IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Geode State Park | Date: 6/19/2014 | Project No. |
| Geode Wastewater System Ugrade | County: | DES MOINES | Time: 11:00 am | 12-06-29-02 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $1,057,875.00 | Contractor: | Miller Trucking & Excavating | Smith Seeding, Inc. | ||||||||||
| Funding Source: 100% Health and Safety Account, | 3303 John Deere Rd | 219 N 1st St | |||||||||||
| Silvis IL 61282 | Eldridge IA 52748 | ||||||||||||
| Plan Sets Requested: 2 | Quantities | 309-755-7644 | 563-285-2604 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | MOBILIZATION | 1 | L.S. | $50,000.00 | $50,000.00 | $35,000.00 | $35,000.00 | $0.00 | |||||
| 2 | SWPP & COMPLIANCE ITEMS | 1 | L.S. | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $0.00 | |||||
| 3 | LAGOON CONTENTS, PUMPING & DISPOSAL | 1 | L.S. | $75,000.00 | $75,000.00 | $250,000.00 | $250,000.00 | $0.00 | |||||
| 4 | INTERMEDIATE BERM CONSTRUCTION (COMPACTED MAT'L) | 1100 | C.Y. | $12.00 | $13,200.00 | $15.00 | $16,500.00 | $0.00 | |||||
| 5 | BORROW (NORTH BERM) EXCAVATION | 1200 | C.Y. | $10.00 | $12,000.00 | $20.00 | $24,000.00 | $0.00 | |||||
| 6 | IMPORTED FILL | 600 | C.Y. | $20.00 | $12,000.00 | $20.00 | $12,000.00 | $0.00 | |||||
| 7 | 6" LAGOON PIPING | 220 | L.F. | $80.00 | $17,600.00 | $41.00 | $9,020.00 | $0.00 | |||||
| 8 | 8" LAGOON PIPING & VALVES | 325 | L.F. | $150.00 | $48,750.00 | $75.00 | $24,375.00 | $0.00 | |||||
| 9 | CONTROL STRUCTURES, (MH2, MH3, MH4, 5' DIA) PLEASE NOTE THAT LINEAR FOOT = VERTICAL FOOT | 24 | L.F. | $860.00 | $20,640.00 | $2,000.00 | $48,000.00 | $0.00 | |||||
| 10 | INFLUENT CONTROL & FLOW MEASUREMENT STRUCTURE | 1 | L.S. | $5,500.00 | $5,500.00 | $5,000.00 | $5,000.00 | $0.00 | |||||
| 11 | GRADING (INTERIOR OF EXISTING BERM) | 1 | L.S. | $16,000.00 | $16,000.00 | $4,000.00 | $4,000.00 | $0.00 | |||||
| 12 | RIPRAP -INSTALLED | 1600 | Tons | $50.00 | $80,000.00 | $35.00 | $56,000.00 | $0.00 | |||||
| 13 | FILTER FABRIC - INSTALLED | 600 | S.Y. | $2.00 | $1,200.00 | $3.00 | $1,800.00 | $0.00 | |||||
| 14 | CLEARING & TREE REMOVAL | 1 | L.S. | $36,000.00 | $36,000.00 | $20,000.00 | $20,000.00 | $0.00 | |||||
| 15 | LIFT STATION STRUCTURE, 8' DIA (LINEAR FOOT = VERTICAL FOOT IN THIS CASE) | 12 | L.F. | $1,600.00 | $19,200.00 | $1,200.00 | $14,400.00 | $0.00 | |||||
| 16 | VALVE VAULT STRUCTURE, 6' DIA (LINEAR FOOT = VERTICAL FOOT IN THIS CASE) | 10 | L.F. | $1,500.00 | $15,000.00 | $800.00 | $8,000.00 | $0.00 | |||||
| 17 | DUPLEX PUMP SYSTEM AND CONTROLS | 1 | L.S. | $45,000.00 | $45,000.00 | $25,000.00 | $25,000.00 | $0.00 | |||||
| 18 | LIFT STATION/VALVE VAULT; VALVES AND PIPING | 1 | L.S. | $14,000.00 | $14,000.00 | $15,000.00 | $15,000.00 | $0.00 | |||||
| 19 | 3" FORCE MAIN - INSTALLED, OPEN TRENCH AND DIRECTIONAL DRILLED WHERE SHOWN ON DRAWINGS | 7400 | L.F. | $20.00 | $148,000.00 | $40.00 | $296,000.00 | $0.00 | |||||
| 20 | 12" GRAVITY SEWER INSTALLED | 70 | L.F. | $150.00 | $10,500.00 | $36.00 | $2,520.00 | $0.00 | |||||
| 21 | AIR RELEASE MHs & VALVES | 7 | Each | $8,500.00 | $59,500.00 | $7,200.00 | $50,400.00 | $0.00 | |||||
| 22 | DRAIN VALVE VAULTS & VALVES | 5 | Each | $8,500.00 | $42,500.00 | $5,600.00 | $28,000.00 | $0.00 | |||||
| 23 | 48" MH, TYPE SW-401, OUTFALL STRUCTURE | 1 | Each | $3,800.00 | $3,800.00 | $5,600.00 | $5,600.00 | $0.00 | |||||
| 24 | ELECTRICAL SERVICE TO LIFT STATION | 1 | L.S. | $20,000.00 | $20,000.00 | $21,000.00 | $21,000.00 | $0.00 | |||||
| 25 | CLASS E REVETMENT - INSTALLED | 25 | Tons | $90.00 | $2,250.00 | $50.00 | $1,250.00 | $0.00 | |||||
| 26 | EROSION CONTROL SILT FENCE | 600 | L.F. | $3.50 | $2,100.00 | $3.00 | $1,800.00 | $0.00 | |||||
| 27 | SOIL SAMPLING AND TESTING FOR LINER AND BERM | 1 | L.S. | $10,000.00 | $10,000.00 | $6,000.00 | $6,000.00 | $0.00 | |||||
| 28 | SUPPLEMENTAL WATER | 1000 | GAL. | $5.00 | $5,000.00 | $1.00 | $1,000.00 | $0.00 | |||||
| 29 | SUPPLEMENTAL BENTONITE | 200 | LB. | $3.00 | $600.00 | $1.00 | $200.00 | $0.00 | |||||
| 30 | LINER CONSTRUCTION | 1500 | S.F. | $10.00 | $15,000.00 | $2.00 | $3,000.00 | $0.00 | |||||
| 31 | RESTORATION T,S,F,M | 1 | Acres | $4,800.00 | $4,800.00 | $1,500.00 | $1,500.00 | $0.00 | |||||
| 32 | ROCK EXCAVATION | 40 | C.Y. | $160.00 | $6,400.00 | $1,000.00 | $40,000.00 | $0.00 | |||||
| 33 | SWPP POST -1/2" RAINFALL EVENT INSPECTION | 12 | Each | $290.00 | $3,480.00 | $150.00 | $1,800.00 | $0.00 | |||||
| 34 | FILTER SOCK, INSTALLATION, MAINTENANCE, AND REMOVAL | 100 | L.F. | $15.00 | $1,500.00 | $6.00 | $600.00 | $0.00 | |||||
| $821,520.00 | $1,033,765.00 | $0.00 | |||||||||||
| Alternate | |||||||||||||
| 35 | A-1 PROVIDE AN ALTERNATE PRICE BID ADD/DEDUCT FOR INSTALLING THE ENTIRE LENGTH OF FORCE MAIN BY DIRECTIONAL DRILLING | 1 | L.S. | -$14,800.00 | -$14,800.00 | $250,000.00 | $250,000.00 | $0.00 | |||||
| Alternate | |||||||||||||
| 36 | A-2 PROVIDE AN ALTERNAT PRICE BID ADD/DEDUCT FOR FOLLOWING THE ALT. PIPE ROUTE SHOWN ON DRWG. CG12 & CG13 BY DIRECTIONAL DRILLING OR OPEN CUT TRENCHNG | 1 | L.S. | $8,000.00 | $8,000.00 | $10,000.00 | $10,000.00 | $0.00 | |||||
| $814,720.00 | $1,293,765.00 | $0.00 | |||||||||||
Smith Seeding, Inc., Eldridge, IA
12/21/2025