| Bids For: | Location: | Pleasant Creek State Rec Area | Date: 10/18/2012 | Project No. |
| campground and shelter electric | County: | LINN | Time: 11:00 a.m. | 12-06-57-03 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $235,000.00 | Contractor: | Connolly Construction Inc | Engineering Consultants Inc [ECINC] | JB Holland Construction | |||||||||
| Funding Source: 100% Health and Safety Account, | 18409 N Cascade Rd PO Box 68 | 1680 Davis Avenue Suite A | 2092 HWY 9 West | ||||||||||
| Peosta IA 52068 | Nichols IA 52766 | Decorah IA 52101 | |||||||||||
| Plan Sets Requested: 6 | Quantities | 563-876-3225 | 319-723-4440 | 563-382-2901 | |||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Camp Pad Excavation, Class 10 | 847 | C.Y. | $13.80 | $11,688.60 | $15.50 | $13,128.50 | $25.26 | $21,395.22 | ||||
| 2 | Macadam Stone Base Material, 5" | 975 | Tons | $18.05 | $17,598.75 | $18.85 | $18,378.75 | $18.00 | $17,550.00 | ||||
| 3 | Granular Surfacing, Crushed Limestone, 2" Depth | 400 | Tons | $11.10 | $4,440.00 | $24.38 | $9,752.00 | $11.75 | $4,700.00 | ||||
| 4 | Engineering Fabric | 2770 | S.Y. | $1.95 | $5,401.50 | $2.10 | $5,817.00 | $1.50 | $4,155.00 | ||||
| 5 | 4" Dia PVC SDR 35 Sewer Pipe, with Detectable Warning Tape | 203 | L.F. | $27.65 | $5,612.95 | $15.50 | $3,146.50 | $21.00 | $4,263.00 | ||||
| 6 | RV to Sanitary Sewer Hook-up Assembly | 3 | Each | $860.00 | $2,580.00 | $1,050.85 | $3,152.55 | $905.00 | $2,715.00 | ||||
| 7 | 8" x 8" x 4" Wye connections | 3 | Each | $124.00 | $372.00 | $334.92 | $1,004.76 | $842.50 | $2,527.50 | ||||
| 8 | 1" HDPE Water Service Line, with Detectable Warning Tape | 500 | L.F. | $17.20 | $8,600.00 | $9.35 | $4,675.00 | $10.75 | $5,375.00 | ||||
| 9 | 1" Curb Stop/Valve Box | 9 | Each | $645.00 | $5,805.00 | $437.20 | $3,934.80 | $496.00 | $4,464.00 | ||||
| 10 | Yard Hydrants - New | 9 | Each | $692.00 | $6,228.00 | $3,025.38 | $27,228.42 | $2,975.00 | $26,775.00 | ||||
| 11 | Shelter LED Lighting Fixtures, including Power Receptacles | 4 | Each | $1,118.00 | $4,472.00 | $1,190.75 | $4,763.00 | $947.00 | $3,788.00 | ||||
| 12 | Conection to Transformers | 4 | Each | $559.00 | $2,236.00 | $250.00 | $1,000.00 | $505.00 | $2,020.00 | ||||
| 13 | Pad Mounted 600 Amp Distribution Panel, Complete | 1 | Each | $6,150.00 | $6,150.00 | $6,628.00 | $6,628.00 | $5,553.00 | $5,553.00 | ||||
| 14 | Pad Mounted 400 Amp Distribution Panel, Complete | 1 | Each | $4,471.00 | $4,471.00 | $5,128.00 | $5,128.00 | $4,039.00 | $4,039.00 | ||||
| 15 | Pad Mounted 100 Amp Distribution Panel, Complete | 2 | Each | $2,235.00 | $4,470.00 | $2,946.50 | $5,893.00 | $2,020.00 | $4,040.00 | ||||
| 16 | Campsite Outlet Post (Metallic Power Center), 50 Amp, Installed | 30 | Each | $335.00 | $10,050.00 | $345.00 | $10,350.00 | $303.00 | $9,090.00 | ||||
| 17 | Campsite Outlet Post (Metallic Power Center), 50 Amp, Spare | 1 | Each | $335.00 | $335.00 | $194.00 | $194.00 | $303.00 | $303.00 | ||||
| 18 | Trench, Single Circuit Secondary | 3943 | L.F. | $2.25 | $8,871.75 | $2.24 | $8,832.32 | $2.00 | $7,886.00 | ||||
| 19 | Trench, Double Circuit Secondary | 22 | L.F. | $2.25 | $49.50 | $10.00 | $220.00 | $2.00 | $44.00 | ||||
| 20 | Detectable Warning Tape, 3" Electrical | 3987 | L.F. | $0.25 | $996.75 | $0.05 | $199.35 | $0.20 | $797.40 | ||||
| 21 | roadway Crossing Conduit, Schedule80 PVC | 111 | L.F. | $13.40 | $1,487.40 | $27.95 | $3,102.45 | $12.00 | $1,332.00 | ||||
| 22 | No. 6 AWG Grounding Conductor, Type THW or USE | 360 | L.F. | $0.90 | $324.00 | $0.70 | $252.00 | $0.80 | $288.00 | ||||
| 23 | No. 2 AWG Grounding Conductor, Type THW or USE | 2804 | L.F. | $2.10 | $5,888.40 | $1.35 | $3,785.40 | $1.87 | $5,243.48 | ||||
| 24 | No. 4 AWG Single Conductor Cable, Type USE | 210 | L.F. | $1.35 | $283.50 | $1.20 | $252.00 | $1.21 | $254.10 | ||||
| 25 | No. 1 AWG Single Conductor Cable, Type USE | 3582 | L.F. | $2.70 | $9,671.40 | $1.70 | $6,089.40 | $2.44 | $8,740.08 | ||||
| 26 | No. 3/0 AWG Single Conductor Cable, Type USE | 1812 | L.F. | $5.25 | $9,513.00 | $2.45 | $4,439.40 | $4.73 | $8,570.76 | ||||
| 27 | No. 4/0 AWG Single Conductor Cable, Type USE | 2376 | L.F. | $6.35 | $15,087.60 | $3.40 | $8,078.40 | $5.73 | $13,614.48 | ||||
| 28 | 250 AWG Single Conductor Cable, Type USE | 1488 | L.F. | $7.35 | $10,936.80 | $4.20 | $6,249.60 | $6.63 | $9,865.44 | ||||
| 29 | 300 AWG Single Conductor Cable, Type USE | 2736 | L.F. | $9.20 | $25,171.20 | $5.00 | $13,680.00 | $8.30 | $22,708.80 | ||||
| 30 | Drinking FountainRepalcement/Repair | 2 | Each | $3,890.00 | $7,780.00 | $6,980.00 | $13,960.00 | $4,750.00 | $9,500.00 | ||||
| 31 | Remove and Dispose Existing Fire Rings | 42 | Each | $28.25 | $1,186.50 | $35.00 | $1,470.00 | $150.00 | $6,300.00 | ||||
| 32 | Remove and Dispose Existing Yard Hydrants | 2 | Each | $336.00 | $672.00 | $100.00 | $200.00 | $150.00 | $300.00 | ||||
| 33 | Remove and Dispose Existing Drinking Fountains | 2 | Each | $336.00 | $672.00 | $100.00 | $200.00 | $250.00 | $500.00 | ||||
| 34 | Remove and Dispose Existing Electric Campsite Pedestals | 16 | Each | $35.55 | $568.80 | $200.00 | $3,200.00 | $50.50 | $808.00 | ||||
| 35 | Surface Restoration- Seeding, Fertilizing, & Mulching | 1 | L.S. | $3,915.00 | $3,915.00 | $5,500.00 | $5,500.00 | $4,050.00 | $4,050.00 | ||||
| 36 | Storom Water Pollution Prevention Plan (SWPPP) | 1 | L.S. | $2,815.00 | $2,815.00 | $1,200.00 | $1,200.00 | $3,000.00 | $3,000.00 | ||||
| 37 | Mobilization | 1 | L.S. | $8,970.00 | $8,970.00 | $19,109.00 | $19,109.00 | $7,500.00 | $7,500.00 | ||||
| $215,371.40 | $224,193.60 | $234,055.26 | |||||||||||