IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Wood Duck Marsh | Date: 9/24/2015 | Project No. |
| Replace 3 Water Control Structures | County: | WINNEBAGO | Time: 3:00 p.m. | 13-02-95-01 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $35,000.00 | Contractor: | Larson Contracting Central, LLC | Jensen Excavating | ||||||||||
| Funding Source: 100% F&W Trust-Wildlife Habitat Stamp, | 508 West Main St | 74884 270th St | |||||||||||
| Lake Mills IA 50450 | Clarks Grove MN 56016 | ||||||||||||
| Plan Sets Requested: 0 | Quantities | 641-592-5800 | 507-383-1556 | ||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Mobilization | 1 | L.S. | $1,650.00 | $1,650.00 | $5,000.00 | $5,000.00 | $0.00 | |||||
| 2 | Channel Excavation | 273 | C.Y. | $4.40 | $1,201.20 | $10.00 | $2,730.00 | $0.00 | |||||
| 3 | Dike Repair | 220 | C.Y. | $5.50 | $1,210.00 | $20.00 | $4,400.00 | $0.00 | |||||
| 4 | Inline Water Control Structure Riser (Install Only) | 3 | Each | $1,787.50 | $5,362.50 | $1,000.00 | $3,000.00 | $0.00 | |||||
| 5 | CMP on Water Control Structures (Install Only) | 120 | L.F. | $22.55 | $2,706.00 | $20.00 | $2,400.00 | $0.00 | |||||
| 6 | CMP on Water Control Structures | 58 | L.F. | $30.40 | $1,763.20 | $47.00 | $2,726.00 | $0.00 | |||||
| 7 | Anti-Seep Collars (Install Only) | 6 | Each | $154.00 | $924.00 | $100.00 | $600.00 | $0.00 | |||||
| 8 | 24" CMP | 53 | L.F. | $30.40 | $1,611.20 | $47.00 | $2,491.00 | $0.00 | |||||
| 9 | 24" CMP Connecting Bands (Install Only) | 4 | Each | $33.00 | $132.00 | $1.00 | $4.00 | $0.00 | |||||
| 10 | Class "E" Revetment (Riprap) | 8 | Tons | $38.50 | $308.00 | $50.00 | $400.00 | $0.00 | |||||
| 11 | 14 GA 2"x4"x48" Galvanized Steel Welded Wire | 120 | L.F. | $2.75 | $330.00 | $10.00 | $1,200.00 | $0.00 | |||||
| 12 | Trash Guard (Install Only) | 3 | Each | $77.00 | $231.00 | $1.00 | $3.00 | $0.00 | |||||
| 13 | Rat Guard (Install Only) | 3 | Each | $77.00 | $231.00 | $1.00 | $3.00 | $0.00 | |||||
| 14 | Engineering Fabric | 15 | S.Y. | $2.80 | $42.00 | $2.00 | $30.00 | $0.00 | |||||
| 15 | Seeding and Site Restoration | 1 | L.S. | $4,840.00 | $4,840.00 | $4,000.00 | $4,000.00 | $0.00 | |||||
| $22,542.10 | $28,987.00 | $0.00 | |||||||||||