IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Pikes Peak State Park | Date: 3/20/2014 | Project No. |
| Well Replacement | County: | CLAYTON | Time: 11:00 a.m. | 06-03-22-03 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $80,400.00 | Contractor: | Cahoy Pump Service | Shawver Well Company Inc. | Sam's Well Drilling Inc. | |||||||||
| Funding Source: 100% REAP OS Acquisition & Development, | 24568 - 150th ST | 2700 Stanley Ave | PO Box 150 | ||||||||||
| Sumner IA 50674 | Fredericksburg IA 50630 | Randolph WI 53956 | |||||||||||
| Plan Sets Requested: 5 | Quantities | 563-578-1130 | 563-237-5341 | 920-326-5193 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Clearing and Grubbing | 1 | L.S. | $4,849.00 | $4,849.00 | $1,350.00 | $1,350.00 | $2,500.00 | $2,500.00 | ||||
| 2 | Drill 14.75" Hole from 0' to Estimated 40' | 40 | L.F. | $40.00 | $1,600.00 | $50.00 | $2,000.00 | $40.00 | $1,600.00 | ||||
| 3 | Furnish & Install Estimated 41' of 13" Temporary Casing | 41 | L.F. | $66.00 | $2,706.00 | $20.00 | $820.00 | $50.00 | $2,050.00 | ||||
| 4 | Grout Surface Casing with Sacks of EZ Seal Grout | 5 | Each | $49.00 | $245.00 | $75.00 | $375.00 | $50.00 | $250.00 | ||||
| 5 | Drill 12.5" Diameter Hole from Estimated 40' to Estimated 505' | 465 | L.F. | $27.00 | $12,555.00 | $48.00 | $22,320.00 | $65.00 | $30,225.00 | ||||
| 6 | Furnish & Install Estimated 506' of 8" ODx0.322 Wall, A53B Steel Casing | 506 | L.F. | $35.00 | $17,710.00 | $30.00 | $15,180.00 | $40.00 | $20,240.00 | ||||
| 7 | Grouting Equipment Setup (Includes Bottom Casing Packer) | 1 | L.S. | $1,200.00 | $1,200.00 | $2,750.00 | $2,750.00 | $3,500.00 | $3,500.00 | ||||
| 8 | Furnish & Install Estimated 275 Sacks of Neat Cement Grout | 275 | Each | $28.00 | $7,700.00 | $26.00 | $7,150.00 | $30.00 | $8,250.00 | ||||
| 9 | Drill 7.875" Hole from 505' to Estimated 650' | 145 | L.F. | $43.00 | $6,235.00 | $30.00 | $4,350.00 | $35.00 | $5,075.00 | ||||
| 10 | Clean Bottom of Well of Debris, Air Lift, & Develop for 1 Hour | 1 | L.S. | $560.00 | $560.00 | $375.00 | $375.00 | $750.00 | $750.00 | ||||
| 11 | Furnish & Install Test Pump (50-75 GPM) and Test Pump Well | 8 | HR. | $157.00 | $1,256.00 | $975.00 | $7,800.00 | $400.00 | $3,200.00 | ||||
| 12 | Chlorinate Well, Collect Geologic Samples & Submit IGS & IDNR Reports | 1 | L.S. | $400.00 | $400.00 | $325.00 | $325.00 | $1,500.00 | $1,500.00 | ||||
| 13 | Furnish & Install Pitless Unit | 1 | L.S. | $8,427.00 | $8,427.00 | $8,800.00 | $8,800.00 | $6,350.00 | $6,350.00 | ||||
| 14 | Install Static Water Level Line & Gage | 1 | L.S. | $388.00 | $388.00 | $475.00 | $475.00 | $750.00 | $750.00 | ||||
| 15 | Furnish & Install 15 HP Single Phase Submersible Pump, Motor & Sch 80 Drop Pipe | 1 | L.S. | $13,900.00 | $13,900.00 | $20,000.00 | $20,000.00 | $16,230.00 | $16,230.00 | ||||
| 16 | Electric Service (Copper) to Well in Conduit from Well House Power Panel | 1 | L.S. | $3,780.00 | $3,780.00 | $1,695.00 | $1,695.00 | $950.00 | $950.00 | ||||
| 17 | Furnish & Install 2" CL 160 PVC Water Line from Well to Inside Well House | 60 | L.F. | $44.00 | $2,640.00 | $17.50 | $1,050.00 | $20.00 | $1,200.00 | ||||
| 18 | Install Well Blow-Off Assembly in Well House | 1 | L.S. | $664.00 | $664.00 | $1,070.00 | $1,070.00 | $1,707.00 | $1,707.00 | ||||
| 19 | Replace & Dispose Existing Pressure Tanks | 3 | Each | $1,248.00 | $3,744.00 | $1,700.00 | $5,100.00 | $900.00 | $2,700.00 | ||||
| 20 | Furnish & Install Outside Frost-Free Water Faucet | 1 | Each | $324.00 | $324.00 | $375.00 | $375.00 | $1,900.00 | $1,900.00 | ||||
| 21 | Connect New Water Supply to Existing with New Piping & Required Water Sampling Bibs | 1 | L.S. | $5,481.00 | $5,481.00 | $3,250.00 | $3,250.00 | $3,150.00 | $3,150.00 | ||||
| 22 | Reconnect Existing Chlorination System & Provide Small Day Tank as Required | 1 | L.S. | $640.00 | $640.00 | $200.00 | $200.00 | $1,500.00 | $1,500.00 | ||||
| 23 | Remove Existing Pump & Plug Well | 1 | L.S. | $5,415.00 | $5,415.00 | $5,675.00 | $5,675.00 | $6,800.00 | $6,800.00 | ||||
| 24 | Seed, Fertilize, & Mulch all Disturbed Areas | 1 | L.S. | $1,835.00 | $1,835.00 | $2,750.00 | $2,750.00 | $2,000.00 | $2,000.00 | ||||
| 25 | Mobilization | 1 | L.S. | $11,550.00 | $11,550.00 | $3,250.00 | $3,250.00 | $5,500.00 | $5,500.00 | ||||
| $115,804.00 | $118,485.00 | $129,877.00 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $80,400.00 | Contractor: | Municipal Well & Pump | Hagerty Earthworks LLC | ||||||||||
| Funding Source: 100% REAP OS Acquisition & Development, | 1212 Storbeck Dr | 300 E 2nd St Suite 304 | |||||||||||
| Waupun WI 53963 | Muscatine IA 52761 | ||||||||||||
| Plan Sets Requested: 5 | Quantities | 920-324-3400 | 563-260-3877 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Clearing and Grubbing | 1 | L.S. | $3,000.00 | $3,000.00 | $500.00 | $500.00 | $0.00 | |||||
| 2 | Drill 14.75" Hole from 0' to Estimated 40' | 40 | L.F. | $124.00 | $4,960.00 | $78.00 | $3,120.00 | $0.00 | |||||
| 3 | Furnish & Install Estimated 41' of 13" Temporary Casing | 41 | L.F. | $40.00 | $1,640.00 | $54.00 | $2,214.00 | $0.00 | |||||
| 4 | Grout Surface Casing with Sacks of EZ Seal Grout | 5 | Each | $66.00 | $330.00 | $28.00 | $140.00 | $0.00 | |||||
| 5 | Drill 12.5" Diameter Hole from Estimated 40' to Estimated 505' | 465 | L.F. | $60.00 | $27,900.00 | $68.00 | $31,620.00 | $0.00 | |||||
| 6 | Furnish & Install Estimated 506' of 8" ODx0.322 Wall, A53B Steel Casing | 506 | L.F. | $37.00 | $18,722.00 | $34.00 | $17,204.00 | $0.00 | |||||
| 7 | Grouting Equipment Setup (Includes Bottom Casing Packer) | 1 | L.S. | $8,720.00 | $8,720.00 | $3,500.00 | $3,500.00 | $0.00 | |||||
| 8 | Furnish & Install Estimated 275 Sacks of Neat Cement Grout | 275 | Each | $23.00 | $6,325.00 | $33.00 | $9,075.00 | $0.00 | |||||
| 9 | Drill 7.875" Hole from 505' to Estimated 650' | 145 | L.F. | $44.00 | $6,380.00 | $34.00 | $4,930.00 | $0.00 | |||||
| 10 | Clean Bottom of Well of Debris, Air Lift, & Develop for 1 Hour | 1 | L.S. | $1,480.00 | $1,480.00 | $1,500.00 | $1,500.00 | $0.00 | |||||
| 11 | Furnish & Install Test Pump (50-75 GPM) and Test Pump Well | 8 | HR. | $191.00 | $1,528.00 | $565.00 | $4,520.00 | $0.00 | |||||
| 12 | Chlorinate Well, Collect Geologic Samples & Submit IGS & IDNR Reports | 1 | L.S. | $1,130.00 | $1,130.00 | $4,500.00 | $4,500.00 | $0.00 | |||||
| 13 | Furnish & Install Pitless Unit | 1 | L.S. | $6,360.00 | $6,360.00 | $6,560.00 | $6,560.00 | $0.00 | |||||
| 14 | Install Static Water Level Line & Gage | 1 | L.S. | $390.00 | $390.00 | $405.00 | $405.00 | $0.00 | |||||
| 15 | Furnish & Install 15 HP Single Phase Submersible Pump, Motor & Sch 80 Drop Pipe | 1 | L.S. | $11,370.00 | $11,370.00 | $20,385.00 | $20,385.00 | $0.00 | |||||
| 16 | Electric Service (Copper) to Well in Conduit from Well House Power Panel | 1 | L.S. | $2,400.00 | $2,400.00 | $3,230.00 | $3,230.00 | $0.00 | |||||
| 17 | Furnish & Install 2" CL 160 PVC Water Line from Well to Inside Well House | 60 | L.F. | $67.00 | $4,020.00 | $31.00 | $1,860.00 | $0.00 | |||||
| 18 | Install Well Blow-Off Assembly in Well House | 1 | L.S. | $2,220.00 | $2,220.00 | $1,650.00 | $1,650.00 | $0.00 | |||||
| 19 | Replace & Dispose Existing Pressure Tanks | 3 | Each | $1,567.00 | $4,701.00 | $780.00 | $2,340.00 | $0.00 | |||||
| 20 | Furnish & Install Outside Frost-Free Water Faucet | 1 | Each | $170.00 | $170.00 | $150.00 | $150.00 | $0.00 | |||||
| 21 | Connect New Water Supply to Existing with New Piping & Required Water Sampling Bibs | 1 | L.S. | $860.00 | $860.00 | $535.00 | $535.00 | $0.00 | |||||
| 22 | Reconnect Existing Chlorination System & Provide Small Day Tank as Required | 1 | L.S. | $500.00 | $500.00 | $100.00 | $100.00 | $0.00 | |||||
| 23 | Remove Existing Pump & Plug Well | 1 | L.S. | $4,960.00 | $4,960.00 | $3,000.00 | $3,000.00 | $0.00 | |||||
| 24 | Seed, Fertilize, & Mulch all Disturbed Areas | 1 | L.S. | $3,590.00 | $3,590.00 | $2,000.00 | $2,000.00 | $0.00 | |||||
| 25 | Mobilization | 1 | L.S. | $25,260.00 | $25,260.00 | $28,720.00 | $28,720.00 | $0.00 | |||||
| $148,916.00 | $153,758.00 | $0.00 | |||||||||||
Cahoy Pump Service, Sumner, IA
12/21/2025