IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Keomah State Park  Date: 8/21/2014  Project No.  
  RECONSTRUCTION & RESURFACING OF VARIOUS ROADWAYS & PARKING AREAS  County:   MAHASKA  Time: 11:00 am  13-05-62-01

 

 
1
2
3
Estimated Cost: $1,356,074.00
Contractor: 
Wicks Construction CoCedar Valley Corp
Funding Source: 98% Park & Institutional Road Fund, 2% Reap LM - R500SL - Parking, 2201 State Hwy 9
PO Box 428
2637 Wagner Rd

Decorah IA  52101Waterloo IA  50703  
Plan Sets Requested: 7
Quantities
563-382-2325319-235-9537
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Excavation, Class 10, Roadway and Borrow5924C.Y.$10.35$61,313.40 $10.35$61,313.40 $0.00 
2Topsoil, Strip, Salvage and Spread4550C.Y.$10.35$47,092.50 $10.35$47,092.50 $0.00 
3Granular Shoulders, Type B30Tons$20.00$600.00 $24.50$735.00 $0.00 
4Shoulder Construction, Earth202.45STA.$240.00$48,588.00 $240.00$48,588.00 $0.00 
5Choke Stone Base90Tons$19.50$1,755.00 $19.50$1,755.00 $0.00 
6Macadam Stone Base165Tons$20.50$3,382.50 $20.50$3,382.50 $0.00 
7Cleaning and Preparation of Base0.97MI.$2,000.00$1,940.00 $2,000.00$1,940.00 $0.00 
8Excavation, Class 13, For Widening55C.Y.$19.50$1,072.50 $23.16$1,273.80 $0.00 
9Base Widening, 6 in. Hot Mix Asphalt Mixture76S.Y.$60.50$4,598.00 $60.50$4,598.00 $0.00 
10Pavement Scarification6613S.Y.$5.00$33,065.00 $5.00$33,065.00 $0.00 
11Standard or Slip Form PCC Pavement, Class C, Class 3 Durability, 6 in.13350S.Y.$23.11$308,518.50 $33.42$446,157.00 $0.00 
12Portland Cement Concrete Pavement Samples1L.S.$5,000.00$5,000.00 $800.00$800.00 $0.00 
13HMA (300K ESAL) Intermediate or Surface, 1/2" mix, No Special Friction Req'd1435Tons$73.35$105,257.25 $73.35$105,257.25 $0.00 
14Asphalt Binder, PG 64-2886.2Tons$735.00$63,357.00 $735.00$63,357.00 $0.00 
15Hot Mix Asphalt Pavement Samples1L.S.$2,500.00$2,500.00 $2,500.00$2,500.00 $0.00 
16Portland Cement Concrete Overlay, Furnish Only494C.Y.$86.00$42,484.00 $87.00$42,978.00 $0.00 
17Portland Cement Concrete Overlay, Placement Only (Whitetopping)3673S.Y.$5.57$20,458.61 $10.61$38,970.53 $0.00 
18Surfacing, Driveway, Class A Crushed Stone200Tons$20.00$4,000.00 $24.50$4,900.00 $0.00 
19Removal of Existing Structures1L.S.$10,000.00$10,000.00 $10,000.00$10,000.00 $0.00 
20Excavation, Class 20, For Roadway Pipe Culvert230C.Y.$5.50$1,265.00 $5.50$1,265.00 $0.00 
21Aprons, Concrete, 18 in. Dia.2Each$1,465.00$2,930.00 $1,465.00$2,930.00 $0.00 
22Aprons, Concrete, 24 in. Dia.2Each$1,875.00$3,750.00 $1,875.00$3,750.00 $0.00 
23Culvert, Concrete Roadway Pipe, 18 in. Dia.30L.F.$57.75$1,732.50 $57.75$1,732.50 $0.00 
24Culvert, Concrete Roadway Pipe, 24 in. Dia.16L.F.$69.50$1,112.00 $69.50$1,112.00 $0.00 
25Culvert, Concrete Roadway Pipe, 30 in. Dia.40L.F.$83.75$3,350.00 $83.75$3,350.00 $0.00 
26Aprons, Metal, 30 in. Dia.1Each$1,175.00$1,175.00 $1,175.00$1,175.00 $0.00 
27Culvert, Corrugated Polyethylene Roadway Pipe, 30 in.59L.F.$95.00$5,605.00 $95.00$5,605.00 $0.00 
28Intake, SW-5131Each$4,450.00$4,450.00 $4,450.00$4,450.00 $0.00 
29Subdrain, Longitudinal, (Shoulder) 4 in. Dia.10005L.F.$6.70$67,033.50 $6.70$67,033.50 $0.00 
30Subdrain Outlet, RF-19C2Each$170.00$340.00 $170.00$340.00 $0.00 
31Subdrain Outlet, RF-19E36Each$330.00$11,880.00 $330.00$11,880.00 $0.00 
32Engineering Fabric1154S.Y.$2.00$2,308.00 $2.00$2,308.00 $0.00 
33Revetment, Class E580Tons$44.50$25,810.00 $44.50$25,810.00 $0.00 
34Erosion Stone203Tons$34.00$6,902.00 $34.00$6,902.00 $0.00 
35Removal of Pavement11864S.Y.$3.80$45,083.20 $3.80$45,083.20 $0.00 
36Curb and Gutter, P.C. Concrete, 2.5 ft.358L.F.$5.00$1,790.00 $26.00$9,308.00 $0.00 
37Driveway, P.C. Concrete, 6 in.410S.Y.$50.00$20,500.00 $35.00$14,350.00 $0.00 
38Removal of Paved Driveway248S.Y.$5.00$1,240.00 $5.00$1,240.00 $0.00 
39Safety Closure8Each$150.00$1,200.00 $150.00$1,200.00 $0.00 
40Object Marker, Type 38Each$150.00$1,200.00 $150.00$1,200.00 $0.00 
41Construction Survey1L.S.$3,000.00$3,000.00 $4,000.00$4,000.00 $0.00 
42Painted Pavement Marking, Waterbourne or Solvent-Based340.63STA.$18.00$6,131.34 $18.00$6,131.34 $0.00 
43Traffic Control1L.S.$5,900.00$5,900.00 $17,700.00$17,700.00 $0.00 
44Mobilization1L.S.$50,000.00$50,000.00 $117,200.00$117,200.00 $0.00 
45Subbase2899C.Y.$32.50$94,217.50 $32.50$94,217.50 $0.00 
46Speed Hump4Each$4,000.00$16,000.00 $2,600.00$10,400.00 $0.00 
47Clearing and Grubbing1L.S.$35,000.00$35,000.00 $35,000.00$35,000.00 $0.00 
48Mulching10Acres$700.00$7,000.00 $700.00$7,000.00 $0.00 
49Stabilizing Crop (Seeding & Fertilizing)5Acres$750.00$3,750.00 $750.00$3,750.00 $0.00 
50Seeding and Fertilizing (Urban)5Acres$1,240.00$6,200.00 $1,240.00$6,200.00 $0.00 
51Special Ditch Control, Wood Excelsior Mat334SQ.$16.00$5,344.00 $16.00$5,344.00 $0.00 
52Silt Fence5060L.F.$2.00$10,120.00 $2.00$10,120.00 $0.00 
53Removal of Silt Fence or Silt Fence for Ditch Checks5060L.F.$0.50$2,530.00 $0.50$2,530.00 $0.00 
54Maintenance of Silt Fence or Silt Fence for Ditch Checks5060L.F.$0.50$2,530.00 $0.50$2,530.00 $0.00 
55Perimeter and Slope Sediment Control Device, 20 in. Dia.50L.F.$10.00$500.00 $10.00$500.00 $0.00 
      $1,223,861.30  $1,453,310.02  $0.00 
 



 

10/16/2026