|
IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | 12 Mile Lake Wildlife Management Area | Date: 3/20/2014 | Project No. |
| 12 Mile Lake WMA - WCS Replacement | County: | EMMET | Time: 3:00 p.m. | 14-01-32-01 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $18,500.00 | Contractor: | Schoon Construction, Inc. | Valley Contracting, Inc. | ||||||||||
| Funding Source: 100% F&W Trust - Other, | 1500 S 2nd St PO Box 800 | 1850 Hwy 4 South | |||||||||||
| Cherokee IA 51012 | Estherville IA 51334 | ||||||||||||
| Plan Sets Requested: 0 | Quantities | 712-225-5736 | 712-362-4969 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $2,650.00 | $2,650.00 | $750.00 | $750.00 | $0.00 | |||||
| 2 | Removals | 1 | L.S. | $2,250.00 | $2,250.00 | $1,200.00 | $1,200.00 | $0.00 | |||||
| 3 | 14" Dual Wall HDPE Pipe (Non Perf) | 80 | L.F. | $48.61 | $3,888.80 | $30.00 | $2,400.00 | $0.00 | |||||
| 4 | Tile Field Connection (Concrete Collar) | 2 | Each | $510.00 | $1,020.00 | $150.00 | $300.00 | $0.00 | |||||
| 5 | 4'x4' Precast Box w/ Base, Invert, and Steps | 1 | L.S. | $6,880.00 | $6,880.00 | $6,000.00 | $6,000.00 | $0.00 | |||||
| 6 | Stoplog Channel - Dual 3"x3"x1/4" Aluminum Angles | 16 | L.F. | $60.00 | $960.00 | $2,100.00 | $33,600.00 | $0.00 | |||||
| 7 | Grated Structure Lid with Access Door | 1 | L.S. | $2,135.00 | $2,135.00 | $1,240.00 | $1,240.00 | $0.00 | |||||
| 8 | Aluminum Stoplogs | 1 | L.S. | $920.00 | $920.00 | $1,880.00 | $1,880.00 | $0.00 | |||||
| 9 | Stoplog Removal Tool | 1 | Each | $125.00 | $125.00 | $89.00 | $89.00 | $0.00 | |||||
| 10 | Stoplog Storage Structure (Includes CMP and Lid) | 1 | Each | $1,035.00 | $1,035.00 | $765.00 | $765.00 | $0.00 | |||||
| 11 | Crushed Rock Fill (1" Minus) | 25 | Tons | $23.50 | $587.50 | $36.00 | $900.00 | $0.00 | |||||
| $22,451.30 | $49,124.00 | $0.00 | |||||||||||
| Alternate | |||||||||||||
| 12 | Waterman C-10 Canal Gate (include stem cover) | 1 | L.S. | $1,640.00 | $1,640.00 | $996.00 | $996.00 | $0.00 | |||||
| Alternate | |||||||||||||
| 13 | Grated Structure Lid Modification for Canal Gate | 1 | L.S. | $150.00 | $150.00 | $100.00 | $100.00 | $0.00 | |||||
| $24,241.30 | $50,220.00 | $0.00 | |||||||||||
12/21/2025