IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Lost Grove WMA | Date: 5/16/2013 | Project No. |
| Main Boat Ramps | County: | SCOTT | Time: 11:00 a.m. | 08-06-82-05 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $1,400,000.00 | Contractor: | BWC Excavating LC | Langman Construction, Inc. | Wicks Construction Inc. | |||||||||
| Funding Source: 40% Marine Fuel Tax, 30% F&W Trust-Fisheries Non-Habitat Stamp, 30% Federal-Boat Safety (Coast Guard), | 1303 Hickory Hollow Rd | 220 34th Ave | PO Box 428 | ||||||||||
| Solon IA 52333 | Rock Island IL 61201 | Decorah IA 52101 | |||||||||||
| Plan Sets Requested: 16 | Quantities | 319-848-7513 | 309-786-8944 | 563-382-2325 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | CLEARING AND GRUBBING | 12 | Acres | $185.54 | $2,226.48 | $1,000.00 | $12,000.00 | $750.00 | $9,000.00 | ||||
| 2 | EXCAVATION, CL 10 RDWY+BORROW | 32911 | C.Y. | $1.11 | $36,531.21 | $6.00 | $197,466.00 | $2.50 | $82,277.50 | ||||
| 3 | GRANULAR SUBBASE | 4798 | Tons | $15.70 | $75,328.60 | $22.00 | $105,556.00 | $20.00 | $95,960.00 | ||||
| 4 | GRANULAR SHLD, TYPE A | 248 | Tons | $27.93 | $6,926.64 | $25.00 | $6,200.00 | $21.00 | $5,208.00 | ||||
| 5 | STD/S-F PCC PAV'T, CL A CL 3. 7" | 12616 | S.Y. | $27.00 | $340,632.00 | $28.50 | $359,556.00 | $32.80 | $413,804.80 | ||||
| 6 | GRANULAR SURF ON RD, CL A CR STONE | 1251 | Tons | $19.64 | $24,569.64 | $22.00 | $27,522.00 | $21.00 | $26,271.00 | ||||
| 7 | STRUCT CONCRETE (MISC.) | 436 | C.Y. | $290.00 | $126,440.00 | $280.00 | $122,080.00 | $430.35 | $187,632.60 | ||||
| 8 | APRON, CONC, 24" | 6 | Each | $1,397.92 | $8,387.52 | $500.00 | $3,000.00 | $1,500.00 | $9,000.00 | ||||
| 9 | APRON, CONC, 36" | 4 | Each | $2,266.31 | $9,065.24 | $900.00 | $3,600.00 | $2,200.00 | $8,800.00 | ||||
| 10 | CULV, CMP, ENT, 18" | 18 | L.F. | $26.71 | $480.78 | $35.00 | $630.00 | $20.00 | $360.00 | ||||
| 11 | CULV, CMP, ENT, 30" | 31 | L.F. | $61.75 | $1,914.25 | $50.00 | $1,550.00 | $30.00 | $930.00 | ||||
| 12 | APRON, METAL, 18" | 2 | Each | $99.75 | $199.50 | $200.00 | $400.00 | $100.00 | $200.00 | ||||
| 13 | APRON, METAL, 30" | 2 | Each | $254.75 | $509.50 | $400.00 | $800.00 | $200.00 | $400.00 | ||||
| 14 | STORM SWR, G-MAIN, TRENCHED, RCP 24" | 215 | L.F. | $34.73 | $7,466.95 | $50.00 | $10,750.00 | $31.00 | $6,665.00 | ||||
| 15 | STORM SWR, G-MAIN, TRENCHED, RCP 36" | 122 | L.F. | $64.60 | $7,881.20 | $85.00 | $10,370.00 | $49.00 | $5,978.00 | ||||
| 16 | ENGINEERING FABRIC | 5534 | S.Y. | $0.90 | $4,980.60 | $0.85 | $4,703.90 | $2.00 | $11,068.00 | ||||
| 17 | CONC GROUT-RIPRAP | 40.7 | Tons | $148.73 | $6,053.311 | $125.00 | $5,087.50 | $130.00 | $5,291.00 | ||||
| 18 | REVETMENT, CLASS D | 5483 | Tons | $34.26 | $187,847.58 | $30.00 | $164,490.00 | $29.00 | $159,007.00 | ||||
| 19 | STRIPING | 4895 | L.F. | $0.24 | $1,174.80 | $0.20 | $979.00 | $1.00 | $4,895.00 | ||||
| 20 | MULCH | 7 | Acres | $700.00 | $4,900.00 | $400.00 | $2,800.00 | $700.00 | $4,900.00 | ||||
| 21 | SEED+FERTILIZER | 6.3 | Acres | $525.00 | $3,307.50 | $1,500.00 | $9,450.00 | $525.00 | $3,307.50 | ||||
| 22 | TURF REINFORCEMENT MAT, TYPE 4 | 2028 | S.Y. | $15.00 | $30,420.00 | $10.00 | $20,280.00 | $15.00 | $30,420.00 | ||||
| 23 | SILT FENCE | 125 | L.F. | $0.01 | $1.25 | $4.00 | $500.00 | $1.00 | $125.00 | ||||
| 24 | RMVL SILT FENCE | 125 | L.F. | $0.02 | $2.50 | $1.00 | $125.00 | $1.00 | $125.00 | ||||
| 25 | FENCING | 2375 | L.F. | $6.00 | $14,250.00 | $5.00 | $11,875.00 | $5.75 | $13,656.25 | ||||
| 26 | HANDICAP PARKING SIGN | 5 | Each | $330.00 | $1,650.00 | $350.00 | $1,750.00 | $500.00 | $2,500.00 | ||||
| 27 | RIGGING LANE SIGN | 3 | Each | $329.08 | $987.24 | $350.00 | $1,050.00 | $500.00 | $1,500.00 | ||||
| 28 | TREE REMOVAL | 4 | Each | $485.00 | $1,940.00 | $100.00 | $400.00 | $400.00 | $1,600.00 | ||||
| 29 | DEBRIS REMOVAL | 1 | L.S. | $2,401.25 | $2,401.25 | $1,000.00 | $1,000.00 | $2,700.00 | $2,700.00 | ||||
| 30 | TYPE 1 SIGN POST - INSTALL ONLY | 10 | Each | $232.50 | $2,325.00 | $20.00 | $200.00 | $50.00 | $500.00 | ||||
| 31 | 3/8" MINUS CRUSHED STONE | 62 | Tons | $25.68 | $1,592.16 | $25.00 | $1,550.00 | $22.00 | $1,364.00 | ||||
| 32 | Construction Survey | 1 | L.S. | $7,500.00 | $7,500.00 | $10,000.00 | $10,000.00 | $9,500.00 | $9,500.00 | ||||
| $919,892.701 | $1,097,720.40 | $1,104,945.65 | |||||||||||
4 | 5 | 6 | |||||||||||
| Estimated Cost: $1,400,000.00 | Contractor: | Fye Excavating | Smith Seeding Inc | McCarthy Improvement Company | |||||||||
| Funding Source: 40% Marine Fuel Tax, 30% F&W Trust-Fisheries Non-Habitat Stamp, 30% Federal-Boat Safety (Coast Guard), | 10165 Sperry Rd | 219 N First St | 5401 Victoria Avenue | ||||||||||
| Sperry IA 52650 | Eldridge IA 52748 | Davenport IA 52807 | |||||||||||
| Plan Sets Requested: 16 | Quantities | 319-985-2200 | 563-285-2604 | 563-359-0321 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | CLEARING AND GRUBBING | 12 | Acres | $1,800.00 | $21,600.00 | $500.00 | $6,000.00 | $750.00 | $9,000.00 | ||||
| 2 | EXCAVATION, CL 10 RDWY+BORROW | 32911 | C.Y. | $3.00 | $98,733.00 | $2.74 | $90,176.14 | $3.50 | $115,188.50 | ||||
| 3 | GRANULAR SUBBASE | 4798 | Tons | $18.80 | $90,202.40 | $24.80 | $118,990.40 | $19.50 | $93,561.00 | ||||
| 4 | GRANULAR SHLD, TYPE A | 248 | Tons | $21.85 | $5,418.80 | $25.85 | $6,410.80 | $22.00 | $5,456.00 | ||||
| 5 | STD/S-F PCC PAV'T, CL A CL 3. 7" | 12616 | S.Y. | $34.68 | $437,522.88 | $32.00 | $403,712.00 | $27.50 | $346,940.00 | ||||
| 6 | GRANULAR SURF ON RD, CL A CR STONE | 1251 | Tons | $19.85 | $24,832.35 | $25.85 | $32,338.35 | $22.00 | $27,522.00 | ||||
| 7 | STRUCT CONCRETE (MISC.) | 436 | C.Y. | $239.70 | $104,509.20 | $325.00 | $141,700.00 | $345.00 | $150,420.00 | ||||
| 8 | APRON, CONC, 24" | 6 | Each | $638.00 | $3,828.00 | $1,000.00 | $6,000.00 | $850.00 | $5,100.00 | ||||
| 9 | APRON, CONC, 36" | 4 | Each | $900.00 | $3,600.00 | $2,000.00 | $8,000.00 | $1,350.00 | $5,400.00 | ||||
| 10 | CULV, CMP, ENT, 18" | 18 | L.F. | $28.00 | $504.00 | $40.00 | $720.00 | $40.00 | $720.00 | ||||
| 11 | CULV, CMP, ENT, 30" | 31 | L.F. | $40.50 | $1,255.50 | $50.00 | $1,550.00 | $50.00 | $1,550.00 | ||||
| 12 | APRON, METAL, 18" | 2 | Each | $134.00 | $268.00 | $300.00 | $600.00 | $200.00 | $400.00 | ||||
| 13 | APRON, METAL, 30" | 2 | Each | $260.00 | $520.00 | $300.00 | $600.00 | $450.00 | $900.00 | ||||
| 14 | STORM SWR, G-MAIN, TRENCHED, RCP 24" | 215 | L.F. | $35.00 | $7,525.00 | $60.00 | $12,900.00 | $48.00 | $10,320.00 | ||||
| 15 | STORM SWR, G-MAIN, TRENCHED, RCP 36" | 122 | L.F. | $52.50 | $6,405.00 | $120.00 | $14,640.00 | $73.00 | $8,906.00 | ||||
| 16 | ENGINEERING FABRIC | 5534 | S.Y. | $1.43 | $7,913.62 | $3.00 | $16,602.00 | $1.25 | $6,917.50 | ||||
| 17 | CONC GROUT-RIPRAP | 40.7 | Tons | $187.00 | $7,610.90 | $150.00 | $6,105.00 | $210.00 | $8,547.00 | ||||
| 18 | REVETMENT, CLASS D | 5483 | Tons | $33.30 | $182,583.90 | $33.30 | $182,583.90 | $38.00 | $208,354.00 | ||||
| 19 | STRIPING | 4895 | L.F. | $1.00 | $4,895.00 | $1.50 | $7,342.50 | $0.50 | $2,447.50 | ||||
| 20 | MULCH | 7 | Acres | $714.00 | $4,998.00 | $500.00 | $3,500.00 | $730.00 | $5,110.00 | ||||
| 21 | SEED+FERTILIZER | 6.3 | Acres | $791.00 | $4,983.30 | $1,000.00 | $6,300.00 | $650.00 | $4,095.00 | ||||
| 22 | TURF REINFORCEMENT MAT, TYPE 4 | 2028 | S.Y. | $18.88 | $38,288.64 | $12.00 | $24,336.00 | $19.00 | $38,532.00 | ||||
| 23 | SILT FENCE | 125 | L.F. | $2.05 | $256.25 | $3.00 | $375.00 | $2.00 | $250.00 | ||||
| 24 | RMVL SILT FENCE | 125 | L.F. | $0.36 | $45.00 | $1.00 | $125.00 | $0.50 | $62.50 | ||||
| 25 | FENCING | 2375 | L.F. | $7.00 | $16,625.00 | $5.75 | $13,656.25 | $6.00 | $14,250.00 | ||||
| 26 | HANDICAP PARKING SIGN | 5 | Each | $500.00 | $2,500.00 | $125.00 | $625.00 | $450.00 | $2,250.00 | ||||
| 27 | RIGGING LANE SIGN | 3 | Each | $500.00 | $1,500.00 | $125.00 | $375.00 | $450.00 | $1,350.00 | ||||
| 28 | TREE REMOVAL | 4 | Each | $150.00 | $600.00 | $500.00 | $2,000.00 | $300.00 | $1,200.00 | ||||
| 29 | DEBRIS REMOVAL | 1 | L.S. | $1,500.00 | $1,500.00 | $2,000.00 | $2,000.00 | $5,000.00 | $5,000.00 | ||||
| 30 | TYPE 1 SIGN POST - INSTALL ONLY | 10 | Each | $50.00 | $500.00 | $50.00 | $500.00 | $50.00 | $500.00 | ||||
| 31 | 3/8" MINUS CRUSHED STONE | 62 | Tons | $12.55 | $778.10 | $16.85 | $1,044.70 | $19.00 | $1,178.00 | ||||
| 32 | Construction Survey | 1 | L.S. | $32,302.16 | $32,302.16 | $19,000.00 | $19,000.00 | $51,500.00 | $51,500.00 | ||||
| $1,114,604.00 | $1,130,808.04 | $1,132,927.00 | |||||||||||
7 | 8 | 9 | |||||||||||
| Estimated Cost: $1,400,000.00 | Contractor: | Valley Construction Company | Brandt Construction Co. | Hawkeye Paving Corporation | |||||||||
| Funding Source: 40% Marine Fuel Tax, 30% F&W Trust-Fisheries Non-Habitat Stamp, 30% Federal-Boat Safety (Coast Guard), | 3610 78th Ave West | 700 4th St W | 801 42nd St | ||||||||||
| Rock Island IL 51201 | Milan IL 61264 | Bettendorf IA 52722 | |||||||||||
| Plan Sets Requested: 16 | Quantities | 309-787-0292 | 309-787-4644 | 563-355-6834 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | CLEARING AND GRUBBING | 12 | Acres | $500.00 | $6,000.00 | $325.00 | $3,900.00 | $500.00 | $6,000.00 | ||||
| 2 | EXCAVATION, CL 10 RDWY+BORROW | 32911 | C.Y. | $3.50 | $115,188.50 | $3.10 | $102,024.10 | $4.50 | $148,099.50 | ||||
| 3 | GRANULAR SUBBASE | 4798 | Tons | $24.80 | $118,990.40 | $17.75 | $85,164.50 | $25.50 | $122,349.00 | ||||
| 4 | GRANULAR SHLD, TYPE A | 248 | Tons | $25.00 | $6,200.00 | $24.00 | $5,952.00 | $24.00 | $5,952.00 | ||||
| 5 | STD/S-F PCC PAV'T, CL A CL 3. 7" | 12616 | S.Y. | $35.00 | $441,560.00 | $35.50 | $447,868.00 | $32.50 | $410,020.00 | ||||
| 6 | GRANULAR SURF ON RD, CL A CR STONE | 1251 | Tons | $23.00 | $28,773.00 | $20.25 | $25,332.75 | $22.00 | $27,522.00 | ||||
| 7 | STRUCT CONCRETE (MISC.) | 436 | C.Y. | $383.00 | $166,988.00 | $385.00 | $167,860.00 | $365.00 | $159,140.00 | ||||
| 8 | APRON, CONC, 24" | 6 | Each | $1,300.00 | $7,800.00 | $675.00 | $4,050.00 | $1,250.00 | $7,500.00 | ||||
| 9 | APRON, CONC, 36" | 4 | Each | $1,900.00 | $7,600.00 | $1,000.00 | $4,000.00 | $1,550.00 | $6,200.00 | ||||
| 10 | CULV, CMP, ENT, 18" | 18 | L.F. | $33.00 | $594.00 | $33.00 | $594.00 | $45.00 | $810.00 | ||||
| 11 | CULV, CMP, ENT, 30" | 31 | L.F. | $45.00 | $1,395.00 | $47.25 | $1,464.75 | $75.00 | $2,325.00 | ||||
| 12 | APRON, METAL, 18" | 2 | Each | $100.00 | $200.00 | $195.00 | $390.00 | $300.00 | $600.00 | ||||
| 13 | APRON, METAL, 30" | 2 | Each | $230.00 | $460.00 | $425.00 | $850.00 | $700.00 | $1,400.00 | ||||
| 14 | STORM SWR, G-MAIN, TRENCHED, RCP 24" | 215 | L.F. | $45.00 | $9,675.00 | $51.00 | $10,965.00 | $48.00 | $10,320.00 | ||||
| 15 | STORM SWR, G-MAIN, TRENCHED, RCP 36" | 122 | L.F. | $75.00 | $9,150.00 | $78.00 | $9,516.00 | $88.00 | $10,736.00 | ||||
| 16 | ENGINEERING FABRIC | 5534 | S.Y. | $2.00 | $11,068.00 | $1.35 | $7,470.90 | $2.00 | $11,068.00 | ||||
| 17 | CONC GROUT-RIPRAP | 40.7 | Tons | $150.00 | $6,105.00 | $147.00 | $5,982.90 | $200.00 | $8,140.00 | ||||
| 18 | REVETMENT, CLASS D | 5483 | Tons | $30.00 | $164,490.00 | $37.00 | $202,871.00 | $36.00 | $197,388.00 | ||||
| 19 | STRIPING | 4895 | L.F. | $0.32 | $1,566.40 | $1.15 | $5,629.25 | $1.10 | $5,384.50 | ||||
| 20 | MULCH | 7 | Acres | $500.00 | $3,500.00 | $560.00 | $3,920.00 | $750.00 | $5,250.00 | ||||
| 21 | SEED+FERTILIZER | 6.3 | Acres | $1,500.00 | $9,450.00 | $1,675.00 | $10,552.50 | $850.00 | $5,355.00 | ||||
| 22 | TURF REINFORCEMENT MAT, TYPE 4 | 2028 | S.Y. | $10.00 | $20,280.00 | $11.20 | $22,713.60 | $20.00 | $40,560.00 | ||||
| 23 | SILT FENCE | 125 | L.F. | $4.00 | $500.00 | $4.50 | $562.50 | $2.50 | $312.50 | ||||
| 24 | RMVL SILT FENCE | 125 | L.F. | $1.00 | $125.00 | $1.15 | $143.75 | $0.50 | $62.50 | ||||
| 25 | FENCING | 2375 | L.F. | $5.75 | $13,656.25 | $6.50 | $15,437.50 | $6.50 | $15,437.50 | ||||
| 26 | HANDICAP PARKING SIGN | 5 | Each | $330.00 | $1,650.00 | $560.00 | $2,800.00 | $550.00 | $2,750.00 | ||||
| 27 | RIGGING LANE SIGN | 3 | Each | $330.00 | $990.00 | $560.00 | $1,680.00 | $550.00 | $1,650.00 | ||||
| 28 | TREE REMOVAL | 4 | Each | $200.00 | $800.00 | $840.00 | $3,360.00 | $800.00 | $3,200.00 | ||||
| 29 | DEBRIS REMOVAL | 1 | L.S. | $500.00 | $500.00 | $4,000.00 | $4,000.00 | $2,000.00 | $2,000.00 | ||||
| 30 | TYPE 1 SIGN POST - INSTALL ONLY | 10 | Each | $80.00 | $800.00 | $56.00 | $560.00 | $60.00 | $600.00 | ||||
| 31 | 3/8" MINUS CRUSHED STONE | 62 | Tons | $29.00 | $1,798.00 | $11.50 | $713.00 | $28.00 | $1,736.00 | ||||
| 32 | Construction Survey | 1 | L.S. | $10,500.00 | $10,500.00 | $10,625.00 | $10,625.00 | $15,000.00 | $15,000.00 | ||||
| $1,168,352.55 | $1,168,953.00 | $1,234,867.50 | |||||||||||
10 | 11 | 12 | |||||||||||
| Estimated Cost: $1,400,000.00 | Contractor: | Ardo Schmidt Construction Inc. | Portzen Construction, Inc. | ||||||||||
| Funding Source: 40% Marine Fuel Tax, 30% F&W Trust-Fisheries Non-Habitat Stamp, 30% Federal-Boat Safety (Coast Guard), | 35010 Hwy 64 | 205 Stone Valley Dr | |||||||||||
| Preston IA 52069-9344 | Dubuque IA 52003 | ||||||||||||
| Plan Sets Requested: 16 | Quantities | 563-689-4875 | 563-557-7642 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | CLEARING AND GRUBBING | 12 | Acres | $333.34 | $4,000.08 | $5,500.00 | $66,000.00 | $0.00 | |||||
| 2 | EXCAVATION, CL 10 RDWY+BORROW | 32911 | C.Y. | $2.00 | $65,822.00 | $3.50 | $115,188.50 | $0.00 | |||||
| 3 | GRANULAR SUBBASE | 4798 | Tons | $21.80 | $104,596.40 | $19.00 | $91,162.00 | $0.00 | |||||
| 4 | GRANULAR SHLD, TYPE A | 248 | Tons | $22.85 | $5,666.80 | $24.00 | $5,952.00 | $0.00 | |||||
| 5 | STD/S-F PCC PAV'T, CL A CL 3. 7" | 12616 | S.Y. | $43.20 | $545,011.20 | $35.00 | $441,560.00 | $0.00 | |||||
| 6 | GRANULAR SURF ON RD, CL A CR STONE | 1251 | Tons | $22.85 | $28,585.35 | $20.00 | $25,020.00 | $0.00 | |||||
| 7 | STRUCT CONCRETE (MISC.) | 436 | C.Y. | $300.00 | $130,800.00 | $600.00 | $261,600.00 | $0.00 | |||||
| 8 | APRON, CONC, 24" | 6 | Each | $800.00 | $4,800.00 | $1,200.00 | $7,200.00 | $0.00 | |||||
| 9 | APRON, CONC, 36" | 4 | Each | $1,325.00 | $5,300.00 | $1,800.00 | $7,200.00 | $0.00 | |||||
| 10 | CULV, CMP, ENT, 18" | 18 | L.F. | $27.00 | $486.00 | $45.00 | $810.00 | $0.00 | |||||
| 11 | CULV, CMP, ENT, 30" | 31 | L.F. | $40.00 | $1,240.00 | $60.00 | $1,860.00 | $0.00 | |||||
| 12 | APRON, METAL, 18" | 2 | Each | $156.00 | $312.00 | $350.00 | $700.00 | $0.00 | |||||
| 13 | APRON, METAL, 30" | 2 | Each | $375.00 | $750.00 | $550.00 | $1,100.00 | $0.00 | |||||
| 14 | STORM SWR, G-MAIN, TRENCHED, RCP 24" | 215 | L.F. | $70.00 | $15,050.00 | $80.00 | $17,200.00 | $0.00 | |||||
| 15 | STORM SWR, G-MAIN, TRENCHED, RCP 36" | 122 | L.F. | $95.00 | $11,590.00 | $85.00 | $10,370.00 | $0.00 | |||||
| 16 | ENGINEERING FABRIC | 5534 | S.Y. | $1.45 | $8,024.30 | $2.00 | $11,068.00 | $0.00 | |||||
| 17 | CONC GROUT-RIPRAP | 40.7 | Tons | $125.50 | $5,107.85 | $150.00 | $6,105.00 | $0.00 | |||||
| 18 | REVETMENT, CLASS D | 5483 | Tons | $37.30 | $204,515.90 | $38.00 | $208,354.00 | $0.00 | |||||
| 19 | STRIPING | 4895 | L.F. | $1.62 | $7,929.90 | $2.00 | $9,790.00 | $0.00 | |||||
| 20 | MULCH | 7 | Acres | $1,050.00 | $7,350.00 | $770.00 | $5,390.00 | $0.00 | |||||
| 21 | SEED+FERTILIZER | 6.3 | Acres | $787.50 | $4,961.25 | $850.00 | $5,355.00 | $0.00 | |||||
| 22 | TURF REINFORCEMENT MAT, TYPE 4 | 2028 | S.Y. | $21.50 | $43,602.00 | $19.50 | $39,546.00 | $0.00 | |||||
| 23 | SILT FENCE | 125 | L.F. | $4.00 | $500.00 | $3.00 | $375.00 | $0.00 | |||||
| 24 | RMVL SILT FENCE | 125 | L.F. | $2.00 | $250.00 | $1.00 | $125.00 | $0.00 | |||||
| 25 | FENCING | 2375 | L.F. | $5.00 | $11,875.00 | $6.25 | $14,843.75 | $0.00 | |||||
| 26 | HANDICAP PARKING SIGN | 5 | Each | $200.00 | $1,000.00 | $175.00 | $875.00 | $0.00 | |||||
| 27 | RIGGING LANE SIGN | 3 | Each | $200.00 | $600.00 | $175.00 | $525.00 | $0.00 | |||||
| 28 | TREE REMOVAL | 4 | Each | $500.00 | $2,000.00 | $500.00 | $2,000.00 | $0.00 | |||||
| 29 | DEBRIS REMOVAL | 1 | L.S. | $2,500.00 | $2,500.00 | $7,500.00 | $7,500.00 | $0.00 | |||||
| 30 | TYPE 1 SIGN POST - INSTALL ONLY | 10 | Each | $150.00 | $1,500.00 | $125.00 | $1,250.00 | $0.00 | |||||
| 31 | 3/8" MINUS CRUSHED STONE | 62 | Tons | $18.55 | $1,150.10 | $24.00 | $1,488.00 | $0.00 | |||||
| 32 | Construction Survey | 1 | L.S. | $8,000.00 | $8,000.00 | $170,000.00 | $170,000.00 | $0.00 | |||||
| $1,234,876.13 | $1,537,512.25 | $0.00 | |||||||||||