 Bids For:  Location:   Brushy Creek Recreation Area  Date: 3/20/2014  Project No.  
  Beach Remodel Phase 1  County:   WEBSTER  Time: 11:00 a.m.  14-02-94-02

 

 
1
2
3
Estimated Cost: $730,646.00
Contractor: 
Absolute Concrete Construction IncWicks Construction CoMPS Engineers
Funding Source: 50% Infrastructure 2015, 50% Federal-Land and Water Conservation Fund, 505 1st Ave
2201 State Hwy 9
PO Box 428
1444 Illinois St
Slater IA  50244Decorah IA  52101Des Moines IA  50314
Plan Sets Requested: 10
Quantities
515-228-3030563-382-2325515-221-9832
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$4,500.00$4,500.00 $4,500.00$4,500.00 $20,000.00$20,000.00 
2Grading1L.S.$80,700.00$80,700.00 $80,700.00$80,700.00 $80,000.00$80,000.00 
38-inch Filter Sock1810L.F.$3.00$5,430.00 $2.10$3,801.00 $2.50$4,525.00 
4Seeding , Fertilizing and Mulching17Acres$2,000.00$34,000.00 $1,850.00$31,450.00 $2,850.00$48,450.00 
5Type 3B Erosion Control Blanket, 8 Feet in Width855L.F.$2.75$2,351.25 $3.25$2,778.75 $4.00$3,420.00 
68-inch Sanitary Sewer (PVC Truss)220L.F.$48.50$10,670.00 $121.00$26,620.00 $50.00$11,000.00 
74-inch Sanitary Sewer Service (PVC SDR 26)85L.F.$18.75$1,593.75 $48.00$4,080.00 $28.00$2,380.00 
82-inch HDPE Force Main1398L.F.$8.00$11,184.00 $14.25$19,921.50 $20.00$27,960.00 
948-inch Diameter Circular Sanitary Sewer Manhole1Each$4,620.00$4,620.00 $4,020.00$4,020.00 $5,000.00$5,000.00 
10Sanitary Sewer Force Main Air Relief Valve1Each$6,505.00$6,505.00 $6,400.00$6,400.00 $9,000.00$9,000.00 
11Sanitary Sewer Pump Station1Each$15,960.00$15,960.00 $32,241.00$32,241.00 $30,000.00$30,000.00 
124-inch Sanitary Sewer Cleanout (PVC SDR 26)1Each$385.00$385.00 $900.00$900.00 $700.00$700.00 
132-inch Water Line (PVC SDR 21)1033L.F.$8.00$8,264.00 $24.37$25,174.21 $25.00$25,825.00 
142-inch Tee (PVC SDR 21)3Each$335.00$1,005.00 $200.00$600.00 $40.00$120.00 
15Curb Stop6Each$535.00$3,210.00 $1,000.00$6,000.00 $800.00$4,800.00 
161-inch PE Water Line20L.F.$16.05$321.00 $27.25$545.00 $25.00$500.00 
172"x1" Reducer (PVC SDR 21)1Each$150.00$150.00 $75.00$75.00 $25.00$25.00 
181"x1/2" PE Reducer2Each$125.00$250.00 $75.00$150.00 $25.00$50.00 
191/2" PE Water Line23L.F.$15.55$357.65 $22.00$506.00 $25.00$575.00 
20Haws Corp Model 3202G Drinking Fountain (or Approved Equal)1Each$4,300.00$4,300.00 $4,600.00$4,600.00 $3,500.00$3,500.00 
21Most Dependable Fountains Model 525SMSS Foot Shower (or Approved Equal)1Each$2,500.00$2,500.00 $3,400.00$3,400.00 $3,000.00$3,000.00 
228-inch Perforated Subdrain481L.F.$5.00$2,405.00 $5.00$2,405.00 $10.00$4,810.00 
2312-inch RCP Class III131L.F.$23.80$3,117.80 $23.80$3,117.80 $38.00$4,978.00 
2418-inch RCP Class III198L.F.$27.10$5,365.80 $27.10$5,365.80 $44.00$8,712.00 
2524-inch RCP Class III84L.F.$33.00$2,772.00 $33.00$2,772.00 $58.00$4,872.00 
2612-inch RCP Class III FES with Trash Guard2Each$925.00$1,850.00 $925.00$1,850.00 $1,500.00$3,000.00 
2718-inch RCP Class III FES with Trash Guard & Footing1Each$1,700.00$1,700.00 $1,700.00$1,700.00 $3,000.00$3,000.00 
2818-inch Diameter Circular Area Intake3Each$600.00$1,800.00 $600.00$1,800.00 $2,000.00$6,000.00 
2924-inch Diameter Circular Area Intake1Each$675.00$675.00 $675.00$675.00 $2,250.00$2,250.00 
3030-inch Diameter Circular Area Intake6Each$900.00$5,400.00 $900.00$5,400.00 $2,500.00$15,000.00 
314'x4' Open Sided Area Intake1Each$4,300.00$4,300.00 $4,300.00$4,300.00 $4,500.00$4,500.00 
32Subdrain Cleanout4Each$500.00$2,000.00 $500.00$2,000.00 $500.00$2,000.00 
33Class 'E' Riprap40Tons$51.20$2,048.00 $51.20$2,048.00 $50.00$2,000.00 
34Electrical Improvements1L.S.$30,250.00$30,250.00 $31,250.00$31,250.00 $14,232.00$14,232.00 
35Full Depth Saw Cut97L.F.$10.00$970.00 $4.00$388.00 $5.00$485.00 
36Special Backfill1855Tons$21.45$39,789.75 $20.00$37,100.00 $20.00$37,100.00 
37Granular Base for Sidewalks161Tons$23.95$3,855.95 $20.00$3,220.00 $20.00$3,220.00 
386-inch Reinforced PCC7227S.Y.$36.00$260,172.00 $35.50$256,558.50 $43.60$315,097.20 
395-inch Reinforced PCC Sidewalk644S.Y.$50.00$32,200.00 $54.00$34,776.00 $31.05$19,996.20 
40Sidewalk Detectable Warnings3Each$290.00$870.00 $35.00$105.00 $120.00$360.00 
41Precast Concrete Parking Wheel Stops45Each$100.00$4,500.00 $100.00$4,500.00 $50.00$2,250.00 
42Paint Striping1L.S.$3,000.00$3,000.00 $3,950.00$3,950.00 $3,955.00$3,955.00 
43Concrete Pipe Bollards2Each$290.00$580.00 $300.00$600.00 $185.00$370.00 
44Bio-Retention Facility1L.S.$42,500.00$42,500.00 $40,000.00$40,000.00 $41,300.00$41,300.00 
45SWPPP1L.S.$1,000.00$1,000.00 $7,100.00$7,100.00 $8,700.00$8,700.00 
46Construction Survey Staking1L.S.$10,000.00$10,000.00 $8,000.00$8,000.00 $5,000.00$5,000.00 
47Mobilization1L.S.$55,000.00$55,000.00 $48,000.00$48,000.00 $48,000.00$48,000.00 
      $716,377.95  $767,443.56  $842,017.40 
Alternate        
48Special Backfill485Tons$21.45$10,403.25 $20.00$9,700.00 $20.00$9,700.00 
Alternate        
49Granular Base for Sidewalks7Tons$35.00$245.00 $20.00$140.00 $20.00$140.00 
Alternate        
506-inch Reinforced PCC1942S.Y.$36.00$69,912.00 $38.65$75,058.30 $38.90$75,543.80 
Alternate        
515-inch Reinforced PCC Sidewalk26S.Y.$50.00$1,300.00 $55.00$1,430.00 $38.46$999.96 
Alternate        
52Sidewalk Detectable Warnings2Each$290.00$580.00 $35.00$70.00 $120.00$240.00 
Alternate        
53Paint Striping1L.S.$350.00$350.00 $350.00$350.00 $500.00$500.00 
Alternate        
54Construction Survey Staking1L.S.$2,500.00$2,500.00 $1,250.00$1,250.00 $1,000.00$1,000.00 
      $801,668.20  $855,441.86  $930,141.16 
 
4
5
6
Estimated Cost: $730,646.00
Contractor: 
Jensen Builders LTDAllied Manatts Group Inc
Funding Source: 50% Infrastructure 2015, 50% Federal-Land and Water Conservation Fund, 1175 S 32nd St
=
PO Box 687

Ft Dodge IA  50501Charles City IA  50616  
Plan Sets Requested: 10
Quantities
515-573-3292641-228-4256
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Clearing and Grubbing1L.S.$13,705.00$13,705.00 $4,725.00$4,725.00 $0.00 
2Grading1L.S.$166,273.00$166,273.00 $84,735.00$84,735.00 $0.00 
38-inch Filter Sock1810L.F.$3.00$5,430.00 $3.26$5,900.60 $0.00 
4Seeding , Fertilizing and Mulching17Acres$2,227.00$37,859.00 $4,410.00$74,970.00 $0.00 
5Type 3B Erosion Control Blanket, 8 Feet in Width855L.F.$3.00$2,565.00 $2.10$1,795.50 $0.00 
68-inch Sanitary Sewer (PVC Truss)220L.F.$55.00$12,100.00 $127.05$27,951.00 $0.00 
74-inch Sanitary Sewer Service (PVC SDR 26)85L.F.$21.00$1,785.00 $50.40$4,284.00 $0.00 
82-inch HDPE Force Main1398L.F.$9.00$12,582.00 $14.96$20,914.08 $0.00 
948-inch Diameter Circular Sanitary Sewer Manhole1Each$5,277.00$5,277.00 $4,221.00$4,221.00 $0.00 
10Sanitary Sewer Force Main Air Relief Valve1Each$7,430.00$7,430.00 $6,720.00$6,720.00 $0.00 
11Sanitary Sewer Pump Station1Each$18,228.00$18,228.00 $33,853.05$33,853.05 $0.00 
124-inch Sanitary Sewer Cleanout (PVC SDR 26)1Each$440.00$440.00 $945.00$945.00 $0.00 
132-inch Water Line (PVC SDR 21)1033L.F.$9.00$9,297.00 $25.59$26,434.47 $0.00 
142-inch Tee (PVC SDR 21)3Each$383.00$1,149.00 $210.00$630.00 $0.00 
15Curb Stop6Each$611.00$3,666.00 $1,050.00$6,300.00 $0.00 
161-inch PE Water Line20L.F.$18.00$360.00 $28.61$572.20 $0.00 
172"x1" Reducer (PVC SDR 21)1Each$171.00$171.00 $78.75$78.75 $0.00 
181"x1/2" PE Reducer2Each$143.00$286.00 $78.75$157.50 $0.00 
191/2" PE Water Line23L.F.$18.00$414.00 $23.10$531.30 $0.00 
20Haws Corp Model 3202G Drinking Fountain (or Approved Equal)1Each$4,911.00$4,911.00 $4,830.00$4,830.00 $0.00 
21Most Dependable Fountains Model 525SMSS Foot Shower (or Approved Equal)1Each$2,855.00$2,855.00 $3,570.00$3,570.00 $0.00 
228-inch Perforated Subdrain481L.F.$15.00$7,215.00 $5.25$2,525.25 $0.00 
2312-inch RCP Class III131L.F.$49.00$6,419.00 $24.99$3,273.69 $0.00 
2418-inch RCP Class III198L.F.$55.00$10,890.00 $28.46$5,635.08 $0.00 
2524-inch RCP Class III84L.F.$83.00$6,972.00 $34.65$2,910.60 $0.00 
2612-inch RCP Class III FES with Trash Guard2Each$1,199.00$2,398.00 $971.25$1,942.50 $0.00 
2718-inch RCP Class III FES with Trash Guard & Footing1Each$2,193.00$2,193.00 $1,785.00$1,785.00 $0.00 
2818-inch Diameter Circular Area Intake3Each$1,782.00$5,346.00 $630.00$1,890.00 $0.00 
2924-inch Diameter Circular Area Intake1Each$1,879.00$1,879.00 $708.75$708.75 $0.00 
3030-inch Diameter Circular Area Intake6Each$2,353.00$14,118.00 $945.00$5,670.00 $0.00 
314'x4' Open Sided Area Intake1Each$5,117.00$5,117.00 $4,515.00$4,515.00 $0.00 
32Subdrain Cleanout4Each$320.00$1,280.00 $525.00$2,100.00 $0.00 
33Class 'E' Riprap40Tons$56.00$2,240.00 $64.26$2,570.40 $0.00 
34Electrical Improvements1L.S.$14,827.00$14,827.00 $32,812.50$32,812.50 $0.00 
35Full Depth Saw Cut97L.F.$6.00$582.00 $7.35$712.95 $0.00 
36Special Backfill1855Tons$22.00$40,810.00 $22.52$41,774.60 $0.00 
37Granular Base for Sidewalks161Tons$24.00$3,864.00 $25.15$4,049.15 $0.00 
386-inch Reinforced PCC7227S.Y.$36.00$260,172.00 $49.25$355,929.75 $0.00 
395-inch Reinforced PCC Sidewalk644S.Y.$41.00$26,404.00 $67.00$43,148.00 $0.00 
40Sidewalk Detectable Warnings3Each$215.00$645.00 $315.00$945.00 $0.00 
41Precast Concrete Parking Wheel Stops45Each$145.00$6,525.00 $210.00$9,450.00 $0.00 
42Paint Striping1L.S.$4,517.00$4,517.00 $7,350.00$7,350.00 $0.00 
43Concrete Pipe Bollards2Each$315.00$630.00 $735.00$1,470.00 $0.00 
44Bio-Retention Facility1L.S.$76,642.00$76,642.00 $39,900.00$39,900.00 $0.00 
45SWPPP1L.S.$1,600.00$1,600.00 $7,350.00$7,350.00 $0.00 
46Construction Survey Staking1L.S.$8,000.00$8,000.00 $21,157.50$21,157.50 $0.00 
47Mobilization1L.S.$32,434.00$32,434.00 $94,500.00$94,500.00 $0.00 
Alternate        
48Special Backfill485Tons$22.00$10,670.00 $22.52$10,922.20 $0.00 
Alternate        
49Granular Base for Sidewalks7Tons$24.00$168.00 $36.75$257.25 $0.00 
Alternate        
506-inch Reinforced PCC1942S.Y.$36.00$69,912.00 $63.75$123,802.50 $0.00 
Alternate        
515-inch Reinforced PCC Sidewalk26S.Y.$41.00$1,066.00 $67.00$1,742.00 $0.00 
Alternate        
52Sidewalk Detectable Warnings2Each$215.00$430.00 $315.00$630.00 $0.00 
Alternate        
53Paint Striping1L.S.$400.00$400.00 $750.00$750.00 $0.00 
Alternate        
54Construction Survey Staking1L.S.$575.00$575.00 $3,780.00$3,780.00 $0.00 
      $933,723.00  $1,152,078.12  $0.00 
 



 