IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   D.U. Marsh  Date: 5/17/2012  Project No.  
  repair water control structure  County:   CLAY  Time: 3:00 p.m.  12-01-21-01

 

 
1
2
3
Estimated Cost: $17,000.00
Contractor: 
Christian Brothers ExcavatingRedings Gravel & Excavating
Funding Source: 100% F&W Trust - Other, 2070 485th St
2001 East Oak St
PO Box 158

Sioux Rapids IA  50585Algona IA  50511  
Plan Sets Requested: 0
Quantities
712-390-4001515-295-3661
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$1,300.00$1,300.00 $2,920.00$2,920.00 $0.00 
212" Dual Wall P.E. Tubing (non perf)180L.F.$15.50$2,790.00 $23.00$4,140.00 $0.00 
315" CMP20L.F.$23.00$460.00 $28.00$560.00 $0.00 
4Fieldstone Rip Rap (12" to 18")10Tons$50.00$500.00 $120.00$1,200.00 $0.00 
564"x43" CMP Arch Pipe24L.F.$340.00$8,160.00 $810.00$19,440.00 $0.00 
6Arch Pipe Concrete Collar1L.S.$1,500.00$1,500.00 $1,200.00$1,200.00 $0.00 
712"x 12" Water Control Structure1L.S.$2,100.00$2,100.00 $2,370.00$2,370.00 $0.00 
88" Sch 40 PVC19L.F.$45.00$855.00 $64.00$1,216.00 $0.00 
      $17,665.00  $33,046.00  $0.00 
 



 

10/14/2026