IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Beed's Lake State Park  Date: 10/17/2013  Project No.  
  Shower Building  County:   FRANKLIN  Time: 11:00 a.m.  14-02-35-02

 

 
1
2
3
Estimated Cost: $280,000.00
Contractor: 
Boulder Contracting LLCAAA Concrete LLCKing-Knutson Construction
Funding Source: 100% Infrastructure 2015, 25789 N Avenue
309 Audubon St
1205 Oak St
Grundy Center IA  50638Adair IA  50002Iowa Falls IA  50126
Plan Sets Requested: 2
Quantities
319-269-8680515-979-2004641-648-5464
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1DEMOLITION1L.S.$10,000.00$10,000.00 $7,000.00$7,000.00 $7,400.00$7,400.00 
2CLEARING AND GRUBBING1L.S.$1,200.00$1,200.00 $1,000.00$1,000.00 $2,800.00$2,800.00 
3SITE WORK AND UTILITY CONNECTIONS1L.S.$6,000.00$6,000.00 $17,000.00$17,000.00 $14,250.00$14,250.00 
4CHEYENNE PRECAST CONCRETE SHOWER BUILDING1Each$185,000.00$185,000.00 $195,000.00$195,000.00 $198,000.00$198,000.00 
5CLASS "A" CRUSHED STONE180Tons$35.00$6,300.00 $28.00$5,040.00 $20.00$3,600.00 
6SIDEWALK, PCC, 6"127.8S.Y.$40.00$5,112.00 $49.50$6,326.10 $45.00$5,751.00 
7PARKING LOT, PCC, 6"83.3S.Y.$40.00$3,332.00 $49.50$4,123.35 $45.00$3,748.50 
8SIGNING1L.S.$500.00$500.00 $1,310.00$1,310.00 $450.00$450.00 
9DRAIN-DOWN PIT1L.S.$7,000.00$7,000.00 $3,250.00$3,250.00 $3,000.00$3,000.00 
10PRECAST CONCRETE PARKING WHEEL STOPS1Each$350.00$350.00 $100.00$100.00 $120.00$120.00 
11EROSION CONTROL110L.F.$4.00$440.00 $3.50$385.00 $16.50$1,815.00 
12WATER MAIN, 2" HDPE6.4L.F.$200.00$1,280.00 $172.00$1,100.80 $200.00$1,280.00 
13ELECTRICAL SERVICE1L.S.$3,000.00$3,000.00 $4,000.00$4,000.00 $3,500.00$3,500.00 
14SANITARY SEWER PIPE, 4" C90040.7L.F.$50.00$2,035.00 $25.00$1,017.50 $50.00$2,035.00 
15PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT2.7STA.$250.00$675.00 $185.00$499.50 $260.00$702.00 
16MANHOLE, SW-301, 48"1Each$3,000.00$3,000.00 $3,250.00$3,250.00 $5,500.00$5,500.00 
17DETECTABLE WARNING PANEL12S.F.$35.00$420.00 $30.00$360.00 $40.00$480.00 
18ENGINEERING FABRIC101.3S.Y.$4.00$405.20 $4.00$405.20 $1.75$177.275 
19MACADAM STONE23Tons$35.00$805.00 $28.00$644.00 $16.09$370.07 
203/8" MINUS CRUSHED STONE10Tons$30.00$300.00 $28.00$280.00 $20.00$200.00 
21CONSTRUCTION STAKING1L.S.$2,100.00$2,100.00 $1,500.00$1,500.00 $1,980.00$1,980.00 
22MOBILIZATION1L.S.$7,500.00$7,500.00 $4,000.00$4,000.00 $9,420.00$9,420.00 
      $246,754.20  $257,591.45  $266,578.845 
 
4
5
6
Estimated Cost: $280,000.00
Contractor: 
TBB&M LLCDean Snyder Construction Co
Funding Source: 100% Infrastructure 2015, 2452 S Lakeview Drive
913 N 14th Street
PO Box 181

Greenfield IA  50849Clear Lake IA  50428  
Plan Sets Requested: 2
Quantities
515-238-9980641-357-2283
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1DEMOLITION1L.S.$14,200.00$14,200.00 $4,325.00$4,325.00 $0.00 
2CLEARING AND GRUBBING1L.S.$500.00$500.00 $1,750.00$1,750.00 $0.00 
3SITE WORK AND UTILITY CONNECTIONS1L.S.$13,500.00$13,500.00 $150.00$150.00 $0.00 
4CHEYENNE PRECAST CONCRETE SHOWER BUILDING1Each$204,600.00$204,600.00 $221,500.00$221,500.00 $0.00 
5CLASS "A" CRUSHED STONE180Tons$39.00$7,020.00 $33.75$6,075.00 $0.00 
6SIDEWALK, PCC, 6"127.8S.Y.$50.00$6,390.00 $68.25$8,722.35 $0.00 
7PARKING LOT, PCC, 6"83.3S.Y.$50.00$4,165.00 $80.55$6,709.815 $0.00 
8SIGNING1L.S.$1,400.00$1,400.00 $1,680.00$1,680.00 $0.00 
9DRAIN-DOWN PIT1L.S.$5,000.00$5,000.00 $5,195.00$5,195.00 $0.00 
10PRECAST CONCRETE PARKING WHEEL STOPS1Each$250.00$250.00 $100.00$100.00 $0.00 
11EROSION CONTROL110L.F.$17.50$1,925.00 $4.50$495.00 $0.00 
12WATER MAIN, 2" HDPE6.4L.F.$100.00$640.00 $51.00$326.40 $0.00 
13ELECTRICAL SERVICE1L.S.$3,300.00$3,300.00 $2,875.00$2,875.00 $0.00 
14SANITARY SEWER PIPE, 4" C90040.7L.F.$30.00$1,221.00 $51.00$2,075.70 $0.00 
15PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT2.7STA.$230.00$621.00 $200.00$540.00 $0.00 
16MANHOLE, SW-301, 48"1Each$10,000.00$10,000.00 $4,625.00$4,625.00 $0.00 
17DETECTABLE WARNING PANEL12S.F.$46.00$552.00 $35.50$426.00 $0.00 
18ENGINEERING FABRIC101.3S.Y.$2.00$202.60 $10.86$1,100.118 $0.00 
19MACADAM STONE23Tons$50.00$1,150.00 $33.39$767.97 $0.00 
203/8" MINUS CRUSHED STONE10Tons$50.00$500.00 $28.75$287.50 $0.00 
21CONSTRUCTION STAKING1L.S.$2,500.00$2,500.00 $1,800.00$1,800.00 $0.00 
22MOBILIZATION1L.S.$15,000.00$15,000.00 $39,688.14$39,688.14 $0.00 
      $294,636.60  $311,213.993  $0.00 
 



 

12/17/2025