IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Pilot Knob State Park  Date: 8/15/2013  Project No.  
  SHOWER BUILDING, HOST CAMP SITE, WATER TREATMENT BUILDING & DUMP STATION  County:   HANCOCK  Time: 11:00 a.m.  13-02-41-01

 

 
1
2
3
Estimated Cost: $485,000.00
Contractor: 
Dean Snyder ConstructionLarson Contracting Central, LLCKingland Construction Services
Funding Source: 100% Infrastructure 2012, 913 N 14th St
508 W Main St
1105 East E St
Clear Lake IA  50428Lake Mills IA  50450Forest City IA  50436
Plan Sets Requested: 9
Quantities
641-357-2283641-592-5800641-585-0101
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1DEMOLITION1L.S.$2,000.00$2,000.00 $10,000.00$10,000.00 $14,107.00$14,107.00 
2CLEARING AND GRUBBING1L.S.$5,060.00$5,060.00 $10,000.00$10,000.00 $7,596.00$7,596.00 
3SITE WORK AND UTILITY CONNECTIONS1L.S.$500.00$500.00 $8,000.00$8,000.00 $32,556.00$32,556.00 
4CHEYENNE PRECAST CONCRETE SHOWER BUILDING1Each$221,500.00$221,500.00 $197,885.00$197,885.00 $266,121.00$266,121.00 
5CLASS "A" CRUSHED STONE477Tons$22.00$10,494.00 $30.00$14,310.00 $20.62$9,835.74 
6SIDEWALK, PCC, 6"103S.Y.$68.25$7,029.75 $60.00$6,180.00 $49.86$5,135.58 
7PARKING LOT, PCC, 6"61S.Y.$51.00$3,111.00 $60.00$3,660.00 $63.40$3,867.40 
8SIGNING1Each$3,175.00$3,175.00 $500.00$500.00 $332.00$332.00 
9DRAIN-DOWN PIT1L.S.$4,000.00$4,000.00 $4,218.00$4,218.00 $6,511.00$6,511.00 
10PRECAST CONCRETE PARKING WHEEL STOPS1Each$100.00$100.00 $350.00$350.00 $100.00$100.00 
11EARTHWORK, CLASS 10, EXCAVATION500C.Y.$5.00$2,500.00 $40.00$20,000.00 $16.40$8,200.00 
12EARTHWORK, CLASS 10, BORROW460C.Y.$5.00$2,300.00 $25.00$11,500.00 $16.27$7,484.20 
13ENGINEERING FABRIC139S.Y.$8.00$1,112.00 $5.50$764.50 $6.51$904.89 
14MACADAM STONE31Tons$34.00$1,054.00 $50.00$1,550.00 $27.36$848.16 
153/8" MINUS CRUSHED STONE14Tons$33.00$462.00 $50.00$700.00 $21.64$302.96 
16PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT2.7STA.$200.00$540.00 $300.00$810.00 $128.38$346.626 
17BOLLARD3Each$530.00$1,590.00 $600.00$1,800.00 $1,000.00$3,000.00 
18REMOVE EXISTING DUMP STATION1L.S.$3,100.00$3,100.00 $3,000.00$3,000.00 $16,278.00$16,278.00 
19REMOVE EXISTING MANHOLES2Each$1,500.00$3,000.00 $750.00$1,500.00 $813.50$1,627.00 
20REMOVE EXISTING SANITARY SEWER PIPE, 6"39.36L.F.$10.00$393.60 $30.00$1,180.80 $19.52$768.307 
21ABANDON EXISTING SANITARY SEWER PIPE, 4"68.53L.F.$12.04$825.101 $12.00$822.36 $16.55$1,134.172 
22MANHOLE, SW-301, 48"4Each$2,500.00$10,000.00 $4,290.00$17,160.00 $4,340.75$17,363.00 
23SANITARY SEWER PIPE, 4" PVC497.03L.F.$25.00$12,425.75 $25.00$12,425.75 $32.55$16,178.327 
24SANITARY SEWER PIPE, 6" PVC478.1L.F.$27.00$12,908.70 $40.00$19,124.00 $35.82$17,125.542 
25WATER MAIN, 1" HDPE361L.F.$25.00$9,025.00 $3.58$1,292.38 $3.00$1,083.00 
26WATER MAIN, 2" HDPE165L.F.$27.00$4,455.00 $7.77$1,282.05 $7.00$1,155.00 
27SCHWEITZER UTILITY BUILDING, SMALL1Each$35,000.00$35,000.00 $28,000.00$28,000.00 $29,439.00$29,439.00 
28WATER TREATMENT SYSTEM1L.S.$17,151.00$17,151.00 $27,643.00$27,643.00 $24,689.00$24,689.00 
29ELECTRICAL SERVICE228L.F.$31.15$7,102.20 $34.25$7,809.00 $15.44$3,520.32 
30ELECTRICAL CAMP PEDESTAL1Each$620.00$620.00 $1,650.00$1,650.00 $1,627.00$1,627.00 
31RV TO SANITARY SEWER CONNECTION1Each$1,700.00$1,700.00 $300.00$300.00 $542.00$542.00 
32YARD HYDRANT1Each$2,200.00$2,200.00 $1,000.00$1,000.00 $1,627.00$1,627.00 
33INSTALL WIRE GATE AND POSTS2Each$1,600.00$3,200.00 $1,000.00$2,000.00 $2,084.00$4,168.00 
34INSTALL METAL GATE1Each$600.00$600.00 $500.00$500.00 $2,084.00$2,084.00 
35REMOVE GATE POSTS2Each$25.00$50.00 $250.00$500.00 $250.00$500.00 
36CONCRETE PAVING, 6" C4 MIX458S.Y.$55.17$25,267.86 $65.00$29,770.00 $48.00$21,984.00 
37DUMP STATION1L.S.$5,950.00$5,950.00 $4,000.00$4,000.00 $3,798.00$3,798.00 
38CONCRETE ISLAND AT DUMP STATION30S.Y.$130.00$3,900.00 $80.00$2,400.00 $82.00$2,460.00 
39EROSION CONTROL584L.F.$3.50$2,044.00 $5.50$3,212.00 $4.00$2,336.00 
40CONSTRUCTION STAKING1L.S.$3,500.00$3,500.00 $4,000.00$4,000.00 $4,064.00$4,064.00 
41MOBILIZATION1L.S.$46,146.04$46,146.04 $15,000.00$15,000.00 $7,598.00$7,598.00 
42DROP INLET2Each$3,000.00$6,000.00 $5,000.00$10,000.00 $542.50$1,085.00 
43SANITARY SEWER PIPE, 4" C90040L.F.$10.00$400.00 $25.00$1,000.00 $50.00$2,000.00 
      $483,492.001  $488,798.84  $553,482.223 
 



 