Cost: $4,100,000.00
Contractor: 
Elder CorpSYNERGY CONTRACTING LLC
Funding Source: 99% Lake Restoration, 1% Other, 5088 E University
422 SE 3RD STREET
PO BOX 694

Des Moines IA  50327ANKENY IA  50021  
Plan Sets Requested: 4
Quantities
266-3111(515) 556-5569
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$148,000.00$148,000.00 $63,600.00$63,600.00 $0.00 
2Excavation, Class 10211000B.C.Y.$6.00$1,266,000.00 $10.00$2,110,000.00 $0.00 
3Storm Sewer, Trenched, RCP, 18 in224L.F.$73.00$16,352.00 $128.80$28,851.20 $0.00 
4Storm Sewer, Trenched, RCP, 24 in216L.F.$91.00$19,656.00 $168.00$36,288.00 $0.00 
5Pipe Apron, RCP, 18 in1Each$2,200.00$2,200.00 $2,800.00$2,800.00 $0.00 
6Pipe Apron, RCP, 24 in1Each$2,600.00$2,600.00 $3,850.00$3,850.00 $0.00 
7Manhole Adjustment, Major3Each$3,400.00$10,200.00 $3,500.00$10,500.00 $0.00 
8Overlay, HMA, 2 in3550S.Y.$23.00$81,650.00 $21.00$74,550.00 $0.00 
9Removal of Shared Use Path120S.Y.$9.00$1,080.00 $11.20$1,344.00 $0.00 
10Shared Use Path, PCC, 6 in120S.Y.$124.00$14,880.00 $67.20$8,064.00 $0.00 
11Full Depth Patches150S.Y.$206.00$30,900.00 $145.60$21,840.00 $0.00 
12Seeding, Native Mix3Acres$20,000.00$60,000.00 $7,700.00$23,100.00 $0.00 
13Seeding, Erosion Control Mix23Acres$1,800.00$41,400.00 $2,240.00$51,520.00 $0.00 
14Seeding, Offsite7Acres$1,500.00$10,500.00 $5,040.00$35,280.00 $0.00 
15Relocate Tree3Each$1,000.00$3,000.00 $700.00$2,100.00 $0.00 
16SWPPP Management1L.S.$7,700.00$7,700.00 $8,400.00$8,400.00 $0.00 
17Filter Sock, Install6000L.F.$5.00$30,000.00 $2.80$16,800.00 $0.00 
18Filter Sock, Removal6000L.F.$1.00$6,000.00 $0.14$840.00 $0.00 
19Silt Fence, Install2000L.F.$2.00$4,000.00 $2.80$5,600.00 $0.00 
20Silt Fence, Removal2000L.F.$1.00$2,000.00 $0.14$280.00 $0.00 
21Temporary RECP, Type 2B1800S.Y.$5.00$9,000.00 $1.75$3,150.00 $0.00 
22TRM, Type 2120S.F.$15.00$1,800.00 $5.60$672.00 $0.00 
23Check Dam, Rock90Tons$51.00$4,590.00 $71.40$6,426.00 $0.00 
24Rip Rap, Class D430Tons$49.00$21,070.00 $84.00$36,120.00 $0.00 
25Rip Rap, Class E55Tons$51.00$2,805.00 $84.00$4,620.00 $0.00 
26Rip Rap, Recycled Concrete50Tons$49.00$2,450.00 $42.00$2,100.00 $0.00 
27Shoreline Treatment, Type 1, Rip Rap10230L.F.$100.00$1,023,000.00 $88.00$900,240.00 $0.00 
28Shoreline Treatment, Type 2, Flexamat6765L.F.$12.00$81,180.00 $38.00$257,070.00 $0.00 
29Shoreline Treatment, Type 3, Fiber Log7130L.F.$18.00$128,340.00 $11.00$78,430.00 $0.00 
30Repurposed Granite Stone Feature8Each$5,500.00$44,000.00 $4,900.00$39,200.00 $0.00 
31Repurposed Sandstone Feature25Each$2,200.00$55,000.00 $2,800.00$70,000.00 $0.00 
32Stabilized Construction Entrance140Tons$41.00$5,740.00 $50.40$7,056.00 $0.00 
33Stabilized Construction Entrance, Removal4Each$2,000.00$8,000.00 $700.00$2,800.00 $0.00 
34Crushed Rock, Access Road350Tons$33.00$11,550.00 $43.40$15,190.00 $0.00 
35Access Road Removal1L.S.$5,500.00$5,500.00 $4,200.00$4,200.00 $0.00 
36Mobilization1L.S.$324,757.00$324,757.00 $480,000.00$480,000.00 $0.00 
37Type A Fish Habitat2Each$3,600.00$7,200.00 $1,960.00$3,920.00 $0.00 
38Type B Fish Habitat19Each$1,700.00$32,300.00 $2,380.00$45,220.00 $0.00 
39Type C Fish Habitat17Each$1,500.00$25,500.00 $420.00$7,140.00 $0.00 
40Type E Fish Habitat30Each$1,600.00$48,000.00 $140.00$4,200.00 $0.00 
41Type F Fish Habitat9Each$5,200.00$46,800.00 $1,820.00$16,380.00 $0.00 
42Type G Fish Habitat19Each$3,600.00$68,400.00 $420.00$7,980.00 $0.00 
43Type H Fish Habitat14Each$1,600.00$22,400.00 $1,820.00$25,480.00 $0.00 
44Type J Fish Habitat4Each$2,000.00$8,000.00 $3,780.00$15,120.00 $0.00 
45Impoundment Discharge1L.S.$40,000.00$40,000.00 $60,000.00$60,000.00 $0.00 
46Offsite Waste Disposal375Tons$92.00$34,500.00 $168.00$63,000.00 $0.00 
Alternate        
47Borrow Excavation, Class 1060000B.C.Y.$4.00$240,000.00 $5.00$300,000.00 $0.00 
Alternate        
48Borrow Excavation, Hauling60000B.C.Y.$20.00$1,200,000.00 $14.00$840,000.00 $0.00 
      $5,260,000.00  $5,801,321.20  $0.00 
 



 

6/16/2019